Search Legislation

The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2012 No. 2706

Highways, England

The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012

Made

18th October 2012

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980(1) and now vested in the Secretary of State(2):

1.  This Instrument may be cited as The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2.  The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009 Confirmation Instrument 2012 (“the Scheme”) is hereby confirmed with modifications.

3.  The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA, and at the offices of Sunderland City Council at Civic Centre, Sunderland, SR2 7DN.

Signed by authority of the Secretary of State for Transport

M R Fawcett

A Senior Civil Servant in the

Department for Transport

18th October 2012

THE SCHEDULEHighways Act 1980, Section 106(3)

The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009

The Council of the City of Sunderland (“the Council”) make this Scheme in exercise of their powers under Section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:-

1.  The Council are authorised to construct over the navigable waters of the River Wear the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct/improve between the Wessington Way/Castletown Way roundabout and the Woodbine Terrace/Pallion New Road junction in the City of Sunderland.

2.  This Scheme may be cited as The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009.

Given under the seal of the Council on the 4th day of November 2009

THE SEAL of THE COUNCIL OF THE CITY OF SUNDERLAND was hereunto affixed in the presence of:-

R C Rayner

Authorised Signatory

THE SCHEDULE TO THE SCHEMEPLAN AND SPECIFICATIONS OF THE NEW WEAR BRIDGE

The location and general design of the Bridge are shown on the plans numbered 8132/100 and 8132/101 marked The Sunderland City Council (Sunderland Strategic Transport Corridor – New Wear Bridge) Scheme 2009.

  • POINTS OF COMMENCEMENT AND TERMINATION

    From a point on the South Bank of the River Wear 155 metres east of the centre of the roundabout junction between A1231 Wessington Way and Castletown Way located on the north bank.

    To a point on the North Bank of the River Wear 30 metres east of the centre of the roundabout junction between A1231 Wessington Way and Castletown Way.

  • SPAN

    A double span of 336 metres overall.

  • HEADWAY

    Not less than 12.9 metres above the mean high water spring tide level (MHWS) of 2.5 metres AOD.

  • WATERWAY

    A minimum clear navigable waterway of 30 metres.

  • OVERALL DIMENSIONS

    The Bridge will be 25.2 metres wide overall and will carry a dual 7.3 metre wide carriageway with a 1.8 metre central reserve with a footway of 2 metres width on the east side, separated from the carriageway by a 1 metre median, and a footway and cycleway of 4 metres width on the west side of the structure, separated from the carriageway by a 1 metre median.

EXPLANATORY NOTE

(This note is not part of the Order)

This instrument confirms a scheme to construct over the navigable waters of the River Wear a bridge as part of the highway which is to be constructed/improved between the Wessington Way/Castletown Way roundabout and the Woodbine Terrace/Pallion New Road junction in the City of Sunderland.

The Secretary of State has modified this scheme as follows: Under “SPAN” the word “plan” has been amended to “span”.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources