Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Article 15
Commencement Information
I1Sch. 5 in force at 9.2.2021, see art. 1
(1) Public right of way to be stopped up | (2) Extent of stopping up | (3) New public right of way to be substituted |
---|---|---|
Temporary stopping up of Public Right of Way BI/16/1 leading to North Dene Footbridge (including crossing facilities over the A1 Northbound and Southbound carriageway). | Southern end of public right of way where it connects with existing footbridge at point 6/4 to point 6/5 on Sheet 6 of the Streets, Rights of Way and Access Plans. | To be substituted temporarily whilst the Footbridge is being demolished by a diversion route from point 6/4 to point 6/1 on Sheet 6 of the Streets, Rights of Way and Access Plans. The replacement Footbridge will be provided in the same location as the existing structure shown between point 6/4 and point 6/5 on Sheet 6 of the Streets, Rights of Way and Access Plans. A new footpath will be provided from point 6/5 to point 6/3 on Sheet 6 of the Streets, Rights of Way and Access Plans. |
Temporary stopping up of Public Right of Way LA/72a/16 (referred to as Longbank Bridleway). | To be temporarily stopped up between point 5/4 on Sheet 5 and point 6/1 on Sheet 6 of the Streets, Rights of Way and Access Plans. | To be substituted temporarily by a diversion route that runs between point 6/1 on Sheet 6 and point 5/2 and point 5/5 on Sheet 5 of the Streets, Rights of Way and Access Plans. |
Temporary stopping up of Public Right of Way GA/7/1 to provide construction works access with a controlled crossing point. | To be temporarily stopped up between point 3/10 and point 3/11 on Sheet 3 of the Streets, Rights of Way and Access Plans. | To include a controlled crossing point between point 3/10 and point 3/11 on Sheet 3 of the Streets, Rights of Way and Access Plans. |
Temporary stopping up of Public Right of Way GA/6/1 to provide construction works access. | To be temporarily stopped up between point 3/12 and point 3/14 on Sheet 3 of the Streets, Rights of Way and Access Plans. | To include a controlled crossing point between point 3/12 and point 3/14 on Sheet 3 of the Streets, Rights of Way and Access Plans. |
Temporary stopping up of footpath that runs parallel to A167 Durham Road from Angel of the North to junction 66 (Eighton Lodge). | To be temporarily stopped up from point 4/1 on Sheet 4 to point 5/1 on Sheet 5 of the Streets, Rights of Way and Access Plans. | To be substituted temporarily by a diversion route that runs to the north of the existing footpath from point 4/1 on Sheet 4 to point 5/1 on Sheet 5 of the Streets, Rights of Way and Access Plans. |
Temporary stopping up of footpath that runs adjacent to the southbound off slip at junction 65 (Birtley). | To be temporarily stopped up from point 7/1 to point 7/2 on Sheet 7 of the Streets, Rights of Way and Access Plans. | To be substituted temporarily by a diversion route that runs to the north of the existing footpath from point 7/1 to point 7/2 on Sheet 7 of the Streets, Rights of Way and Access Plans. |
Temporary stopping up of Public Right of Way LA/40/10 leading to the B1296 Longbank. | To be temporarily stopped up between point 5/6 and 5/7 on Sheet 5 of the Streets, Rights of Way and Access Plans. | To be substituted temporarily by a diversion route from point 5/6 and 5/7 on Sheet 5 of the Streets, Rights of Way and Access Plans. |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: