Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
ZA1. Development is not permitted by Class ZA—
(a)if land covered by, or within the curtilage of, the old building—
(i)is occupied in any part under an agricultural tenancy, unless the express consent of both the landlord and the tenant has been obtained;
(ii)is or forms part of article 2(3) land;
(iii)is or forms part of a site of special scientific interest;
(iv)is or forms part of a listed building or land within its curtilage;
(v)is or forms part of a scheduled monument or land within its curtilage;
(vi)is or forms part of a safety hazard area;
(vii)is or forms part of a military explosives storage area; or
(viii)is within 3 kilometres of the perimeter of an aerodrome;
(b)if the old building was constructed after 31 December 1989;
(c)if the footprint of the old building exceeds 1,000 square metres;
(d)if the height of the highest part of the roof of the old building above ground level (not including plant, radio masts and antennae) is greater than 18 metres at any point;
(e)unless the old building has been vacant for a period of at least 6 months immediately prior to the date of the application for prior approval;
(f)if the old building has been rendered unsafe or otherwise uninhabitable by the action or inaction of any person having an interest in the land on which the old building stands and it is practicable to secure safety or health by works of repair or works for affording temporary support (and for this purpose keeping the old building vacant does not of itself count as action or inaction);
(g)if the demolition is “relevant demolition” for the purposes of section 196D of the Act (demolition of an unlisted etc building in a conservation area);
(h)if any of the footprint of the new building falls outside the footprint of the old building;
(i)if any part of the exterior wall of the new building nearest to a highway is nearer to the highway than the part nearest the highway of the exterior wall nearest the highway of the old building;
(j)if the height (not including plant, radio masts and antennae) of the new building would at any point exceed the lower of—
(i)7 metres above the height (not including plant) of old building; or
(ii)18 metres,
above ground level;
(k)if the new building has more than X + 2 storeys, where “X” is the number of storeys in the old building;
(l)if the new building has more storeys than the old building and the floor to ceiling height of any additional storey in the new building, measured internally, would at any point be greater than the lower of—
(i)the floor to ceiling height, measured internally, of any storey in the old building; or
(ii)3 metres; or
(m)if the height of any plant on the roof of the new building as measured from the lowest surface of that roof would be greater than the height of any existing plant as measured from the lowest surface of the existing roof on the principal part of the old building.]]
Textual Amendments
F1Sch. 2 Pt. 20 inserted (1.8.2020) by The Town and Country Planning (Permitted Development and Miscellaneous Amendments) (England) (Coronavirus) Regulations 2020 (S.I. 2020/632), regs. 1(2), 22
F2Sch. 2 Pt. 20 Class ZA inserted (31.8.2020 at 10.00.a.m.) by The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 3) Order 2020 (S.I. 2020/756), arts. 1(2), 4(2)
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Schedule you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: