5.—(1) The tests shall be carried out in accordance with Table 1.
(2) The meter position requirement given in Table 1 applies to induction meters only. Tolerance applies to the vertical wall on which the meter base is mounted and a horizontal reference line or edge on the meter such as the lower edge of the terminal block.
(3) (a) The order of the phases shall correspond to the sequence shown on the connection diagram.
(b)The voltages shall be balanced so that the voltage between any line and neutral or between any two lines shall not differ by more than 1.5% from the mean of the corresponding voltages.
(c)The currents shall be balanced so that the current in any conductor shall not differ by more than 2.5% from the mean of these currents.
(d)The phase displacement between the current and corresponding phase to neutral voltage shall not differ from other current and voltage phase displacements by more than 3° at any power factor under any specified load conditions.
(4) The test given in Table 1 in respect of external magnetic induction shall be carried out during commissioning or after major modification or refurbishing of a meter testing system. The test consists of determining the errors at 0.1Ib unity power factor with the meters normally connected and then determining the errors —
(a)for single phase meters, after reversing both current and voltage connections, for which half the difference between the two errors is the value of the variation;
(b)for polyphase meters, by making two additional measurements after each of the connections to the current circuits and to the voltage circuits are changed over 120° but with the phase sequence unaltered, for which the greatest difference between each error determined and the mean of the three errors is the value of the variation.
(5) Where all the errors of repaired meters are determined by Method B or Method C test an additional test in accordance with Method A shall be carried out. The Method A test shall be carried out at one of the loads used for the Method B or Method C test. The error obtained by the Method A test shall not differ by more than 0.6% from the error obtained at the same load value by the Method B or Method C test.
(6) The tests described in paragraph 4 shall continue until the error of meters can be calculated within a tolerance not greater than ±0.2%.
(7) Method A tests may be used for intermediate and high loads, at unity and at 0.5 power factor, and Method B or Method C tests for the low load, provided that an additional Method B or Method C test is carried out at one of the test load values used for the Method A tests.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: