Channel Tunnel Rail Link Act 1996

Work No. 43D—U.K.Realignment of an existing track between Blind Lane and Forge Lane on the northern side of the M2 (Work No. 42A), commencing at a point 370 metres north-east of the junction of that track with Blind Lane, passing north-eastwards on the northern side of the existing track then northwards and terminating by a junction with Forge Lane (Work No. 43E) at a point 260 metres south-east of its junction with Chapel Lane;