The location and general design of the footbridge are shown on the plan numbered SCC-NWF-ATK-SBR-XX-DR-S-000001, Revision P01, titled “New Wear Footbridge Haunched Steel Box Girder General Arrangement”.
From a point on the South Bank of the River Wear 10 metres north-east of “The Beam” building.
To a point on the North Bank of the River Wear 10 metres south of the southern gable wall of the North East Railway Stable Building.
The overall span of the Footbridge between the centre line of the bearings on the north and south abutments will be 250 metres, using a 3 span arrangement of 72 metres (North Bank), 125 metres (across the River Wear) and 53 metres (South Bank).
Not less than 25 metres above the mean high water spring tide level (MHWS) of 2.5 metres above ordnance datum.
A minimum clear navigable waterway of 30 metres.
The footbridge will be 10 metres wide overall and will carry shared surface pedestrian footway and cycleway with a useable deck space of approximately 8.4 metres.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: