Search Legislation

The Libya (United Nations Sanctions) Order 1993

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

More Resources

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Articles 3 to 6

SCHEDULE 1

PART A(Arms)

The goods specified in Part II of, or in Group 1 of Part III of, Schedule 1 to the Export of Goods (Control) Order 1992 and, to the extent to which they are not included in the foregoing, equipment specially designed or adapted for police use and spare parts therefor.

PART B(Aircraft)

Any aircraft and any component specially designed for aircraft.

PART C(Airfield infrastructure)

Any materials specially designed or prepared or destined for the construction, improvement or maintenance of civilian or military airfields and their associated facilities and equipment, with the exception of emergency equipment and equipment directly related to civilian air traffic control.

PART D(Oil industry equipment)

1.  Pumps of a capacity of 350 cubic metres per hour or more and drivers (gas turbines and electric motors) designed for use in the transportation of crude oil or natural gas.

2.  Equipment designed for use in crude oil export terminals, as follows:

  • loading buoys or single point moorings (spm)

  • flexible hoses of 12 to 16 inches in diameter for connection between underwater manifolds (plem)

  • single point mooring and floating loading hoses of 12 to 16 inches in diameter

  • anchor chains.

3.  Equipment not specifically designed for use in crude oil export terminals but which because of their large capacity can be used for this purpose, as follows:

  • loading pumps with a capacity of 4,000 cubic metres per hour or more and of small head (10 bars)

  • boosting pumps within the same range of flow rates

  • inline pipe line inspection tools and cleaning devices (i.e pigging tools) of 16 inches or more in diameter

  • metering equipment with a capacity of 1,000 cubic metres per hour or more.

4.  Refinery equipment, as follows:

  • pumps meeting American Petroleum Institute (API) 610 standards

  • boilers meeting industry 1 standards

  • furnaces meeting industry 8 standards

  • fractionation columns meeting industry 8 standards

  • catalytic reactors meeting industry 8 standards,

  • prepared catalysts, including the following:

    • catalysts containing platinum

    • catalysts containing molybdenum.

5.  Any spare parts or other equipment or supplies specially designed or prepared or destined for the manufacture or maintenance of any of the equipment listed in paragraphs 1 to 4 above.

6.  Except as otherwise indicated, the standards referred to in paragraph 4 above are those of the American Society of Mechanical Engineers (ASME).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources