Search Legislation

Factories Act 1961

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Section 35

 Help about opening options

Version Superseded: 21/02/2000

Alternative versions:

Status:

Point in time view as at 01/04/1994. This version of this provision has been superseded. Help about Status

Close

Status

You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.

Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.

Changes to legislation:

There are currently no known outstanding effects for the Factories Act 1961, Section 35. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

[F135 Steam receivers and steam containers.E+W+S

(1)Every steam receiver, not so constructed and maintained as to withstand with safety the maximum permissible working pressure of the boiler or the maximum pressure which can be obtained in the pipe connecting the receiver with any other source of supply, shall be fitted with—

(a)a suitable reducing valve or other suitable automatic appliance to prevent the safe working pressure being exceeded; and

(b)a suitable safety valve so adjusted as to permit the steam to escape as soon as the safe working pressure is exceeded, or a suitable appliance for cutting off automatically the supply of steam as soon as the safe working pressure is exceeded; and

(c)a correct steam pressure gauge, which must indicate the pressure of steam in the receiver . . . F2; and

(d)a suitable stop valve; and

(e)except where only one steam receiver is in use, a plate bearing a distinctive number which shall be easily visible.

(2)The safety valve and pressure gauge shall be fitted either on the steam receiver or on the supply pipe between the receiver and the reducing valve or other appliance to prevent the safe working pressure being exceeded.

(3)Where any set of receivers is supplied with steam through a single pipe and the reducing valve or other appliance required by paragraph (a) of subsection (1) of this section is fitted on that pipe, the set shall be treated as one receiver for the purposes of paragraphs (a) to (c) of subsection (1) and for the purposes of subsection (2) of this section, and if the set forms part of a single machine, also for the purposes of paragraph (d) of the said subsection (1).

(4)Every part of every steam receiver shall be of good construction, sound material, adequate strength and free from patent defect.

(5)Every steam receiver and its fittings shall be properly maintained, and shall be throughly examined by a competent person, so far as the construction of the receiver permits, at least once in every period of twenty-six months.

(6)A report of the result of every such examination containing the prescribed particulars (including particulars of the safe working pressure) shall be entered in or attached to the general register.

(7)Every steam container shall be so maintained as to secure that the outlet is at all times kept open and free from obstruction.

(8)In this section—

  • safe working pressure” means, in the case of a new steam receiver, that specified by the maker, and in the case of a steam receiver which has been examined in accordance with the provisions of this section, that specified in the report of the last examination;

  • steam receiver” means any vessel or apparatus (other than a steam boiler, steam container, a steam pipe or coil, or a part of a prime mover) used for containing steam under pressure greater than atmospheric pressure;

  • steam container” means any vessel (other than a steam pipe or coil) constructed with a permanent outlet into the atmosphere or into a space where the pressure does not exceed atmospheric pressure, and through which steam is passed at atmospheric pressure or at approximately that pressure for the purpose of heating, boiling, drying, evaporating or other similar purpose.]

Textual Amendments

F1Ss. 32, 35, 36, 125, 127(2)(c) repealed (1.7.1994) by S.I. 1989/2169, reg. 26, Sch. 6 Pt. I

F2Words repealed by S.I. 1974/1941, reg. 7, Sch. 1

Modifications etc. (not altering text)

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources