A.    Permitted development

The carrying out on agricultural land comprised in an agricultural unit of 5 hectares or more in area of—

(a)works for the erection, extension or alteration of a building; or

(b)any excavation or engineering operations,

which are reasonably necessary for the purposes of agriculture within that unit.

A.1    Development not permitted

Development is not permitted by Class A if—

(a)the development would be carried out on a separate parcel of land forming part of the unit which is less than 1 hectare in area;

(b)it would consist of, or include, the erection, extension or alteration of a dwelling;

(c)it would involve the provision of a building, structure or works not designed for agricultural purposes;

(d)the ground area which would be covered by—

(i)any works or structure (other than a fence) for accommodating livestock or any plant or machinery arising from engineering operations; or

(ii)any building erected or extended or altered by virtue of Class A,

would exceed 465 square metres, calculated as described in paragraph D.2 below;

(e)the height of any part of any building, structure or works within 3 kilometres of the perimeter of an aerodrome would exceed 3 metres;

(f)the height of any part of any building, structure or works not within 3 kilometres of the perimeter of an aerodrome would exceed 12 metres;

(g)any part of the development would be within 25 metres of a metalled part of a trunk road or classified road;

(h)it would consist of, or include, the erection or construction of, or the carrying out of any works to, a building, structure or an excavation used or to be used for the accommodation of livestock or for the storage of slurry or sewage sludge where the building, structure or excavation is, or would be, within 400 metres of the curtilage of a protected building; or

(i)it would involve excavations or engineering operations on or over article 1(6) land which are connected with fish farming.

A.2.    Conditions

(1) Development is permitted by Class A subject to the following conditions—

(a)where development is carried out within 400 metres of the curtilage of a protected building, any building, structure, excavation or works resulting from the development shall not be used for the accommodation of livestock except in the circumstances described in paragraph D.3 below or for the storage of slurry or sewage sludge;

(b)where the development involves—

(i)the extraction of any mineral from the land (including removal from any disused railway embankment); or

(ii)the removal of any mineral from a mineral-working deposit,

the mineral shall not be moved off the unit;

(c)waste materials shall not be brought on to the land from elsewhere for deposit except for use in works described in Class A(a) or in the provision of a hard surface and any materials so brought shall be incorporated forthwith into the building or works in question.

(2) Subject to paragraph (3), development consisting of—

(a)the erection, extension or alteration of a building;

(b)the formation or alteration of a private way;

(c)the carrying out of excavations or the deposit of waste material (where the relevant area, as defined in paragraph D.4 below, exceeds 0.5 hectare); or

(d)the placing or assembly of a tank in any waters,

is permitted by Class A subject to the following conditions—

(i)the developer shall, before beginning the development, apply to the local planning authority for a determination as to whether the prior approval of the authority will be required to the siting, design and external appearance of the building, the siting and means of construction of the private way, the siting of the excavation or deposit or the siting and appearance of the tank, as the case may be;

(ii)the application shall be accompanied by a written description of the proposed development and of the materials to be used and a plan indicating the site together with any fee required to be paid;

(iii)the development shall not be begun before the occurrence of one of the following—

(aa)the receipt by the applicant from the local planning authority of a written notice of their determination that such prior approval is not required;

(bb)where the local planning authority give the applicant notice within 28 days following the date of receiving his application of their determination that such prior approval is required, the giving of such approval; or

(cc)the expiry of 28 days following the date on which the application was received by the local planning authority without the local planning authority making any determination as to whether such approval is required or notifying the applicant of their determination;

(iv)(aa)where the local planning authority give the applicant notice that such prior approval is required the applicant shall display a site notice by site display on or near the land on which the proposed development is to be carried out, leaving the notice in position for not less than 21 days in the period of 28 days from the date on which the local planning authority gave the notice to the applicant;

(bb)where the site notice is, without any fault or intention of the applicant, removed, obscured or defaced before the period of 21 days referred to in sub-paragraph (aa) has elapsed, he shall be treated as having complied with the requirements of that sub-paragraph if he has taken reasonable steps for protection of the notice and, if need be, its replacement;

(v)the development shall, except to the extent that the local planning authority otherwise agree in writing, be carried out—

(aa)where prior approval is required, in accordance with the details approved;

(bb)where prior approval is not required, in accordance with the details submitted with the application; and

(vi)the development shall be carried out—

(aa)where approval has been given by the local planning authority, within a period of five years from the date on which approval was given;

(bb)in any other case, within a period of five years from the date on which the local planning authority were given the information referred to in sub-paragraph (d)(ii).

(3) The conditions in paragraph (2) do not apply to the extension or alteration of a building if the building is not on article 1(6) land except in the case of a significant extension or a significant alteration.

(4) Development consisting of the significant extension or the significant alteration of a building may only be carried out once by virtue of Class A(a).

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill