Regulation 5(b)
1. For any type of work specified in column (1) of the Table —
(a)the plan fee payable shall be the amount shown in column (2) of the Table in relation to that type of work;
(b)the inspection fee payable shall be the amount, if any, shown in column (3) of the Table in relation to that type of work;
(c)the building notice fee payable shall be the amount shown in column (4) of the Table in relation to that type of work; and
(d)the regularisation fee payable shall be the amount shown in column (5) of the Table in relation to that type of work.
2.—(1) Where the work in question comprises or includes the erection of more than one extension to a building used or intended to be used for the purposes of a single private dwelling, the total floor areas of all such extensions may, at the election of the person who intends to carry out works, be aggregated in determining the fee payable in accordance with the Table.
(2) In the Table—
(a)a reference to an “extension” is a reference to an extension which has no more than three storeys, each basement level counting as one storey; and
(b)a dwelling includes a reference to a building consisting of any garage or carport or both which is occupied in common with that dwelling.
Type of work | Amount of plan fee | Amount of inspection fee | Amount of building notice fee | Amount of regularisation fee |
---|---|---|---|---|
(1) | (2) | (3) | (4) | (5) |
£ | £ | £ | £ | |
1. Erection of a detached building which consists of a garage or carport or both having a floor area not exceeding 40m2 in total and intended to be used in common with an existing building, and which is not a building specified in Schedule 1 to the principal regulations. | 70 | — | 70 | 84 |
2. Installation of an unvented hot water storage system in accordance with Regulation P5 of the principal regulations, where the installation is not part of a larger project and where the district council carries out an inspection. | 50 | — | 50 | 60 |
3. Any extension of a dwelling (not falling within entry 6) the total floor area of which does not exceed 20m2, including means of access and work in connection with that extension. | 100 | — | 100 | 120 |
4. Any extension of a dwelling (not falling within entry 6) the total floor area of which exceeds 20m2 but does not exceed 40m2, including means of access and work in connection with that extension. | 50 | 100 | 150 | 180 |
5. Any extension of a dwelling (not falling within entry 6) the total floor area of which exceeds 40m2 but does not exceed 60m2, including means of access and work in connection with that extension. | 60 | 120 | 180 | 216 |
6. Any extension or alteration of a dwelling consisting of the provision of one or more rooms in the roof space, including means of access. | 60 | 120 | 180 | 216 |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: