Chwilio Deddfwriaeth

Crossrail Act 2008

Changes to legislation:

Crossrail Act 2008 is up to date with all changes known to be in force on or before 24 September 2024. There are changes that may be brought into force at a future date. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the affected provisions when you open the content using the Table of Contents below.

View outstanding changes

Changes and effects yet to be applied to :

Information:

You searched for provisions that are applicable to Northern Ireland. The matching provisions are highlighted below. Where no highlighting is shown the matching result may be contained within a footnote.

  1. Introductory TextNext Match

  2. WorksPrevious MatchNext Match

    1. 1.Construction and maintenance of scheduled worksPrevious MatchNext Match

    2. 2.Works: further and supplementary provisionsPrevious MatchNext Match

    3. 3.HighwaysPrevious MatchNext Match

    4. 4.Overhead linesPrevious MatchNext Match

  3. LandPrevious MatchNext Match

    1. 5.Temporary possession and usePrevious MatchNext Match

    2. 6.Acquisition of land within limits shown on deposited plansPrevious MatchNext Match

    3. 7.Acquisition of land not subject to the power under section 6(1)Previous MatchNext Match

    4. 8.Extinguishment of private rights of wayPrevious MatchNext Match

    5. 9.Extinguishment of rights of statutory undertakers etc.Previous MatchNext Match

  4. PlanningPrevious MatchNext Match

    1. 10.Planning: generalPrevious MatchNext Match

    2. 11.Permitted development: time limitPrevious MatchNext Match

    3. 12.Fees for planning applicationsPrevious MatchNext Match

    4. 13.Power to disapply section 10(1)Previous MatchNext Match

    5. 14.EIA regulations: replacement developmentPrevious MatchNext Match

    6. 15.Extension of permitted development rightsPrevious MatchNext Match

  5. HeritagePrevious MatchNext Match

    1. 16.Disapplication and modification of controlsPrevious MatchNext Match

    2. 17.Rights of entryPrevious MatchNext Match

  6. TreesPrevious MatchNext Match

    1. 18.Power to deal with trees on neighbouring landPrevious MatchNext Match

    2. 19.Disapplication of controlsPrevious MatchNext Match

  7. NoisePrevious MatchNext Match

    1. 20.Control of construction sites: appealsPrevious MatchNext Match

    2. 21.Proceedings in respect of statutory nuisance: defencePrevious MatchNext Match

  8. Railway mattersPrevious MatchNext Match

    1. 22.Objective of Office of Rail and Road in relation to CrossrailPrevious MatchNext Match

    2. 23.Duty of Office of Rail and Road to publish reportsPrevious MatchNext Match

    3. 24.LicensingPrevious MatchNext Match

    4. 25.Award of Crossrail franchises to public-sector operatorsPrevious MatchNext Match

    5. 26.Disapplication of franchising and access exemptionsPrevious MatchNext Match

    6. 27.ClosuresPrevious MatchNext Match

    7. 28.Key system assetsPrevious MatchNext Match

    8. 29.Power to designate persons as “protected railway companies”Previous MatchNext Match

    9. 30.Duty to co-operatePrevious MatchNext Match

    10. 31.Arbitration after referral under section 30(3)Previous MatchNext Match

    11. 32.Arbitration under section 30(3): multiple proceedingsPrevious MatchNext Match

    12. 33.Transfer of functions relating to worksPrevious MatchNext Match

    13. 34.Application of section 122 of the Railways Act 1993Previous MatchNext Match

    14. 35.Application of other railway legislationPrevious MatchNext Match

  9. TransfersPrevious MatchNext Match

    1. 36.Transfer schemesPrevious MatchNext Match

    2. 37.Transfer schemes: tax provisionsPrevious MatchNext Match

    3. 38.Application of Greater London Authority Act 1999Previous MatchNext Match

  10. Nominated undertakerPrevious MatchNext Match

    1. 39.Holder of functions of nominated undertakerPrevious MatchNext Match

  11. MiscellaneousPrevious MatchNext Match

    1. 40.Disapplication and modification of miscellaneous controlsPrevious MatchNext Match

    2. 41.Burial groundsPrevious MatchNext Match

    3. 42.Application of landlord and tenant lawPrevious MatchNext Match

    4. 43.Disposal of Crown landPrevious MatchNext Match

    5. 44.Prohibitions or restrictions on land use imposed for Crossrail purposesPrevious MatchNext Match

    6. 45.Compensation for injurious affectionPrevious MatchNext Match

    7. 46.Compensation for water abstractionPrevious MatchNext Match

    8. 47.Temporary possession agreementsPrevious MatchNext Match

    9. 48.Application of Act to extensionsPrevious MatchNext Match

    10. 49.Reinstatement of discontinued facilitiesPrevious MatchNext Match

    11. 50.Protection of interestsPrevious MatchNext Match

    12. 51.Power to devolve functions of Secretary of StatePrevious MatchNext Match

    13. 52.Correction of deposited plansPrevious MatchNext Match

    14. 53.Service of documentsPrevious MatchNext Match

    15. 54.ArbitrationPrevious MatchNext Match

  12. FinalPrevious MatchNext Match

    1. 55.“Deposited plans”, “deposited sections”Previous MatchNext Match

    2. 56.InterpretationPrevious MatchNext Match

    3. 57.Financial provisionsPrevious MatchNext Match

    4. 58.Short titlePrevious MatchNext Match

  13. SCHEDULES

    1. SCHEDULE 1Previous MatchNext Match

      Scheduled worksPrevious MatchNext Match

      1. Description of works Previous MatchNext Match

      2. The works which the nominated undertaker is authorised by section...Previous MatchNext Match

      3. In the City of Westminster, London Boroughs of Camden, Islington...Previous MatchNext Match

      4. In the London Boroughs of Tower Hamlets and Newham– Work...Previous MatchNext Match

      5. In the London Borough of Newham– Work No. 1/5– A...Previous MatchNext Match

      6. In the London Boroughs of Newham and Greenwich– Work No....Previous MatchNext Match

      7. In the London Borough of Greenwich— Work No. 1/6C– A...Previous MatchNext Match

      8. In the London Boroughs of Greenwich and Bexley– Work No....Previous MatchNext Match

      9. In the City of Westminster and Royal Borough of Kensington...Previous MatchNext Match

      10. In the City of Westminster– Work No. 1/8E– A railway...Previous MatchNext Match

      11. In the City of Westminster and London Borough of Camden–...Previous MatchNext Match

      12. In the London Borough of Camden– Work No. 1/18A– A...Previous MatchNext Match

      13. In the City of London– Work No. 1/21A– A diversion...Previous MatchNext Match

      14. In the City of London and London Borough of Islington–...Previous MatchNext Match

      15. In the City of London– Work No. 1/23A– A temporary...Previous MatchNext Match

      16. In the London Borough of Tower Hamlets– Work No. 1/25A–...Previous MatchNext Match

      17. In the London Borough of Newham– Work No. 1/29A– A...Previous MatchNext Match

      18. In the London Boroughs of Greenwich and Bexley– Work No....Previous MatchNext Match

      19. In the London Borough of Greenwich– Work No. 1/33C– A...Previous MatchNext Match

      20. In the London Borough of Bexley– Work No. 1/37A– Reconstruction...Previous MatchNext Match

      21. In the London Boroughs of Greenwich and Bexley– Work No....Previous MatchNext Match

      22. In the London Borough of Bexley– Work No 1/38A– A...Previous MatchNext Match

      23. In the London Boroughs of Tower Hamlets and Newham– Work...Previous MatchNext Match

      24. In the London Borough of Newham– Work No. 2/2– A...Previous MatchNext Match

      25. In the London Borough of Tower Hamlets— Work No. 2/8A–...Previous MatchNext Match

      26. In the London Borough of Newham– Work No. 2/9– –A...Previous MatchNext Match

      27. In the London Boroughs of Redbridge and Newham– Work No....Previous MatchNext Match

      28. In the London Borough of Newham– Work No. 2/11– An...Previous MatchNext Match

      29. In the London Boroughs of Redbridge and Barking & Dagenham–...Previous MatchNext Match

      30. In the London Boroughs of Barking & Dagenham and Havering–...Previous MatchNext Match

      31. In the London Borough of Havering– Work No. 2/13B– A...Previous MatchNext Match

      32. In the County of Essex, Borough of Brentwood– Work No....Previous MatchNext Match

      33. In the County of Essex, District of Basildon– Work No....Previous MatchNext Match

      34. In the London Borough of Redbridge— Work No. 2/20A– A...Previous MatchNext Match

      35. In the London Borough of Newham— Work No. 2/21A– railway...Previous MatchNext Match

      36. In the County of Berkshire, Royal Borough of Windsor &...Previous MatchNext Match

      37. In the County of Berkshire, Borough of Slough– Work No....Previous MatchNext Match

      38. In the County of Berkshire, Borough of Slough and County...Previous MatchNext Match

      39. In the County of Berkshire, Borough of Slough— Work No....Previous MatchNext Match

      40. In the County of Buckinghamshire, District of South Bucks, Parish...Previous MatchNext Match

      41. In the London Borough of Hillingdon– Work No. 3/10– A...Previous MatchNext Match

      42. In the London Borough of Ealing– Work No. 3/16– A...Previous MatchNext Match

      43. In the London Borough of Hammersmith & Fulham– Work No....Previous MatchNext Match

      44. In the London Borough of Hammersmith & Fulham and the...Previous MatchNext Match

      45. In the London Borough of Hammersmith & Fulham— Work No....Previous MatchNext Match

      46. In the London Borough of Hammersmith & Fulham and the...Previous MatchNext Match

      47. In the London Borough of Hammersmith & Fulham and the...Previous MatchNext Match

      48. In the Royal Borough of Kensington & Chelsea— Work No....Previous MatchNext Match

    2. SCHEDULE 2Previous MatchNext Match

      Works: further and supplementary provisionsPrevious MatchNext Match

      1. Additional worksPrevious MatchNext Match

        1. 1.(1) The nominated undertaker may, for the purposes of or...Previous MatchNext Match

      2. Highway accessesPrevious MatchNext Match

        1. 2.(1) The nominated undertaker may, for the purposes of or...Previous MatchNext Match

      3. Overhead line diversionsPrevious MatchNext Match

        1. 3.Without prejudice to paragraph 1(1)(f), the nominated undertaker may, for...Previous MatchNext Match

      4. Mitigation and protection worksPrevious MatchNext Match

        1. 4.The nominated undertaker may within the limits of deviation for...Previous MatchNext Match

      5. Support of buildingsPrevious MatchNext Match

        1. 5.(1) This paragraph applies where it is necessary or expedient...Previous MatchNext Match

        2. 6.(1) This paragraph applies where it is necessary or expedient...Previous MatchNext Match

        3. 7.(1) Where the nominated undertaker exercises any power under paragraph...Previous MatchNext Match

      6. Discharge of waterPrevious MatchNext Match

        1. 8.(1) The nominated undertaker may use any watercourse or any...Previous MatchNext Match

      7. Entry for preparatory purposesPrevious MatchNext Match

        1. 9.(1) The nominated undertaker may, for the purposes of this...Previous MatchNext Match

      8. Temporary interference with waterwaysPrevious MatchNext Match

        1. 10.(1) The powers conferred by this paragraph shall be exercisable...Previous MatchNext Match

    3. SCHEDULE 3Previous MatchNext Match

      HighwaysPrevious MatchNext Match

      1. Stopping-upPrevious MatchNext Match

        1. 1.(1) The nominated undertaker may, in connection with the construction...Previous MatchNext Match

        2. 2.(1) The nominated undertaker may, in connection with the construction...Previous MatchNext Match

        3. 3.(1) On a highway or part of a highway being...Previous MatchNext Match

      2. Permanent obstructionPrevious MatchNext Match

        1. 4.(1) The powers conferred by paragraph 1 or 4 of...Previous MatchNext Match

      3. Temporary interferencePrevious MatchNext Match

        1. 5.(1) For the purposes of the works authorised by this...Previous MatchNext Match

      4. Working sites in highwaysPrevious MatchNext Match

        1. 6.Any highway or part of a highway which is stopped...Previous MatchNext Match

      5. Street worksPrevious MatchNext Match

        1. 7.(1) The nominated undertaker may, for the purposes of the...Previous MatchNext Match

        2. 8.(1) Works to which sub-paragraph (2) below applies shall be...Previous MatchNext Match

      6. ConstructionPrevious MatchNext Match

        1. 9.(1) Where under this Act the nominated undertaker— Previous MatchNext Match

        2. 10.(1) Sub-paragraph (2) applies where under this Act the nominated...Previous MatchNext Match

      7. MaintenancePrevious MatchNext Match

        1. 11.(1) Sub-paragraph (2) applies where under this Act the nominated...Previous MatchNext Match

        2. 12.Notwithstanding anything in section 46 of the Railways Clauses Consolidation...Previous MatchNext Match

      8. Bridges carrying highwaysPrevious MatchNext Match

        1. 13.Each of sections 116 and 117 of the Transport Act...Previous MatchNext Match

      9. Agreements with highway authorities etc.Previous MatchNext Match

        1. 14.(1) Where under this Schedule the nominated undertaker is authorised...Previous MatchNext Match

      10. Use of subsoilPrevious MatchNext Match

        1. 15.(1) The nominated undertaker may enter upon, take and use...Previous MatchNext Match

    4. SCHEDULE 4Previous MatchNext Match

      Overhead lines: consentPrevious MatchNext Match

      1. Scope of SchedulePrevious MatchNext Match

        1. 1.This Schedule applies to any electric line to which section...Previous MatchNext Match

      2. Consent requirementPrevious MatchNext Match

        1. 2.(1) An electric line to which this Schedule applies shall...Previous MatchNext Match

      3. Applications for consentPrevious MatchNext Match

        1. 3.(1) An application for consent under this Schedule shall be...Previous MatchNext Match

        2. 4.An application for consent under this Schedule shall be supplemented,...Previous MatchNext Match

      4. PublicityPrevious MatchNext Match

        1. 5.(1) A person applying for consent under this Schedule shall...Previous MatchNext Match

      5. ConsultationPrevious MatchNext Match

        1. 6.(1) Within 14 days of receiving an application for consent...Previous MatchNext Match

        2. 7.(1) If the appropriate Ministers consider that an application for...Previous MatchNext Match

      6. Grant of consentPrevious MatchNext Match

        1. 8.(1) This paragraph applies to an application for consent under...Previous MatchNext Match

        2. 9.A consent under this Schedule may include such conditions (including...Previous MatchNext Match

      7. Variation and revocation of consentPrevious MatchNext Match

        1. 10.(1) A consent under this Schedule may be varied or...Previous MatchNext Match

      8. Duration of consentPrevious MatchNext Match

        1. 11.Subject to paragraph 10, a consent under this Schedule shall...Previous MatchNext Match

      9. InterpretationPrevious MatchNext Match

        1. 12.In this Schedule, references to the appropriate Ministers are to...Previous MatchNext Match

    5. SCHEDULE 5Previous MatchNext Match

      Temporary possession and use of landPrevious MatchNext Match

      1. Occupation and use for construction of worksPrevious MatchNext Match

        1. 1.(1) The nominated undertaker may, in connection with the construction...Previous MatchNext Match

        2. 2.(1) Before giving up possession of land of which possession...Previous MatchNext Match

        3. 3.(1) The nominated undertaker may use any road situated on...Previous MatchNext Match

      2. Occupation and use for maintenance of worksPrevious MatchNext Match

        1. 4.(1) At any time during the maintenance period relating to...Previous MatchNext Match

      3. Suspension of private rights of wayPrevious MatchNext Match

        1. 5.(1) Subject to sub-paragraph (2), all private rights of way...Previous MatchNext Match

      4. EnforcementPrevious MatchNext Match

        1. 6.Section 13 of the Compulsory Purchase Act 1965 (c. 56)...Previous MatchNext Match

    6. SCHEDULE 6Previous MatchNext Match

      Acquisition of land shown within limits on deposited plansPrevious MatchNext Match

      1. Part 1 Purposes for which certain land may be acquiredPrevious MatchNext Match

      2. Part 2 Application of legislation relating to compulsory purchasePrevious MatchNext Match

        1. Lands Clauses Consolidation Act 1845Previous MatchNext Match

          1. 1.The Lands Clauses Consolidation Act 1845 (c. 18) shall not...Previous MatchNext Match

        2. Compulsory Purchase Act 1965Previous MatchNext Match

          1. 2.Part 1 of the Compulsory Purchase Act 1965 (c. 56),...Previous MatchNext Match

          2. 3.(1) In its application by virtue of paragraph 2, the...Previous MatchNext Match

        3. Compulsory Purchase (Vesting Declarations) Act 1981Previous MatchNext Match

          1. 4.The Compulsory Purchase (Vesting Declarations) Act 1981 (c. 66) shall...Previous MatchNext Match

          2. 5.(1) In its application by virtue of paragraph 4, the...Previous MatchNext Match

      3. Part 3 Supplementary provisionsPrevious MatchNext Match

        1. Acquisition of new rightsPrevious MatchNext Match

          1. 6.(1) The power conferred by section 6(1) shall include power...Previous MatchNext Match

          2. 7.(1) The modifications referred to in paragraph 6(2)(a) are as...Previous MatchNext Match

        2. Limitation of power of acquisition to rights onlyPrevious MatchNext Match

          1. 8.In the case of land specified in the following table,...Previous MatchNext Match

          2. 9.In the case of land specified in the following table,...Previous MatchNext Match

        3. Limitation of power of acquisition to land of specified descriptionPrevious MatchNext Match

          1. 10.In the case of land specified in columns (1) and...Previous MatchNext Match

        4. Acquisition of subsoilPrevious MatchNext Match

          1. 11.(1) In the case of land specified in the following...Previous MatchNext Match

        5. Limitation of power of acquisition in relation to land not more than 9 metres below the surfacePrevious MatchNext Match

          1. 12.In the case of land specified in the following table,...Previous MatchNext Match

        6. Extension of power to acquire new rightsPrevious MatchNext Match

          1. 13.(1) The Secretary of State may by order provide that...Previous MatchNext Match

        7. Acquisition of part only of certain propertiesPrevious MatchNext Match

          1. 14.(1) Where— (a) a notice to treat under Part 1...Previous MatchNext Match

          2. 15.(1) If, on a reference under paragraph 14(5), the Upper...Previous MatchNext Match

          3. 16.(1) Where under paragraph 15 a notice to treat is...Previous MatchNext Match

        8. MineralsPrevious MatchNext Match

          1. 17.(1) Parts 2 and 3 of Schedule 2 to the...Previous MatchNext Match

        9. Power to require acquisition where time limit extendedPrevious MatchNext Match

          1. 18.(1) If the Secretary of State makes an order under...Previous MatchNext Match

          2. 19.Paragraph 18 shall not apply to any subsoil or under-surface...Previous MatchNext Match

        10. CompensationPrevious MatchNext Match

          1. 20.Section 4 of the Acquisition of Land Act 1981 (c....Previous MatchNext Match

    7. SCHEDULE 7Previous MatchNext Match

      Planning conditionsPrevious MatchNext Match

      1. Part 1 Qualifying authoritiesPrevious MatchNext Match

        1. SpecificationPrevious MatchNext Match

          1. 1.(1) As soon after the day on which this Act...Previous MatchNext Match

        2. TransitionPrevious MatchNext Match

          1. 2.(1) An order under paragraph 1 may contain such transitional...Previous MatchNext Match

      2. Part 2 Development in the area of a unitary authorityPrevious MatchNext Match

        1. IntroductoryPrevious MatchNext Match

          1. 3.This Part has effect in relation to development in the...Previous MatchNext Match

        2. Planning regimesPrevious MatchNext Match

          1. 4.(1) The requirement set out in paragraph 5 shall be...Previous MatchNext Match

        3. Conditions: non-qualifying authorityPrevious MatchNext Match

          1. 5.(1) Development shall be carried out in accordance with plans...Previous MatchNext Match

        4. Conditions: qualifying authorityPrevious MatchNext Match

          1. 6.(1) To the extent that development consists of any operation...Previous MatchNext Match

          2. 7.(1) Development shall be carried out in accordance with arrangements...Previous MatchNext Match

          3. 8.(1) To the extent that development consists of— Previous MatchNext Match

          4. 9.(1) No work to which this paragraph applies shall be...Previous MatchNext Match

          5. 10.Where the local planning authority approves a scheme for the...Previous MatchNext Match

        5. Conditions: generalPrevious MatchNext Match

          1. 11.(1) Where development consists of or includes the carrying out...Previous MatchNext Match

      3. Part 3 Development not in the area of a unitary authorityPrevious MatchNext Match

        1. IntroductoryPrevious MatchNext Match

          1. 12.This Part has effect in relation to development not in...Previous MatchNext Match

        2. Planning regimes: district councilsPrevious MatchNext Match

          1. 13.(1) The requirement set out in paragraph 14 shall be...Previous MatchNext Match

        3. District conditions: non-qualifying authorityPrevious MatchNext Match

          1. 14.(1) Development shall be carried out in accordance with plans...Previous MatchNext Match

        4. District conditions: qualifying authorityPrevious MatchNext Match

          1. 15.(1) To the extent that development consists of any operation...Previous MatchNext Match

          2. 16.(1) Development shall be carried out in accordance with arrangements...Previous MatchNext Match

          3. 17.(1) No work to which this paragraph applies shall be...Previous MatchNext Match

          4. 18.Where the district planning authority approves a scheme for the...Previous MatchNext Match

        5. District conditions: generalPrevious MatchNext Match

          1. 19.(1) Where development consists of or includes the carrying out...Previous MatchNext Match

        6. County conditions: qualifying authorityPrevious MatchNext Match

          1. 20.(1) The requirements set out in paragraphs 21 to 23...Previous MatchNext Match

          2. 21.(1) To the extent that development consists of any operation...Previous MatchNext Match

          3. 22.(1) Development shall be carried out in accordance with arrangements...Previous MatchNext Match

          4. 23.(1) To the extent that development consists of— Previous MatchNext Match

          5. 24.(1) Development shall be carried out in accordance with arrangements...Previous MatchNext Match

      4. Part 4 SupplementaryPrevious MatchNext Match

        1. Programming of requests for planning approvalsPrevious MatchNext Match

          1. 25.A planning authority shall not be required to entertain a...Previous MatchNext Match

        2. ConsultationPrevious MatchNext Match

          1. 26.(1) Where a planning authority considers that a request for...Previous MatchNext Match

          2. 27.(1) Where a planning authority considers that a request for...Previous MatchNext Match

        3. Intervention by the Secretary of StatePrevious MatchNext Match

          1. 28.(1) The appropriate Ministers may by directions require a planning...Previous MatchNext Match

          2. 29.(1) The appropriate Ministers may by directions restrict a planning...Previous MatchNext Match

        4. AppealsPrevious MatchNext Match

          1. 30.(1) Where the nominated undertaker is aggrieved by a decision...Previous MatchNext Match

          2. 31.No appeal under section 78 of the Town and Country...Previous MatchNext Match

          3. 32.(1) Unless the appropriate Ministers direct otherwise, their functions in...Previous MatchNext Match

          4. 33.The decision of the person appointed under paragraph 32, or,...Previous MatchNext Match

          5. 34.(1) An appeal under paragraph 30 shall be dealt with...Previous MatchNext Match

          6. 35.(1) Regulations under paragraph 30 or 34 may make different...Previous MatchNext Match

        5. Modification of SchedulePrevious MatchNext Match

          1. 36.(1) The Secretary of State may by order amend this...Previous MatchNext Match

        6. InterpretationPrevious MatchNext Match

          1. 37.(1) In this Schedule— “building” includes any structure other than—...Previous MatchNext Match

    8. SCHEDULE 8Previous MatchNext Match

      Extension of permitted development rights: supplementary provisionsPrevious MatchNext Match

      1. Conditions of permitted developmentPrevious MatchNext Match

        1. 1.(1) Planning permission granted by virtue of section 15(1) is...Previous MatchNext Match

      2. Controls in relation to proposed developmentPrevious MatchNext Match

        1. 2.(1) Where— (a) it appears to the Secretary of State...Previous MatchNext Match

        2. 3.(1) This paragraph applies where it appears to the Secretary...Previous MatchNext Match

      3. NoticesPrevious MatchNext Match

        1. 4.A notice under this Schedule shall— (a) specify the person...Previous MatchNext Match

        2. 5.Notices under this Schedule shall be served by post. Previous MatchNext Match

        3. 6.Where the Secretary of State gives a notice under this...Previous MatchNext Match

      4. InterpretationPrevious MatchNext Match

        1. 7.For the purposes of this Schedule, development has been the...Previous MatchNext Match

        2. 8.In this Schedule— (a) “relevant undertaking” means an undertaking given...Previous MatchNext Match

    9. SCHEDULE 9Previous MatchNext Match

      Heritage: disapplication and modification of controlsPrevious MatchNext Match

      1. Listed buildings and conservation areasPrevious MatchNext Match

        1. 1.(1) Subject to sub-paragraph (2), if a listed building was...Previous MatchNext Match

        2. 2.(1) In the case of a listed building to which...Previous MatchNext Match

        3. 3.Section 59 of the Planning (Listed Buildings and Conservation Areas)...Previous MatchNext Match

      2. Ancient monuments etc.Previous MatchNext Match

        1. 4.(1) This paragraph has effect in relation to the Ancient...Previous MatchNext Match

        2. 5.(1) The power of entry conferred by section 36(1) of...Previous MatchNext Match

    10. SCHEDULE 10Previous MatchNext Match

      Heritage: rights of entryPrevious MatchNext Match

      1. 1.(1) Any person duly authorised in writing by the Historic...Previous MatchNext Match

      2. 2.(1) The nominated undertaker shall not carry out any decontrolled...Previous MatchNext Match

      3. 3.(1) Following the giving of a notice under paragraph 2(1)...Previous MatchNext Match

    11. SCHEDULE 11Previous MatchNext Match

      Application of other railway legislationPrevious MatchNext Match

      1. Highway (Railway Crossings) Act 1839 (c. 45)Previous MatchNext Match

        1. 1.The Highway (Railway Crossings) Act 1839 shall not apply to...Previous MatchNext Match

      2. Railway Regulation Act 1842 (c. 55)Previous MatchNext Match

        1. 2.Section 9 of the Railway Regulation Act 1842 shall not...Previous MatchNext Match

      3. Railways Clauses Consolidation Act 1845 (c. 20)Previous MatchNext Match

        1. 3.(1) The Railways Clauses Consolidation Act 1845, insofar as applicable...Previous MatchNext Match

      4. Railways Clauses Act 1863 (c. 92)Previous MatchNext Match

        1. 4.(1) Part 1 of the Railways Clauses Act 1863, insofar...Previous MatchNext Match

      5. Railway Companies (Accounts and Returns) Act 1911 (c. 34)Previous MatchNext Match

        1. 5.For the purposes of the Railway Companies (Accounts and Returns)...Previous MatchNext Match

      6. British Transport Commission Act 1949 (c. xxix)Previous MatchNext Match

        1. 6.(1) Section 55 the British Transport Commission Act 1949 (penalty...Previous MatchNext Match

      7. MiscellaneousPrevious MatchNext Match

        1. 7.(1) In their application to— (a) a Crossrail undertaker, Previous MatchNext Match

    12. SCHEDULE 12Previous MatchNext Match

      Transfer schemesPrevious MatchNext Match

      1. Part 1 Transfers from Cross London Rail Links Limited and its subsidiariesPrevious MatchNext Match

        1. 1.(1) The Secretary of State may make schemes for the...Previous MatchNext Match

      2. Part 2 Transfers from the Greater London Authority, Transport for London ... and their subsidiariesPrevious MatchNext Match

        1. 2.(1) The Secretary of State may, for purposes connected with...Previous MatchNext Match

      3. Part 3 Transfers from Secretary of State and companies owned by Secretary of StatePrevious MatchNext Match

        1. 3.(1) The Secretary of State may, for purposes connected with...Previous MatchNext Match

      4. Part 4 General provisions about transfer schemesPrevious MatchNext Match

        1. Scheme for grant of leasePrevious MatchNext Match

          1. 4.Any power under paragraph 1, 2 or 3 to make...Previous MatchNext Match

        2. Property, rights and liabilities that may be transferredPrevious MatchNext Match

          1. 5.The property, rights and liabilities for whose transfer a scheme...Previous MatchNext Match

        3. Creation by a scheme of interests, rights and liabilitiesPrevious MatchNext Match

          1. 6.(1) A scheme may contain— (a) provision for the creation,...Previous MatchNext Match

        4. Identifying what is transferred or created by a schemePrevious MatchNext Match

          1. 7.(1) A scheme may define property, rights or liabilities for...Previous MatchNext Match

        5. Scheme may provide for contraventions etc. to be treated as not occurringPrevious MatchNext Match

          1. 8.(1) A scheme may contain provision for a transfer to...Previous MatchNext Match

        6. Transfer of shares in subsidiary of transferorPrevious MatchNext Match

          1. 9.(1) This paragraph applies where a scheme provides for the...Previous MatchNext Match

        7. Scheme may modify interests, rights and liabilities of third partiesPrevious MatchNext Match

          1. 10.(1) A scheme may contain provision for interests, rights or...Previous MatchNext Match

          2. 11.(1) Sub-paragraph (2) applies where (apart from that sub-paragraph) a...Previous MatchNext Match

        8. Scheme may impose obligations to enter into agreements or execute instrumentsPrevious MatchNext Match

          1. 12.(1) A scheme may contain provision for imposing, on the...Previous MatchNext Match

        9. Supplementary provisions of schemesPrevious MatchNext Match

          1. 13.(1) A scheme may make such incidental, supplementary, consequential and...Previous MatchNext Match

        10. Effect of schemePrevious MatchNext Match

          1. 14.(1) At the time appointed for the purpose by a...Previous MatchNext Match

        11. Modification of scheme by agreementPrevious MatchNext Match

          1. 15.(1) Where the transferor, and the transferee or transferees, under...Previous MatchNext Match

        12. Transfer of employees and continuity of employmentPrevious MatchNext Match

          1. 16.(1) Where, by virtue of a scheme, a person employed...Previous MatchNext Match

        13. Provision of information to person making schemePrevious MatchNext Match

          1. 17.Where the Secretary of State proposes to make a scheme...Previous MatchNext Match

          2. 18.(1) This paragraph applies to a direction under paragraph 17....Previous MatchNext Match

        14. Agreements relating to schemesPrevious MatchNext Match

          1. 19.The Secretary of State may by agreement fetter the exercise...Previous MatchNext Match

      5. Part 5 InterpretationPrevious MatchNext Match

        1. InterpretationPrevious MatchNext Match

          1. 20.(1) In sub-paragraph (2), and in Part 4 of this...Previous MatchNext Match

    13. SCHEDULE 13Previous MatchNext Match

      Transfer schemes: tax provisionsPrevious MatchNext Match

      1. Part 1 IntroductionPrevious MatchNext Match

        1. Meaning of “public body”Previous MatchNext Match

          1. 1.In this Schedule “public body” means a person which is...Previous MatchNext Match

        2. Meaning of “taxable public body” and “exempt public body”Previous MatchNext Match

          1. 2.(1) In this Schedule “taxable public body” means a public...Previous MatchNext Match

        3. Interpretation: supplementaryPrevious MatchNext Match

          1. 3.(1) In this Schedule— “CAA 2001” means the Capital Allowances...Previous MatchNext Match

      2. Part 2 Transfers etc between taxable public bodiesPrevious MatchNext Match

        1. Meaning of “relevant transfer” in Part 2 of SchedulePrevious MatchNext Match

          1. 4.In this Part of this Schedule “relevant transfer” means a...Previous MatchNext Match

        2. Computation of profits and losses in respect of transfer of tradePrevious MatchNext Match

          1. 5.(1) This paragraph applies where a taxable public body (“the...Previous MatchNext Match

        3. Transfers of trading stockPrevious MatchNext Match

          1. 6.(1) This paragraph applies if— (a) under a relevant transfer...Previous MatchNext Match

        4. Capital allowances: transfer of whole tradePrevious MatchNext Match

          1. 7.(1) This paragraph applies where a taxable public body (“the...Previous MatchNext Match

        5. Capital allowances: transfer of part of a tradePrevious MatchNext Match

          1. 8.(1) Where a taxable public body (“the predecessor”) is carrying...Previous MatchNext Match

        6. Capital allowances: transfer of plant or machineryPrevious MatchNext Match

          1. 9.(1) This paragraph applies where— (a) there is a relevant...Previous MatchNext Match

        7. Capital allowances: transfers not to be salesPrevious MatchNext Match

          1. 10.(1) This paragraph applies for the purposes of Part 3...Previous MatchNext Match

        8. Chargeable gains: assets to be treated as disposed of without a gain or a lossPrevious MatchNext Match

          1. 11.(1) For the purposes of TCGA 1992 a disposal— Previous MatchNext Match

        9. Chargeable gains: roll-over reliefPrevious MatchNext Match

          1. 12.(1) This paragraph applies if— (a) but for section 154...Previous MatchNext Match

        10. Continuity in relation to transfer of intangible assetsPrevious MatchNext Match

          1. 13.(1) For the purposes of Part 8 of CTA 2009—...Previous MatchNext Match

        11. Continuity in relation to loan relationshipsPrevious MatchNext Match

          1. 14.(1) For the purposes of the application of Part 5...Previous MatchNext Match

        12. Continuity in relation to derivative contractsPrevious MatchNext Match

          1. 15.(1) For the purposes of the application of Part 7...Previous MatchNext Match

        13. Leased assetsPrevious MatchNext Match

          1. 16.(1) This paragraph applies for the purposes of section 781...Previous MatchNext Match

      3. Part 3 Transfers etc from taxable public bodies to exempt public bodiesPrevious MatchNext Match

        1. Meaning of “relevant transfer” in Part 3 of SchedulePrevious MatchNext Match

          1. 17.In this Part of this Schedule “relevant transfer” means a...Previous MatchNext Match

        2. Transfers of trading stockPrevious MatchNext Match

          1. 18.(1) This paragraph applies if under a relevant transfer trading...Previous MatchNext Match

        3. Capital allowances: determination of disposal value of plant or machineryPrevious MatchNext Match

          1. 19.(1) This paragraph applies to a relevant transfer of plant...Previous MatchNext Match

        4. Capital allowances: determination of disposal value of fixturesPrevious MatchNext Match

          1. 20.(1) This paragraph applies to a relevant transfer if— Previous MatchNext Match

        5. Capital allowances: determination of capital value of industrial buildings etc.Previous MatchNext Match

          1. 21.(1) This paragraph applies for the purposes of Part 3...Previous MatchNext Match

        6. Chargeable gains: assets to be treated as disposed of without a gain or a lossPrevious MatchNext Match

          1. 22.(1) For the purposes of TCGA 1992 a disposal— Previous MatchNext Match

        7. Neutral effect of transfer of intangible assetsPrevious MatchNext Match

          1. 23.(1) For the purposes of Part 8 of CTA 2009,...Previous MatchNext Match

        8. Neutral effect of transfer for loan relationships and derivative contractsPrevious MatchNext Match

          1. 24.No credit or debit shall be required or allowed, in...Previous MatchNext Match

        9. Leased assetsPrevious MatchNext Match

          1. 25.(1) This paragraph applies for the purposes of section 781...Previous MatchNext Match

      4. Part 4 Transfers from exempt public bodies to taxable public bodiesPrevious MatchNext Match

        1. Meaning of “relevant transfer” in Part 4 of SchedulePrevious MatchNext Match

          1. 26.In this Part of this Schedule “relevant transfer” means a...Previous MatchNext Match

        2. Capital allowances: transfer of plant or machineryPrevious MatchNext Match

          1. 27.(1) This paragraph applies where— (a) there is a relevant...Previous MatchNext Match

        3. Capital allowances: determination of capital value of industrial buildings etc.Previous MatchNext Match

          1. 28.(1) This paragraph applies where there is a relevant transfer...Previous MatchNext Match

      5. Part 5 Other provisions concerning transfers between public bodiesPrevious MatchNext Match

        1. Meaning of “relevant transfer” in Part 5 of SchedulePrevious MatchNext Match

          1. 29.In this Part of this Schedule “relevant transfer” means a...Previous MatchNext Match

        2. Trading losses: change in ownershipPrevious MatchNext Match

          1. 30.(1) This paragraph applies to a relevant transfer of all...Previous MatchNext Match

        3. Chargeable gains: degrouping chargesPrevious MatchNext Match

          1. 31.(1) This paragraph applies if a company (“the degrouped company”)—...Previous MatchNext Match

        4. Stamp dutyPrevious MatchNext Match

          1. 32.(1) Stamp duty is not to be chargeable— Previous MatchNext Match

      6. Part 6 Transfers etc involving private personsPrevious MatchNext Match

        1. Meaning of “relevant transfer” in Part 6 of SchedulePrevious MatchNext Match

          1. 33.In this Part of this Schedule “relevant transfer” means a...Previous MatchNext Match

        2. Transfers of trading stockPrevious MatchNext Match

          1. 34.(1) This paragraph applies if under a relevant transfer trading...Previous MatchNext Match

        3. Capital allowances: determination of disposal value of plant or machineryPrevious MatchNext Match

          1. 35.(1) This paragraph applies to a relevant transfer of plant...Previous MatchNext Match

        4. Capital allowances: determination of disposal value of fixturesPrevious MatchNext Match

          1. 36.(1) This paragraph applies to a relevant transfer if— Previous MatchNext Match

        5. Capital allowances: section 265 of CAA 2001 not to apply in relation to transfereePrevious MatchNext Match

          1. 37.(1) This paragraph applies in relation to a relevant transfer....Previous MatchNext Match

        6. Capital allowances: determination of capital value of industrial buildings etc.Previous MatchNext Match

          1. 38.(1) This paragraph applies for the purposes of Part 3...Previous MatchNext Match

        7. Chargeable gains: disposals not to be treated as made at market valuePrevious MatchNext Match

          1. 39.(1) Section 17 of TCGA 1992 (disposals and acquisitions treated...Previous MatchNext Match

        8. Loan relationshipsPrevious MatchNext Match

          1. 40.(1) Section 444 of CTA 2009 (transactions not at arm's...Previous MatchNext Match

      7. Part 7 Other provisions concerning transfersPrevious MatchNext Match

        1. Chargeable gains: value shiftingPrevious MatchNext Match

          1. 41.No transfer scheme is to be regarded as a scheme...Previous MatchNext Match

        2. Group reliefPrevious MatchNext Match

          1. 42.The power of the Secretary of State to make a...Previous MatchNext Match

        3. Modification of transfer schemes and determinations under paragraph 9(1)(d) or 27(1)(c): companiesPrevious MatchNext Match

          1. 43.(1) This paragraph applies if— (a) a company delivers a...Previous MatchNext Match

        4. Modification of transfer schemes: other persons and partnershipsPrevious MatchNext Match

          1. 44.(1) This paragraph applies if— (a) a person delivers a...Previous MatchNext Match

        5. Power to make further provision in relation to transfer schemesPrevious MatchNext Match

          1. 45.(1) The Treasury may by regulations make provision for varying...Previous MatchNext Match

        6. Consequential amendmentPrevious MatchNext Match

          1. 46.In section 35(3)(d) of TCGA 1992 (no gain no loss...Previous MatchNext Match

    14. SCHEDULE 14Previous MatchNext Match

      Disapplication and modification of miscellaneous controlsPrevious MatchNext Match

      1. Ecclesiastical lawPrevious MatchNext Match

        1. 1.(1) No obligation or restriction imposed under ecclesiastical law or...Previous MatchNext Match

      2. Overground wiresPrevious MatchNext Match

        1. 2.Nothing in the London Overground Wires &c. Act 1933 (c....Previous MatchNext Match

      3. London Squares Preservation Act 1931Previous MatchNext Match

        1. 3.(1) Nothing in section 3 of the London Squares Preservation...Previous MatchNext Match

      4. London Building Acts (Amendment) Act 1939Previous MatchNext Match

        1. 4.(1) The following provisions of the London Building Acts (Amendment)...Previous MatchNext Match

      5. Coast worksPrevious MatchNext Match

        1. 5.Section 34(1) of the Coast Protection Act 1949 (c. 74)...Previous MatchNext Match

      6. Port of London Act 1968Previous MatchNext Match

        1. 6.The following provisions of the Port of London Act 1968...Previous MatchNext Match

      7. Highways, etc.Previous MatchNext Match

        1. 7.(1) The following enactments (which control obstructions of the highway...Previous MatchNext Match

      8. Building regulationsPrevious MatchNext Match

        1. 8.(1) Nothing in Part 1 of the Building Act 1984...Previous MatchNext Match

      9. Deposits in the seaPrevious MatchNext Match

        1. 9.(1) Section 5 of the Food and Environment Protection Act...Previous MatchNext Match

      10. London lorries: generalPrevious MatchNext Match

        1. 10.(1) This paragraph applies where an application for the issue...Previous MatchNext Match

      11. London lorries: emergency permitPrevious MatchNext Match

        1. 11.(1) This paragraph applies where a person proposes to undertake...Previous MatchNext Match

        2. 12.(1) An authority responsible for dealing with applications for permits...Previous MatchNext Match

      12. Works under streets in Greater LondonPrevious MatchNext Match

        1. 13.The following provisions of the Greater London Council (General Powers)...Previous MatchNext Match

      13. New Roads and Street Works Act 1991Previous MatchNext Match

        1. 14.(1) The powers conferred by section 56(1) and (1A) of...Previous MatchNext Match

      14. Water abstractionPrevious MatchNext Match

        1. 15.(1) The restriction imposed by section 24(1) of the Water...Previous MatchNext Match

      15. Communication with public sewers in LondonPrevious MatchNext Match

        1. 16.Section 106(8) of the Water Industry Act 1991 (c. 56)...Previous MatchNext Match

      16. Party Wall etc. Act 1996Previous MatchNext Match

        1. 17.(1) No notice under section 1(2) or (5) of the...Previous MatchNext Match

    15. SCHEDULE 15Previous MatchNext Match

      Burial grounds: removal of human remains and monumentsPrevious MatchNext Match

      1. Notice of removalPrevious MatchNext Match

        1. 1.(1) Before removing from the land in question any remains...Previous MatchNext Match

      2. Removal of remainsPrevious MatchNext Match

        1. 2.(1) In the case of remains in relation to which...Previous MatchNext Match

        2. 3.(1) In the case of remains in relation to which...Previous MatchNext Match

      3. Removal of monumentsPrevious MatchNext Match

        1. 4.(1) Where a licence to remove any remains is issued...Previous MatchNext Match

        2. 5.(1) Where the nominated undertaker removes any remains under paragraph...Previous MatchNext Match

      4. RecordsPrevious MatchNext Match

        1. 6.(1) Where any remains are removed under this Schedule, the...Previous MatchNext Match

      5. SupplementaryPrevious MatchNext Match

        1. 7.(1) Where the nominated undertaker removes remains in relation to...Previous MatchNext Match

    16. SCHEDULE 16Previous MatchNext Match

      Reinstatement of discontinued facilitiesPrevious MatchNext Match

      1. Power to reinstatePrevious MatchNext Match

        1. 1.(1) The nominated undertaker may within the limits of deviation...Previous MatchNext Match

      2. Planning conditionsPrevious MatchNext Match

        1. 2.(1) This paragraph has effect in relation to development authorised...Previous MatchNext Match

    17. SCHEDULE 17Previous MatchNext Match

      Protective provisionsPrevious MatchNext Match

      1. Part 1 Protection for highways and trafficPrevious MatchNext Match

        1. 1.(1) The following provisions of this Part shall, unless otherwise...Previous MatchNext Match

        2. 2.Wherever in this Part provision is made with respect to...Previous MatchNext Match

        3. 3.In exercising the powers conferred by this Act in relation...Previous MatchNext Match

        4. 4.The nominated undertaker shall not, without the consent of the...Previous MatchNext Match

        5. 5.In the construction of any part of the said works...Previous MatchNext Match

        6. 6.(1) The provisions of this paragraph have effect in relation...Previous MatchNext Match

        7. 7.The nominated undertaker shall secure that so much of the...Previous MatchNext Match

        8. 8.Any officer of the highway authority duly appointed for the...Previous MatchNext Match

        9. 9.(1) The nominated undertaker shall not alter, disturb or in...Previous MatchNext Match

        10. 10.The nominated undertaker shall not remove any soil or material...Previous MatchNext Match

        11. 11.(1) If the highway authority, after giving to the nominated...Previous MatchNext Match

        12. 12.(1) The nominated undertaker shall not, except with the consent...Previous MatchNext Match

        13. 13.The nominated undertaker shall not, except with the consent of...Previous MatchNext Match

        14. 14.The nominated undertaker shall, if reasonably so required by the...Previous MatchNext Match

        15. 15.(1) Where any part of any highway has been broken...Previous MatchNext Match

        16. 16.If any damage to any highway or any property of...Previous MatchNext Match

        17. 17.The fact that any act or thing may have been...Previous MatchNext Match

        18. 18.(1) Any dispute arising between the nominated undertaker and the...Previous MatchNext Match

      2. Part 2 Protection for electricity, gas, water and sewerage undertakersPrevious MatchNext Match

        1. 1.(1) The following provisions of this Part shall, unless otherwise...Previous MatchNext Match

        2. 2.(1) The following provisions of this paragraph have effect in...Previous MatchNext Match

        3. 3.(1) This paragraph applies where— (a) the nominated undertaker for...Previous MatchNext Match

        4. 4.(1) Any alternative apparatus to be constructed by the undertakers...Previous MatchNext Match

        5. 5.(1) The undertakers shall, after— (a) the manner of construction...Previous MatchNext Match

        6. 6.(1) If the nominated undertaker gives notice in writing to...Previous MatchNext Match

        7. 7.(1) Where, in accordance with the provisions of this Part,...Previous MatchNext Match

        8. 8.(1) Not less than 28 days before commencing to construct...Previous MatchNext Match

        9. 9.(1) If in consequence of the exercise of the powers...Previous MatchNext Match

        10. 10.Where, in consequence of this Act, any part of any...Previous MatchNext Match

        11. 11.(1) Subject to the following provisions of this paragraph, the...Previous MatchNext Match

        12. 12.(1) Subject to sub-paragraphs (2) and (3), if by reason...Previous MatchNext Match

        13. 13.(1) Any dispute arising between the nominated undertaker and the...Previous MatchNext Match

      3. Part 3 Protection of land drainage, flood defence, water resources and fisheriesPrevious MatchNext Match

        1. 1.(1) The following provisions of this Part shall, unless otherwise...Previous MatchNext Match

        2. 2.(1) Before beginning to construct any specified work, the nominated...Previous MatchNext Match

        3. 3.The requirements which the Agency may make under paragraph 2...Previous MatchNext Match

        4. 4.(1) Any specified work, and all protective works required by...Previous MatchNext Match

        5. 5.(1) Any work constructed under this Act for the purpose...Previous MatchNext Match

        6. 6.(1) If by reason of the construction of any specified...Previous MatchNext Match

        7. 7.(1) The nominated undertaker shall take all such measures as...Previous MatchNext Match

        8. 8.(1) The nominated undertaker shall indemnify the Agency from all...Previous MatchNext Match

        9. 9.Nothing in paragraph 8 shall require the nominated undertaker to...Previous MatchNext Match

        10. 10.The fact that any work or thing has been executed...Previous MatchNext Match

        11. 11.For the purposes of section 5 of the Metropolis Management...Previous MatchNext Match

        12. 12.(1) Any dispute arising between the nominated undertaker and the...Previous MatchNext Match

      4. Part 4 Protection of electronic communications code networksPrevious MatchNext Match

        1. 1.(1) The following provisions of this Part shall, unless otherwise...Previous MatchNext Match

        2. 2.(1) Subject to sub-paragraph (2), Part 10 of the electronic...Previous MatchNext Match

        3. 3.The temporary stopping up or diversion of any highway under...Previous MatchNext Match

        4. 4.(1) Where a highway is stopped up under paragraph 1...Previous MatchNext Match

        5. 5.(1) Subject to sub-paragraphs (2) to (4), if by reason...Previous MatchNext Match

        6. 6.(1) Any dispute arising between the nominated undertaker and an...Previous MatchNext Match

      5. Part 5 Protection of Canal & River TrustPrevious MatchNext Match

        1. 1.(1) The following provisions of this Part shall, unless otherwise...Previous MatchNext Match

        2. 2.The Secretary of State shall not under the powers of...Previous MatchNext Match

        3. 3.(1) Before beginning to construct any specified work, the nominated...Previous MatchNext Match

        4. 4.(1) Any specified work, and any protective works required by...Previous MatchNext Match

        5. 5.(1) The nominated undertaker shall not deposit any polluting material...Previous MatchNext Match

        6. 6.In its application to the discharge of water into the...Previous MatchNext Match

        7. 7.(1) If as a result of the construction of any...Previous MatchNext Match

        8. 8.(1) If any canal work is abandoned, Canal & River...Previous MatchNext Match

        9. 9.(1) The nominated undertaker shall indemnify Canal & River Trust...Previous MatchNext Match

        10. 10.Nothing in paragraph 9 shall impose any liability on the...Previous MatchNext Match

        11. 11.(1) Any dispute arising between the nominated undertaker and Canal...Previous MatchNext Match

      6. Part 6 Protection of Port of London AuthorityPrevious MatchNext Match

        1. 1.(1) The following provisions of this Part shall, unless otherwise...Previous MatchNext Match

        2. 2.(1) Before beginning any operations for the construction of any...Previous MatchNext Match

        3. 3.The nominated undertaker shall carry out all operations for the...Previous MatchNext Match

        4. 4.(1) The nominated undertaker shall not, without the consent of...Previous MatchNext Match

        5. 5.(1) If any pile, stump or other object becomes exposed...Previous MatchNext Match

        6. 6.If— (a) by reason of the construction of any specified...Previous MatchNext Match

        7. 7.The nominated undertaker shall, at or near every specified work,...Previous MatchNext Match

        8. 8.(1) If any tidal work is abandoned, the Port Authority...Previous MatchNext Match

        9. 9.Paragraph 8(4) of Schedule 2 shall apply to any discharge...Previous MatchNext Match

        10. 10.The exercise of the powers of this Act to navigate...Previous MatchNext Match

        11. 11.(1) The nominated undertaker shall indemnify the Port Authority from...Previous MatchNext Match

        12. 12.Nothing in paragraph 11 shall impose any liability on the...Previous MatchNext Match

        13. 13.(1) Any dispute arising between the nominated undertaker and the...Previous MatchNext Match

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan

Y Ddeddf Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Nodiadau Esboniadol

Testun a grëwyd gan yr adran o’r llywodraeth oedd yn gyfrifol am destun y Ddeddf i esbonio beth mae’r Ddeddf yn ceisio ei wneud ac i wneud y Ddeddf yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol. Cyflwynwyd Nodiadau Esboniadol ym 1999 ac maent yn cyd-fynd â phob Deddf Gyhoeddus ac eithrio Deddfau Adfeddiannu, Cronfa Gyfunol, Cyllid a Chyfnerthiad.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill