Search Legislation

The Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) (No. 2) Regulations 2019

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening Options

Changes over time for: The Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) (No. 2) Regulations 2019

 Help about opening options

Alternative versions:

Status:

This version of this Instrument contains provisions that are prospective. Help about Status

Close

Status

The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section. A version of a provision is prospective either:

  1. where the provision (Part, Chapter or section) has never come into force or;
  2. where the text of the provision is subject to change, but no date has yet been appointed by the appropriate person or body for those changes to come into force.

Commencement Orders listed in the ‘Changes to Legislation’ box as not yet applied may bring this prospective version into force.

Changes to legislation:

There are currently no known outstanding effects for the The Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) (No. 2) Regulations 2019. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Statutory Instruments

2019 No. 916

Exiting The European Union

Climate Change

The Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) (No. 2) Regulations 2019

Sift requirements satisfied

1st May 2019

Made

8th May 2019

Laid before Parliament

9th May 2019

Coming into force in accordance with regulation 1

The Secretary of State makes these Regulations in exercise of the powers conferred by section 8(1) of the European Union (Withdrawal) Act 2018 M1.

The requirements of paragraph 3(2) of Schedule 7 to that Act (relating to the appropriate Parliamentary procedure for these Regulations) have been satisfied.

Marginal Citations

PART 1U.K.Introduction

Citation and commencementU.K.

1.  These Regulations may be cited as the Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) (No. 2) Regulations 2019 and come into force on the later of exit day or the 21st day after the day on which these Regulations are laid before Parliament.

Commencement Information

I1Reg. 1 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

PART 2U.K.Amendment of the Greenhouse Gas Emissions Trading Scheme Regulations 2012

Prospective

Amendment of the Greenhouse Gas Emissions Trading Scheme Regulations 2012U.K.

F12.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

PART 3U.K.Amendment of the Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) Regulations 2019

Prospective

Amendment of the Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) Regulations 2019U.K.

F13.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

PART 4U.K.Amendment of EU Regulations

Prospective

Amendment of Commission Regulation (EU) No 601/2012U.K.

F14.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Prospective

Amendment of Article 15U.K.

F15.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Prospective

Amendment of Article 49U.K.

F16.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Amendment of Commission Implementing Regulation (EU) 2018/2067U.K.

7.  Commission Implementing Regulation (EU) 2018/2067 of 19 December 2018 on the verification of data and on the accreditation of verifiers pursuant to Directive 2003/87/EC of the European Parliament and of the Council is amended in accordance with regulations 8 to 61.

Commencement Information

I2Reg. 7 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 1U.K.

8.  In Article 1—

(a)in the first paragraph, for “Directive 2003/87/EC” substitute “ the 2012 Regulations ”;

(b)omit the second paragraph.

Commencement Information

I3Reg. 8 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 2U.K.

9.  In Article 2 for the words from “Article 14” to the end, substitute “ regulation 35(4) and paragraph 2(1)(e)(ii) of Schedule 4 to the 2012 Regulations ”.

Commencement Information

I4Reg. 9 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 3U.K.

10.  In Article 3—

(a)in the first sentence omit “Article 3 of Directive 2003/87/EC and”;

(b)before paragraph (1), insert—

(A1) ‘the 2012 Regulations’ means the Greenhouse Gas Emissions Trading Scheme Regulations 2012;;

(c)in paragraph (2), for “harmonised standards, within the meaning of point 9 of Article 2 of Regulation (EC) No 765/2008” substitute “ EN ISO 14065:2013 M2;

(d)in paragraph (3), omit the words “or a natural person otherwise authorised, without prejudice to Article 5(2) of that Regulation,”;

(e)after paragraph (4), insert—

(4a) ‘aircraft operator’ means the person who operates an aircraft at the time it performs an aviation activity or, where that person is not known or is not identified by the owner of the aircraft, the owner of the aircraft;

(4b) ‘emissions’ has the meaning given in Article 3(b) of Directive 2003/87/EC;;

(f)in paragraph (7), for the words from “Article 14(3)” to the end, substitute “ regulation 35(4) and paragraph 2(1)(e)(ii) of Schedule 4 to the 2012 Regulations; ”;

(g)after paragraph (7), insert—

(7a) ‘greenhouse gas emissions permit’ has the same meaning as in the 2012 Regulations;

(7b) ‘aviation activity’ has the same meaning as in the 2012 Regulations;;

(h)in paragraph (11), omit the words from “or pursuant to Article 11” to the end;

(i)after paragraph (12), insert—

(12a) ‘the CCS licensing regime’ means Chapter 3 of Part 1 of the Energy Act 2008 and other domestic legislation which immediately before exit day implemented Directive 2009/31/EC M3;;

(j)in paragraph (13), omit point (c);

(k)omit paragraphs (28) and (29).

Commencement Information

I5Reg. 10 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Marginal Citations

M2ISO 14065:2013 specifies principles and requirements for bodies that undertake validation or verification of greenhouse gas (GHG) assertions, available at https://www.iso.org/standard/60168.html. Copy available for inspection at the Department for Business, Energy & Industrial Strategy at 1 Victoria Street, London, SW1H 0ET, United Kingdom.

M3Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geological storage of carbon dioxide and amending Council Directive 85/337/EEC, European Parliament and Council Directives 2000/60/EC, 2001/80/EC, 2004/35/EC, 2006/12/EC, 2008/1/EC and Regulation (EC) No 1013/2006. OJ L 140, 5.6.2009, p.114.

New Article 3aU.K.

11.  After Article 3 insert—

Article 3aU.K.Interpretation

In this Regulation:

(a)references to a national accreditation body are references to the national accreditation body of the United Kingdom appointed in accordance with Article 4(1) of Regulation (EC) No 765/2008;

(b)references to Implementing Regulation (EU) 2018/2066 are to be construed as references to Commission Regulation (EU) No 601/2012 and read in accordance with the following correlation table.

Correlation tableU.K.

Implementing Regulation (EU) 2018/2066Commission Regulation (EU) No 601/2012
Article 1 to 49Article 1 to 49
Article 50
Article 51 to 54Article 50 to 53
Article 55Article 54
Article 56Article 55
Article 57
Article 58Article 57
Article 59Article 58
Article 60Article 59
Article 61 to 65Article 60 to 64
Article 66Article 65
Article 67 to 68Article 66 to 67
Article 69 to 75Article 69 to 75
Article 76
Article 77 to 78Article 76 to 77
Annex 1 to 10Annex 1 to 10
Annex 11

Commencement Information

I6Reg. 11 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 4U.K.

12.  In Article 4—

(a)for “the relevant harmonised standards as defined in point (9) of Article 2 of Regulation (EC) No 765/2008, or parts thereof, the references of which have been published in the Official Journal of the European Union” substitute “ EN ISO 14065:2013 ”;

(b)for “the applicable harmonised standards” substitute “ those standards ”.

Commencement Information

I7Reg. 12 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 6U.K.

13.  In Article 6—

(a)in the first paragraph omit “, baseline data report or new entrant data report”;

(b)in the second paragraph omit “or data relevant for free allocation”.

Commencement Information

I8Reg. 13 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 7U.K.

14.  In Article 7—

(a)in paragraph 3, omit “responsible for Directive 2003/87/EC”;

(b)in paragraph 4,

(i)in the first subparagraph—

(aa)in point (a) omit the words from “or in Annex IV” to the end;

(bb)omit point (c);

(ii)omit the second subparagraph;

(iii)for the third subparagraph, substitute—

For the purpose of point (d) of this paragraph, the verifier shall obtain clear and objective evidence from the operator or aircraft operator to support the reported aggregated emissions or tonne-kilometres taking into account all other information provided in the operator's or aircraft operator's report.;

(c)for paragraph 5, substitute—

5.   If the verifier discovers that an operator or an aircraft operator is not complying with Implementing Regulation (EU) 2018/2066, that irregularity shall be included in the verification report even if the monitoring plan concerned has been approved by the competent authority.;

(d)in paragraph 6, omit the second subparagraph.

Commencement Information

I9Reg. 14 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 9U.K.

15.  In Article 9(1)—

(a)in point (b) omit “or the monitoring methodology plan, as appropriate”;

(b)in point (e) for “greenhouse gas emissions, tonne-kilometre data or data relevant for free allocation” substitute “ greenhouse gas emissions or tonne-kilometre data ”.

Commencement Information

I10Reg. 15 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 10U.K.

16.  In Article 10(1)—

(a)omit point (c);

(b)in point (e), omit the words from “or Article 11(1)” to “as appropriate,”;

(c)omit point (f);

(d)in point (g), omit “or the monitoring methodology plan,”;

(e)for point (h), substitute—

(h)the operator's or aircraft operator's annual emission or tonne-kilometre report, as appropriate;;

(f)omit point (i);

(g)for point (m), substitute—

(m)the verification report from the previous year, if the verifier did not carry out the verification for that particular operator or aircraft operator the previous year;;

(h)in point (n), omit “or monitoring methodology plan, as appropriate”;

(i)in point (p)—

(i)for “Directive 2009/31/EC” substitute “ the CCS licensing regime ”;

(ii)for “required by that Directive and the reports required by Article 14 of that Directive” substitute “ and reports required by that regime ”.

Commencement Information

I11Reg. 16 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 11U.K.

17.  In Article 11—

(a)in paragraph 3—

(i)for point (c), substitute—

(c)the monitoring plan approved by the competent authority as well as the specifics of the monitoring methodology laid down in that monitoring plan;;

(ii)for point (d), substitute—

(d)the nature, scale and complexity of emission sources and source streams as well as the equipment and processes that have resulted in emissions or tonne-kilometre data, including the measurement equipment described in the monitoring plan, the origin and application of calculation factors and other primary data sources;;

(b)in paragraph 4—

(i)for point (a), substitute—

(a)whether the monitoring plan presented to it is the most recent version approved by the competent authority;;

(ii)in point (b), omit “or of the monitoring methodology plan during the baseline period, as appropriate”;

(iii)in point (c), omit “where applicable,”;

(iv)omit point (d).

Commencement Information

I12Reg. 17 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 13U.K.

18.  In Article 13—

(a)in paragraph 1, for point (c) substitute—

(c)a data sampling plan setting out the scope and methods of data sampling related to data points underlying the aggregated emissions in the operator or aircraft operator's emission report or the aggregated tonne-kilometre data in the aircraft operator's tonne-kilometre report.;

(b)in paragraph 2, for “Article 7(4)(b), (c), (d) or the second subparagraph of Article 7(4)” substitute “ Article 7(4)(b) or (d) ”.

Commencement Information

I13Reg. 18 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 14U.K.

19.  In Article 14—

(a)in the first paragraph, omit “or monitoring methodology plan, as appropriate”;

(b)in the second paragraph in point (c), omit “or monitoring methodology plan, as appropriate,”.

Commencement Information

I14Reg. 19 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 16U.K.

20.  In Article 16(2)—

(a)omit “or monitoring methodology plan, as appropriate”;

(b)omit point (b);

(c)for point (c), substitute—

(c)for the purposes of verifying an operator's emission report, the completeness of source streams and emission sources as described in the monitoring plan approved by the competent authority;;

(d)in point (d) omit “listed in Annex I to Directive 2003/87/EC”.

Commencement Information

I15Reg. 20 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 17U.K.

21.  In Article 17—

(a)omit paragraph 3;

(b)in paragraph 4, omit “or transferred N2O is not counted in accordance with Article 50 of that Regulation” and “or N2O transferred”;

(c)omit paragraph 5.

Commencement Information

I16Reg. 21 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 18U.K.

22.  In Article 18, omit paragraph 3.

Commencement Information

I17Reg. 22 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 19U.K.

23.  In Article 19, omit paragraph 3.

Commencement Information

I18Reg. 23 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 21U.K.

24.  In Article 21—

(a)omit paragraph 4;

(b)in paragraph 5, omit “baseline data report or new entrant data report,”.

Commencement Information

I19Reg. 24 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 22U.K.

25.  In Article 22—

(a)in paragraph 1—

(i)for the first subparagraph substitute—

If the verifier identifies misstatements, non-conformities or non-compliance with Implementing Regulation (EU) 2018/2066 during the verification, it shall inform the operator or aircraft operator thereof on a timely basis and request relevant corrections.;

(ii)for the third subparagraph substitute—

Where a non-compliance with Implementing Regulation (EU) 2018/2066 has been identified, the operator or aircraft operator shall notify the competent authority and correct the non-compliance as appropriate without undue delay.;

(b)for paragraph 2, substitute—

The verifier shall document and mark as resolved in the internal verification documentation all misstatements, non-conformities or non-compliance with Implementing Regulation (EU) 2018/2066 that have been corrected by the operator or aircraft operator during the verification.;

(c)in paragraph 3—

(i)in the second subparagraph, for “, tonne-kilometre data or data relevant for free allocation” substitute “ or tonne-kilometre data ”;

(ii)for the fourth subparagraph substitute—

If the operator or aircraft operator does not correct the non-compliance with Implementing Regulation (EU) 2018/2066 in accordance with paragraph 1 before the verifier issues the verification report, the verifier shall assess whether the uncorrected non-compliance has an impact on the reported data and whether this leads to material misstatement..

Commencement Information

I20Reg. 25 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 23U.K.

26.  In Article 23, omit paragraph 4.

Commencement Information

I21Reg. 26 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 24U.K.

27.  In Article 24 in point (c), omit “or monitoring methodology plan, as appropriate”.

Commencement Information

I22Reg. 27 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 26U.K.

28.  For Article 26(1)(c), substitute—

(c)sufficient information to support the verification opinion, including justifications for judgments made on whether or not the misstatements identified have material effect on the reported emissions or tonne-kilometre data..

Commencement Information

I23Reg. 28 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 27U.K.

29.  In Article 27—

(a)in paragraph 1—

(i)for “each emission report, tonne-kilometre report, baseline data report or new entrant data report” substitute “ each emission report or tonne-kilometre report ”;

(ii)omit point (e);

(b)in paragraph 3—

(i)for point (e), substitute—

(e)the criteria used to verify the operator's or aircraft operator's report, including the permit, where applicable, and versions of the monitoring plan approved by the competent authority as well as the period of validity for each monitoring plan;;

(ii)omit point (f);

(iii)in point (g) for “per activity referred to in Annex I to Directive 2003/87/EC and per installation or aircraft operator” substitute “ per aviation activity and per aircraft operator or per activity, other than aviation, listed in Annex 1 to Directive 2003/87/EC and per installation ”;

(iv)omit point (h);

(v)in point (i), omit “or baseline period”;

(vi)for point (o), substitute—

(o)any issues of non-compliance with Implementing Regulation (EU) 2018/2066 which have become apparent during the verification;;

(vii)omit points (q) and (r);

(c)in paragraph 4—

(i)for the first sub paragraph, substitute—

The verifier shall describe the misstatements, non-conformities and non-compliance with Implementing Regulation (EU) 2018/2066 in sufficient detail in the verification report to allow the operator or aircraft operator as well as the competent authority to understand the following:;

(ii)for point (a), substitute—

(a)the size and nature of the misstatement, non-conformity or non-compliance with Implementing Regulation (EU) 2018/2066;;

(iii)in point (c), omit “or the monitoring methodology plan”;

(iv)for point (d), substitute—

(d)to which Article in Implementing Regulation (EU) 2018/2066 the non-compliance relates.;

(d)in paragraph 5, for “a Member State” substitute “ the competent authority ”.

Commencement Information

I24Reg. 29 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 28U.K.

30.  In Article 28—

(a)in point (c), omit “or monitoring methodology plan, as appropriate,”;

(b)omit point (e).

Commencement Information

I25Reg. 30 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 30U.K.

31.  In Article 30(1)—

(a)for “points (a) to (e)” substitute “ points (a) to (d) ”;

(b)in point (c), omit the words from “or Article 11(2)” to the end;

(c)omit point (e).

Commencement Information

I26Reg. 31 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 31U.K.

32.  In Article 31(3), omit point (d).

Commencement Information

I27Reg. 32 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 37U.K.

33.  In Article 37(5), omit the second subparagraph.

Commencement Information

I28Reg. 33 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 38U.K.

34.  For Article 38(1)(a) substitute—

(a)knowledge of Directive 2003/87/EC, Implementing Regulation (EU) 2018/2066, this Regulation, relevant standards, and other relevant legislation, applicable guidelines, as well as relevant guidelines and legislation issued by the competent authority or Secretary of State;.

Commencement Information

I29Reg. 34 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Articles 41 and 42U.K.

35.  In Articles 41 and 42, for “harmonised standard” in each place it occurs substitute “ standard ”.

Commencement Information

I30Reg. 35 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 43U.K.

36.  In Article 43—

(a)for “harmonised standard” in each place it occurs substitute “ standard ”;

(b)in paragraph 3—

(i)in point (a), omit “or in the monitoring methodology plan, as applicable” and “or monitoring methodology plan”;

(ii)in point (b), for “emissions, tonne-kilometre data or data relevant for free allocation” substitute “ emissions or tonne-kilometre data. ”.

Commencement Information

I31Reg. 36 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 44U.K.

37.  In Article 44, omit the second paragraph.

Commencement Information

I32Reg. 37 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Articles 46, 47, 48 and 49U.K.

38.  In Articles 46, 47, 48, and 49, for “harmonised standard” in each place it occurs substitute “ standard ”.

Commencement Information

I33Reg. 38 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 50U.K.

39.  In Article 50—

(a)in paragraph 3, for “harmonised standard” substitute “ standard ”;

(b)omit paragraph 5.

Commencement Information

I34Reg. 39 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Articles 51 and 52U.K.

40.  In Articles 51 and 52, for “harmonised standard” in each place it occurs substitute “ standard ”.

Commencement Information

I35Reg. 40 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 54U.K.

41.  In Article 54(4), in the second subparagraph for “Member States” substitute “ The national accreditation body ”.

Commencement Information

I36Reg. 41 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 55U.K.

42.  In Article 55—

(a)in paragraph 1, for “national accreditation bodies appointed pursuant to Article 4(1) of Regulation (EC) No 765/2008” substitute “ national accreditation body ”;

(b)omit paragraphs 2 to 4;

(c)in paragraph 5, omit the words “and be granted formal recognition by the Member State,”;

(d)in paragraph 6, for “harmonised standard” substitute “ standard ”.

Commencement Information

I37Reg. 42 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Omission of Article 56U.K.

43.  Omit Article 56.

Commencement Information

I38Reg. 43 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 57U.K.

44.  In Article 57(4), for “harmonised standard” substitute “ standard ”.

Commencement Information

I39Reg. 44 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 58U.K.

45.  In Article 58(2), omit the third subparagraph.

Commencement Information

I40Reg. 45 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 59U.K.

46.  In Article 59(1)—

(a)in point (a), for “harmonised standard pursuant to Regulation (EC) No 765/2008” substitute “ standard ”;

(b)in point (b), omit the words from “Delegated Regulation” to “in Annex I of this Regulation,”.

Commencement Information

I41Reg. 46 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 60U.K.

47.  In Article 60(2)(a) omit the words from “Delegated Regulation” to “in Annex I of this Regulation,”.

Commencement Information

I42Reg. 47 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 63U.K.

48.  In Article 63(2), for “harmonised standard pursuant to Regulation (EC) No 765/2008” substitute “ standard ”.

Commencement Information

I43Reg. 48 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Omission of Articles 65 to 68U.K.

49.  Omit Articles 65 to 68.

Commencement Information

I44Reg. 49 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 69U.K.

50.  In Article 69(1)—

(a)for “Member States” substitute “ The competent authority ”;

(b)omit the words from “or in accordance with Article 13” to the end.

Commencement Information

I45Reg. 50 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 70U.K.

51.  In Article 70—

(a)in paragraph 1—

(i)for “Member State” substitute “ the Secretary of State ”;

(ii)omit the words “, or where applicable, the national authority entrusted with the certification of verifiers,”;

(b)in paragraph 2, for “pursuant to Article 18 of Directive 2003/87/EC in a Member State, the Member State” substitute “ in the United Kingdom, the Secretary of State with the agreement of the other authorities ”.

Commencement Information

I46Reg. 51 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 71U.K.

52.  In Article 71(1)—

(a)omit “of each Member State”;

(b)for “those Member States” substitute “ the United Kingdom ”;

(c)omit point (d).

Commencement Information

I47Reg. 52 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 72U.K.

53.  In Article 72—

(a)for “the following parties:” substitute “ the competent authority. ”;

(b)omit points (a) and (b).

Commencement Information

I48Reg. 53 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 73U.K.

54.  In Article 73(1), omit “of the Member State where the verifier is carrying out the verification” and “which has accredited that verifier”.

Commencement Information

I49Reg. 54 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Omission of Articles 74 and 75U.K.

55.  Omit Articles 74 and 75.

Commencement Information

I50Reg. 55 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 76U.K.

56.  In Article 76—

(a)in paragraph 1—

(i)in the first subparagraph omit “other national accreditation bodies,”;

(ii)omit the second subparagraph;

(b)in paragraph 2, omit point (b).

Commencement Information

I51Reg. 56 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 77U.K.

57.  In Article 77(1)(b), for “emissions, tonne-kilometre reports, baseline data reports or new entrant data reports” substitute “ emissions or tonne-kilometre reports ”.

Commencement Information

I52Reg. 57 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Article 79U.K.

58.  In Article 79, omit “This Regulation shall be binding in its entirety and directly applicable in all Member States.”.

Commencement Information

I53Reg. 58 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Annex 1U.K.

59.  In Annex 1—

(a)before the table—

(i)after “using” insert “ aviation activities or in relation to the activities other than aviation using ”;

(ii)omit the words from “and other activities pursuant to Articles 10a” to the end;

(b)in the table—

(i)in the rows for activity group 10—

(aa)for “Directive 2003/87/EC” substitute “ the 2012 Regulations ”;

(bb)for “Directive 2009/31/EC” in each place it occurs substitute “ the CCS licensing regime ”;

(ii)in the rows for activity group 11 for “Directive 2009/31/EC” substitute “ the CCS licensing regime ”;

(iii)omit the rows for activity groups 98 and 99.

Commencement Information

I54Reg. 59 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Annex 2U.K.

60.  In Annex 2, for “the harmonised standard pursuant to Regulation (EC) No 765/2008” substitute “ EN ISO 14065:2013 ”.

Commencement Information

I55Reg. 60 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Amendment of Annex 3U.K.

61.  In Annex 3, for “the harmonised standard pursuant to Regulation (EC) No 765/2008” substitute “ EN ISO/IEC 17011:2017 M4.

Commencement Information

I56Reg. 61 in force at 31.12.2020 on IP completion day (in accordance with 2020 c. 1, Sch. 5 para. 1(1)), see reg. 1

Marginal Citations

M4ISO/IEC 17011:2017 specifies requirements for the competence, consistent operation and impartiality of accreditation bodies assessing and accrediting conformity assessment bodies. Available at: https://www.iso.org/standard/67198.html. Copy available for inspection at the Department for Business, Energy & Industrial Strategy at 1 Victoria Street London, SW1H 0ET, United Kingdom.

PART 5U.K.Revocation

Prospective

Revocation of Commission Delegated Regulation (EU) 2019/331U.K.

F262.  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Henley

Parliamentary Under Secretary of State

Department for Business, Energy and Industrial Strategy

Explanatory Note

(This note is not part of the Regulations)

These Regulations are made in exercise of the powers conferred by section 8 of the European Union (Withdrawal) Act 2018 in order to address failures of retained EU law to operate effectively and other deficiencies arising from the withdrawal of the United Kingdom from the European Union.

The Greenhouse Gas Emissions Trading Scheme (Amendment) (EU Exit) Regulations 2019 (the “Exit Regulations”) related to the continuation of the monitoring, reporting, accreditation and verification obligations of the EU Emissions Trading Scheme (EU ETS) in a no deal scenario. These Regulations address further deficiencies to the functioning of those obligations as a result of the coming into force of Article 76 of Commission Implementing Regulation (EU) 2018/2066 of 19 December 2018 on the monitoring and reporting of greenhouse gas emissions (“the new monitoring regulation”) and Commission Implementing Regulation (EU) 2018/2067 of 19 December 2018 on the verification of data and on the accreditation of verifiers (“the new verification regulation”).

Part 2 amends the Greenhouse Gas Emissions Trading Scheme Regulations 2012 (the “2012 Regulations”) to update the definition of “the Verification Regulation”.

Part 3 amends the Exit Regulations as a consequence of the amendments made by Article 76 of the new monitoring regulation, to Commission Regulation (EU) 601/2012 of 21 June 2012 on the monitoring and reporting of greenhouse gas emissions (“the previous monitoring regulation”).

In Part 4, regulations 5 and 6 address further deficiencies in the previous monitoring regulation introduced by Article 76 of the new monitoring regulation.

The remainder of Part 4 makes amendments to the new verification regulation to ensure the operability of verification requirements after exit. Part 4 also amends the new verification regulation to exclude provisions relating to free allocation, introduced by Commission Delegated Regulation (EU) 2019/331 of 19 December 2018 determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council (the “FAR”) as after exit, in a no deal scenario the UK will no longer continue participating in the free allocation process.

Part 5 provides for the revocation of the FAR.

An impact assessment has not been produced for this instrument as no, or no significant, impact on the private or voluntary sector is foreseen.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources