Chwilio Deddfwriaeth

The Churnet Valley Light Railway Order 1996

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)

Rhagor o Adnoddau

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

Article 4(2)

SCHEDULE 1Works referred to in Article 4 In the District of Staffordshire Moorlands in the County of Staffordshire

Work No. 1

A station siding approximately 150 metres in length in the parish of Kingsley situated to the south east of Bridge No. 31 as marked on the deposited plans commencing at a junction with the Board’s railway approximately 20 metres south of the point marked 12.0 mile post on the deposited plans and terminating at a point approximately 35 metres south-east of the said Bridge No. 31.

Work No. 2

A siding approximately 20 metres in length in the parish of Kingsley commencing at a junction with Work No. 1 approximately 40 metres from its junction with the Board’s railway and terminating at a point 20 metres north-east of the point of commencement of the work.

Work No. 3

A passing loop of approximately 270 metres in length in the parish of Kingsley commencing at a junction with the Board’s railway at a point approximately 5 metres north north-west of Bridge No. 31 as marked on the deposited plans and terminating at a junction with the Board’s railway approximately 15 metres north north-west of Bridge No. 32 as marked on the deposited plans.

Work No. 4

A passing loop of approximately 320 metres in length in the parish of Ipstones commencing at a junction with the Board’s railway at a point approximately 45 metres south of Bridge No. 40 as marked on the deposited plans and terminating at a junction with the Board’s railway approximately 14 metres south of Bridge No. 42 as marked on the deposited plans.

Work No. 5

A passing loop of approximately 320 metres in length in the parish of Cheddleton commencing at a junction with the Board’s railway at a point approximately 180 metres south south-east of the point marked 16.50 mile post on the deposited plans and terminating at a point approximately 140 metres north north-east of the said 16.50 mile post.

Work No. 6

A railway of approximately 30 metres in length in the parish of Cheddleton commencing at a junction with the Board’s railway at a point approximately 46 metres south of the proposed extension to the up and down platforms of Cheddleton Station as marked on the deposited plans and terminating at a junction with the existing railway centre demonstration line approximately 32 metres north of the said point.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill