Search Legislation

The M4 Motorway (Prince of Wales Bridge) (Temporary Restriction and Prohibition of Traffic) Order 2018

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening Options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

2.  In this Order-

“the first length of the M4” means the eastbound and westbound carriageways of the M4 between the mechanical joint at the western end of the M4 Prince of Wales Bridge and a point 740 metres east of the centre of the bridge over the rail line to Severn Tunnel Junction;

“the second length of the M4” means the eastbound and westbound carriageways of the M4 between a point 740 metres east of the centre of the bridge over the rail line to Severn Tunnel Junction and a point 148 metres east of the tip of the nosing of the westbound entry slip road at M4 Junction 22;

“the third length of the M4” means—

(i)

the eastbound carriageway of the M4 from a point 740 metres east of the centre of the bridge over the rail line to Severn Tunnel Junction to a point 400m east of Station Road Bridge; and

(ii)

the westbound carriageway of the M4 from a point from 900m east of Station Road Bridge to a point a point 740 metres east of the centre of the bridge over the rail line to Severn Tunnel Junction;

“tip of the nosing” means the first point where an entry slip road joins the carriageway of a motorway or the last point where an exit slip road leaves the carriageway of a motorway;

“the hard shoulder” means the hard shoulder within the meaning of regulation 3(1)(3) of the Regulations which is adjacent to the second length of the M4;

“the works” means works to remove the toll booths from the toll plaza area;

“the works period” means the period starting at 20.00 hours on Saturday 1st December 2018 and ending when the said works have been completed;

“a works period” means a period of 10 hours starting at 20.00 on Saturday 1st December 2018 and on any subsequent day and ending when the said works have been completed.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources