- Y Diweddaraf sydd Ar Gael (Diwygiedig)
- Gwreiddiol (a wnaed Fel)
Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.
FROM a point approximately 41 metres south-east of the centre line of the east abutment of the existing bridge carrying the A13 over the River Lea (Bow Creek) to a point approximately 62 metres south-west of the centre line of the west abutment of the existing bridge carrying the A13 over the River Lea (Bow Creek).
Part of one span of 70 metres measured square to the river.
Not less than 4.49 metres above normal water level which is 8.30 metres above Ordnance Datum Newlyn to be maintained for the full width of the proposed bridge.
The maximum width of the bridge is 12.3 metres.
A navigation channel 27 metres wide will be maintained at water level.
Elevation square to navigational channel
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys: