Channel Tunnel Rail Link Act 1996

Work No. 43C—U.K.Realignment of Lidsing Road commencing at a point 260 metres south of the southern end of the existing bridge carrying that road over the M2, passing northwards over the M2 (Works Nos. 42A and 42B) and terminating at a point 70 metres south of the junction of that road with Westfield Sole Road and Blind Lane, including a new bridge over Works Nos. 42A and 42B;