8. For the purpose of requirements BRIA1 to BRIA21, the “site” refers to the land within the Order limits shown on sheet no. 12 and “development” refers to Work Nos. 4A, 4B and 4C. Requirements BRIA1 to BRIA21 relate only to development carried out on the site as so defined.
(1) Reference No. | (2) Requirements | |
---|---|---|
BRIA1 | Archaeology | |
(1) The development shall not commence until a scheme for geoarchaeological investigation of potential peat deposits, as outlined in the Volume 3, chapter 16 of the Environmental Statement, has been submitted to and approved by Somerset County Council. | ||
(2) Any archaeological works must be carried out in accordance with the approved scheme. | ||
BRIA2 | Ecology | |
(1) The development shall not commence until an ecological mitigation and monitoring plan reflecting the survey results and ecological mitigation and enhancement measures included in Volume 3, chapter 14 of the Environmental Statement has been submitted to and approved by Sedgemoor District Council. | ||
(2) The ecological mitigation and monitoring plan shall include an implementation timetable and must be carried out as approved. | ||
BRIA3 | Car parking | |
The number of car parking spaces to be provided and available for Work No. 4A for the duration of the HPC construction works shall not exceed 543, unless otherwise approved by Sedgemoor District Council. | ||
BRIA4 | Construction compound | |
(1) Buildings, structures, plant, equipment, uses, construction hoardings and means of enclosure required in connection with construction of the development shall be built and used in accordance with Section 6 of the Construction Method Statement and as set out in Figure 3.1 (Environmental Statement, Volume 3) Construction Work Area and Access Plan, unless otherwise approved by Sedgemoor District Council. | ||
(2) Following completion of construction works on site, all temporary structures, plant and equipment required for construction of the development shall be removed. | ||
BRIA5 | Landscape works | |
(1) No development shall commence until a landscape scheme has, following consultation with the Environment Agency, been submitted to and approved by Sedgemoor District Council. The landscape scheme shall be developed in general accordance with the landscape strategy drawings 500106 (Rev 01): Proposed Hard and Soft Landscape Works During Operation and 500108 (Rev 01): Tree and Hedgerow Retention and Removal Plan, and the relevant sections of the Bridgwater A Design and Access Statement and Bridgwater A Flood Risk Assessment. The landscape scheme shall include details of all proposed landscape works, including— | ||
(a) | soft landscape details; | |
(b) | proposed finished ground levels; | |
(c) | hard surfacing materials; | |
(d) | street furniture, security cabins, bus shelters, refuse or other storage units; | |
(e) | vehicular and pedestrian access, parking and circulation areas; | |
(f) | details of existing trees to be retained, with measures for their protection during construction of the development; | |
(g) | plant establishment, maintenance and management arrangements; and | |
(h) | an implementation timetable for all landscaping works. | |
(2) All landscape works must be carried out in accordance with the landscape scheme approved under this requirement and in accordance with the relevant recommendations of appropriate British Standards. | ||
BRIA6 | Fencing | |
(1) Except for fencing erected pursuant to requirement BRIA4, no security fences, walls or other means of enclosure shall be erected until details of their layout, scale and appearance have been submitted to and approved by Sedgemoor District Council. | ||
(2) Work No. 4A must remain securely fenced at all times during construction and operation of Work No. 4A. | ||
BRIA7 | Lighting | |
(1) Installation of external lighting shall not commence until details of external lighting, including a scheme for the management and mitigation of artificial light emissions, have been submitted to and approved by Sedgemoor District Council. The lighting scheme shall be in accordance with section 7 (Development Proposals) of the Bridgwater A Design and Access Statement. | ||
(2) The approved scheme for the management and mitigation of artificial light emissions must be implemented and maintained during the construction and operation of the development. | ||
BRIA8 | Signage | |
(1) Except for signage which the undertaker is permitted to erect by virtue of the Town and Country Planning (Control of Advertisement) Regulations 2007 or any signage set out in the approved plans, no signage shall be erected on the site until details of the location, size, colour, projection and method of any illumination have been submitted to and approved by Sedgemoor District Council. Signage details shall be in accordance with section 6 (Design Principles) of the Bridgwater A Design and Access Statement. | ||
(2) Signage referred to in paragraph (1) shall be implemented in accordance with the approved details. | ||
BRIA9 | Flood Risk Assessment / resilience | |
(1) No development shall commence until a flood resilience scheme for the Bridgwater A accommodation campus buildings and associated structures (Work No. 4A(c)) has, following consultation with the Environment Agency, been submitted to and approved by Sedgemoor District Council. The flood resilience scheme shall set out the measures that will be incorporated within the building design, such as the location of service entry points, and the positioning of internal electrical sockets at appropriate heights above finished floor levels. | ||
(2) The development shall be carried out in accordance with the details approved under paragraph (1), unless otherwise approved by Sedgemoor District Council. | ||
BRIA10 | Finished floor levels | |
(1) The development of the Bridgwater A accommodation campus buildings (Work No. 4A(c)) shall not commence until details of all proposed finished floor levels have been submitted to and approved by Sedgemoor District Council. | ||
(2) The development shall be carried out in accordance with the details approved under paragraph (1). | ||
BRIA11 | Surface and foul water | |
(1) The development shall not commence until details of the surface and foul water drainage system (including means of pollution control and details of the future responsibility and maintenance arrangements) have, after consultation with the Environment Agency, the sewerage authority and drainage authority (Parrett Internal Drainage Board), been submitted to and approved by Sedgemoor District Council. | ||
(2) The surface and foul water drainage system shall be constructed in accordance with the approved details. | ||
BRIA12 | Treatment of potential contaminants | |
(1) The development shall not commence until a scheme to treat and remove suspended solids, hydrocarbons and concrete leachate, and any other potential contaminant, from surface water run-off during construction works has, after consultation with the Environment Agency, been submitted to and approved by Sedgemoor District Council. | ||
(2) The development shall be carried out in accordance with the details approved under paragraph (1). | ||
BRIA13 | North East Bridgwater drainage scheme | |
(1) The development shall be connected into the wider North East Bridgwater surface water master drainage scheme already approved under the planning permission granted on 2nd July 2010 by Sedgemoor District Council in respect of the urban extension of North East Bridgwater with reference number 09/08/00017 once the rhyne rationalisation works are available to service the site drainage. | ||
(2) Unless otherwise agreed, the works referred to in paragraph (1) shall be implemented within six months of either the North East Bridgwater surface water master drainage scheme or the development being available for use, whichever is the later. | ||
BRIA14 | Highways | |
The Bridgwater A accommodation buildings (Work No. 4A(c)) shall not be brought into use until Work Nos. 4A(g) (Bus Stops), 4B and 4C are available for use. | ||
BRIA15 | Post-operation | |
All proposed buildings on the site of Work No. 4 shall be demolished, and all materials resulting from their demolition shall be removed from the site, within 12 months of the completion of the HPC construction works. | ||
BRIA16 | Sports Pitches | |
The external sports facilities shall not be used or associated lighting operated between the hours of 22:00 and 08:00. | ||
BRIA17 | Contamination | |
(1) No development shall commence until the following have been submitted to and approved by Sedgemoor District Council— | ||
(a) | the remediation strategy required by condition 33 of planning permission granted on 2nd July 2010 by Sedgemoor District Council in respect of the urban extension of North East Bridgwater with reference number 09/08/00017; or | |
(b) | following consultation with the Environment Agency, a remediation strategy which details the required measures and a method statement for the remediation works. | |
(2) Where works are undertaken pursuant to the details approved under paragraph (1)(b), a verification plan shall be submitted to and approved by Sedgemoor District Council. The verification plan shall demonstrate that the remedial works referred to in paragraph (1)(b) are complete. The verification plan shall identify necessary arrangements for monitoring of pollutant linkages, maintenance and contingency measures. | ||
(3) The remediation strategy shall be implemented as approved, unless otherwise approved by Sedgemoor District Council. | ||
BRIA18 | Infiltration of surface water drainage | |
(1) No infiltration of surface water drainage into the ground shall be permitted unless and until details demonstrating that there is no unacceptable risk to controlled waters have, following consultation with the Environment Agency, been submitted to and approved by Sedgemoor District Council. | ||
(2) The development shall be carried out in accordance with the approved details. | ||
BRIA19 | Piling | |
(1) No piling or any other foundation designs using penetrative methods shall be used unless and until details demonstrating that there is no unacceptable risk to controlled waters have, in consultation with the Environment Agency, been submitted to and approved by Sedgemoor District Council. | ||
(2) The development shall be carried out in accordance with the approved details. | ||
BRIA20 | Migration paths for contaminants | |
(1) No development shall commence until details and plans demonstrating measures to prevent underground services acting as migration pathways for contaminants have, after consultation with the Environment Agency, been submitted to and approved by Sedgemoor District Council. | ||
(2) The development shall be carried out in accordance with the approved details. | ||
BRIA21 | Bridgwater Sports and Social Club | |
No development authorised by this Order shall take place on the site of the Bridgwater Sports and Social Club, until a scheme giving assurance that the existing playing fields will be replaced by at least equivalent facilities has been submitted to and approved by Sedgemoor District Council. |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: