- Latest available (Revised)
- Original (As adopted by EU)
Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast) (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
There are currently no known outstanding effects by UK legislation for Regulation (EU) 2019/943 of the European Parliament and of the Council, CHAPTER II.![]()
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
[F1The Secretary of State, the regulatory authority, transmission system operator, distribution system operator, market operator and delegated operator] shall ensure that electricity markets are operated in accordance with the following principles:
prices shall be formed on the basis of demand and supply;
market rules shall encourage free price formation and shall avoid actions which prevent price formation on the basis of demand and supply;
market rules shall facilitate the development of more flexible generation, sustainable low carbon generation, and more flexible demand;
customers shall be enabled to benefit from market opportunities and increased competition on retail markets and shall be empowered to act as market participants in the energy market and the energy transition;
market participation of final customers and small enterprises shall be enabled by aggregation of generation from multiple power-generating facilities or load from multiple demand response facilities to provide joint offers on the electricity market and be jointly operated in the electricity system, in accordance with F2... competition law;
market rules shall enable the decarbonisation of the electricity system and thus the economy, including by enabling the integration of electricity from renewable energy sources and by providing incentives for energy efficiency;
market rules shall deliver appropriate investment incentives for generation, in particular for long-term investments in a decarbonised and sustainable electricity system, energy storage, energy efficiency and demand response to meet market needs, and shall facilitate fair competition thus ensuring security of supply;
F3...
F3...
safe and sustainable generation, energy storage and demand response shall participate on equal footing in the market, under the requirements provided for in [F4assimilated] law;
all producers shall be directly or indirectly responsible for selling the electricity they generate;
market rules shall allow for the development of demonstration projects into sustainable, secure and low-carbon energy sources, technologies or systems which are to be realised and used to the benefit of society;
market rules shall enable the efficient dispatch of generation assets, energy storage and demand response;
market rules shall allow for entry and exit of electricity generation, energy storage and electricity supply undertakings based on those undertakings' assessment of the economic and financial viability of their operations;
in order to allow market participants to be protected against price volatility risks on a market basis, and mitigate uncertainty on future returns on investment, long-term hedging products shall be tradable on exchanges in a transparent manner and long-term electricity supply contracts shall be negotiable over the counter, subject to compliance with F5... competition law;
market rules shall facilitate trade of products across [F6Great Britain] and. regulatory changes shall take into account effects on both short-term and long-term forward and futures markets and products;
market participants shall have a right to obtain access to the transmission networks and distribution networks on objective, transparent and non-discriminatory terms.
Textual Amendments
F1Words in Art. 3 substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 3(2)
F2Word in Art. 3(e) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 3(3)
F3Art. 3(h)(i) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 3(4)
F4Word in Art. 3(j) substituted (E.W.S.) (27.2.2025) by The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) Regulations 2025 (S.I. 2025/82), reg. 1(2), Sch. 13 para. 15(2)(a)
F5Word in Art. 3(o) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 3(6)
F6Words in Art. 3(p) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 3(7)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F7Art. 4 omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 4
1.All market participants shall be responsible for the imbalances they cause in the system (‘balance responsibility’). To that end, market participants shall either be balance responsible parties or shall contractually delegate their responsibility to a balance responsible party of their choice. Each balance responsible party shall be financially responsible for its imbalances and shall strive to be balanced or shall help the electricity system to be balanced.
2.[F8The Secretary of State] may provide derogations from balance responsibility only for:
(a)demonstration projects for innovative technologies, subject to approval by the regulatory authority, provided that those derogations are limited to the time and extent necessary for achieving the demonstration purposes;
(b)power-generating facilities using renewable energy sources with an installed electricity capacity of less than 400 kW;
(c)installations benefitting from support approved by the Commission [F9before IP completion day] under Union State aid rules pursuant to Articles 107, 108 and 109 TFEU [F10as those Articles had effect in EU law immediately before IP completion day], and commissioned before 4 July 2019.
[F8The Secretary of State] may F11... provide incentives to market participants which are fully or partly exempted from balancing responsibility to accept full balancing responsibility.
3.When [F12the Secretary of State] provides a derogation in accordance with paragraph 2, it shall ensure that the financial responsibility for imbalances is fulfilled by another market participant.
4.For power-generating facilities commissioned from 1 January 2026, point (b) of paragraph 2 shall apply only to generating installations using renewable energy sources with an installed electricity capacity of less than 200 kW.
Textual Amendments
F8Words in Art. 5(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 5(2)
F9Words in Art. 5(2)(c) inserted (31.12.2020) by The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(2)(a)(i) (with Sch. 3)
F10Words in Art. 5(2)(c) inserted (31.12.2020) by The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(2)(a)(ii) (with Sch. 3)
F11Words in Art. 5(2) omitted (31.12.2020) by virtue of The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(2)(b) (with Sch. 3)
F12Words in Art. 5(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 5(3)
1.Balancing markets, including prequalification processes, shall be organised in such a way as to:
(a)ensure effective non-discrimination between market participants taking account of the different technical needs of the electricity system and the different technical capabilities of generation sources, energy storage and demand response;
(b)ensure that services are defined in a transparent and technologically neutral manner and are procured in a transparent, market-based manner;
(c)ensure non-discriminatory access to all market participants, individually or through aggregation, including for electricity generated from variable renewable energy sources, demand response and energy storage;
(d)respect the need to accommodate the increasing share of variable generation, increased demand responsiveness and the advent of new technologies.
2.The price of balancing energy shall not be pre-determined in contracts for balancing capacity. Procurement processes shall be transparent F13..., while protecting the confidentiality of commercially sensitive information.
3.Balancing markets shall ensure operational security whilst allowing for maximum use and efficient allocation of cross-zonal capacity across timeframes F14....
4.The settlement of balancing energy for standard balancing products and specific balancing products shall be based on marginal pricing (pay-as-cleared) unless [F15the regulatory authority approves] an alternative pricing method on the basis of a joint proposal by all transmission system operators following an analysis demonstrating that that alternative pricing method is more efficient.
Market participants shall be allowed to bid as close to real time as possible, and balancing energy gate closure times shall not be before the intraday cross-zonal gate closure time.
F16...
5.The imbalances shall be settled at a price that reflects the real-time value of energy.
6.Each imbalance price area shall be equal to a bidding zone, except in the case of a central dispatching model where an imbalance price area may constitute a part of a bidding zone.
7.The dimensioning of reserve capacity shall be performed by the transmission system operators F17....
8.The procurement of balancing capacity shall be performed by the transmission system operator and may be facilitated at a regional level. Reservation of cross-border capacity to that end may be limited. The procurement of balancing capacity shall be market-based and organised in such a way as to be non-discriminatory between market participants in the prequalification process F18... whether market participants participate individually or through aggregation.
Procurement of balancing capacity shall be based on a primary market unless and to the extent that the regulatory authority has provided for a derogation to allow the use of other forms of market-based procurement on the grounds of a lack of competition in the market for balancing services. Derogations from the obligation to base the procurement of balancing capacity on use of primary markets shall be reviewed every three years.
9.The procurement of upward balancing capacity and downward balancing capacity shall be carried out separately, unless the regulatory authority approves a derogation from this principle on the basis that this would result in higher economic efficiency as demonstrated by an evaluation performed by the transmission system operator. Contracts for balancing capacity shall not be concluded more than one day before the provision of the balancing capacity and the contracting period shall be no longer than one day, unless and to the extent that the regulatory authority has approved the earlier contracting or longer contracting periods to ensure the security of supply or to improve economic efficiency.
Where a derogation is granted, for at least 40 % of the standard balancing products and a minimum of 30 % of all products used for balancing capacity, contracts for the balancing capacity shall be concluded for no more than one day before the provision of the balancing capacity and the contracting period shall be no longer than one day. The contracting of the remaining part of the balancing capacity shall be performed for a maximum of one month in advance of the provision of balancing capacity and shall have a maximum contractual period of one month.
10.At the request of the transmission system operator, the regulatory authority may decide to extend the contractual period of the remaining part of balancing capacity referred to in paragraph 9 to a maximum period of twelve months provided that such a decision is limited in time, and the positive effects in terms of lowering of costs for final customers exceed the negative impacts on the market. The request shall include:
(a)the specific period during which the exemption would apply;
(b)the specific volume of balancing capacity to which the exemption would apply;
(c)an analysis of the impact of the exemption on the participation of balancing resources; and
(d)a justification for the exemption demonstrating that such an exemption would lead to lower costs to final customers.
11.Notwithstanding paragraph 10, from 1 January 2026 contract periods shall not be longer than six months.
12.By 1 January 2028, [F19the transmission system operator] shall report to the [F20regulatory authority] on the share of the total capacity covered by contracts with a duration or a procurement period of longer than one day.
13.Transmission system operators or their delegated operators shall publish, as close to real time as possible but with a delay after delivery of no more than 30 minutes, the current system balance of their scheduling areas, the estimated imbalance prices and the estimated balancing energy prices.
14.Transmission system operators may, where standard balancing products are not sufficient to ensure operational security or where some balancing resources cannot participate in the balancing market through standard balancing products, propose, and the regulatory [F21authority] may approve, derogations from paragraphs 2 and 4 for specific balancing products which are activated locally without exchanging them with other transmission system operators.
Proposals for derogations shall include a description of measures proposed to minimise the use of specific products, subject to economic efficiency, a demonstration that the specific products do not create significant inefficiencies and distortions in the balancing market either inside or outside the scheduling area, as well as, where applicable, the rules and information for the process for converting the balancing energy bids from specific balancing products into balancing energy bids from standard balancing products.
Textual Amendments
F13Words in Art. 6(2) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(2)
F14Words in Art. 6(3) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(3)
F15Words in Art. 6(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(4)(a)
F16Words in Art. 6(4) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(4)(b)
F17Words in Art. 6(7) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(5)
F18Words in Art. 6(8) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(6)
F19Words in Art. 6(12) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(7)(a)
F20Words in Art. 6(12) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(7)(b)
F21Word in Art. 6(14) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 6(8)
[F221.Transmission system operators must organise the management of the day-ahead and intraday markets. Transmission system operators must cooperate, so far as possible, at a regional level in order to maximise the efficiency and effectiveness of electricity day-ahead and intraday trading. The obligation to cooperate is without prejudice to the application of competition law. In their functions relating to electricity trading, transmission system operators are to be subject to regulatory oversight by the regulatory authority.]
2.Day-ahead and intraday markets shall:
(a)be organised in such a way as to be non-discriminatory;
(b)maximise the ability of all market participants to manage imbalances;
F23(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(d)provide prices that reflect market fundamentals, including the real time value of energy, on which market participants are able to rely when agreeing on longer-term hedging products;
(e)ensure operational security while allowing for maximum use of transmission capacity;
(f)be transparent while at the same time protecting the confidentiality of commercially sensitive information and ensuring trading occurs in an anonymous manner; [F24and]
F25(g). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(h)be organised in such a way as to ensure that all markets participants are able to access the market individually or through aggregation.
Textual Amendments
F22Art. 7(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 7(2)
F23Art. 7(2)(c) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 7(3)(a)
F24Word in Art. 7(2)(f) inserted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 7(3)(b)
F25Art. 7(2)(g) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 7(3)(c)
F261.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F262.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F263.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.By 1 January 2021, the imbalance settlement period shall be 15 minutes in all scheduling areas, unless [F27the regulatory authority has] granted a derogation or an exemption. Derogations may be granted only until 31 December 2024.
From 1 January 2025, the imbalance settlement period shall not exceed 30 minutes where an exemption has been granted by all the regulatory authorities within a synchronous area.
Textual Amendments
F26Art. 8(1)-(3) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 8(2)
F27Words in Art. 8(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 8(3)
1.F28... Transmission system operators shall issue long-term transmission rights or have equivalent measures in place to allow for market participants, including owners of power-generating facilities using renewable energy sources, to hedge price risks across bidding zone borders, unless an assessment of the forward market on the bidding zone borders performed by the [F29regulatory authority] shows that there are sufficient hedging opportunities in the concerned bidding zones.
2.Long-term transmission rights shall be allocated in a transparent, market based and non-discriminatory manner through [F30an] allocation platform.
3.Subject to compliance with F31... competition law, market operators shall be free to develop forward hedging products, including long-term forward hedging products, to provide market participants, including owners of power-generating facilities using renewable energy sources, with appropriate possibilities for hedging financial risks against price fluctuations. [F32The regulatory authority] shall not require that such hedging activity be limited to trades within a F33... bidding zone.
Textual Amendments
F28Words in Art. 9(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 9(2)(a)
F29Words in Art. 9(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 9(2)(b)
F30Word in Art. 9(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 9(3)
F31Word in Art. 9(3) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 9(4)(a)
F32Words in Art. 9(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 9(4)(b)(i)
F33Words in Art. 9(3) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 9(4)(b)(ii)
1.There shall be neither a maximum nor a minimum limit to the wholesale electricity price. This provision shall apply, inter alia, to bidding and clearing in all timeframes and shall include balancing energy and imbalance prices F34....
F352.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.Transmission system operators shall not take any measures for the purpose of changing wholesale prices.
4.[F36The regulatory authority] shall identify policies and measures applied within their territory that could contribute to indirectly restricting wholesale price formation, including limiting bids relating to the activation of balancing energy, capacity mechanisms, measures by the transmission system operators, measures intended to challenge market outcomes, or to prevent the abuse of dominant positions or inefficiently defined bidding zones.
5.Where [F37the regulatory authority] has identified a policy or measure which could serve to restrict wholesale price formation it shall take all appropriate actions to eliminate or, if not possible, to mitigate the impact of that policy or measure on bidding behaviour. F38...
Textual Amendments
F34Words in Art. 10(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 10(2)
F35Art. 10(2) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 10(3)
F36Words in Art. 10(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 10(4)
F37Words in Art. 10(5) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 10(5)(a)
F38Words in Art. 10(5) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 10(5)(b)
[F391.Where required for the purpose of setting a reliability standard in accordance with Article 25, the relevant authority must determine a single estimate of the value of lost load for Great Britain. That estimate must be made publicly available. The relevant authority may determine different estimates per bidding zone if there is more than one bidding zone in Great Britain. Where a bidding zone consists of more than one control area, the relevant authority must determine a single estimate of the value of lost load for that bidding zone.]
2.[F40The relevant authority] shall update [F41its] estimate of the value of lost load at least every five years, or earlier where [F42it] [F43observes] a significant change.
[F443.In this Article, “relevant authority” means the Secretary of State or the regulatory authority.]
Textual Amendments
F39Art. 11(1) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 11(2)
F40Words in Art. 11(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 11(3)(a)
F41Word in Art. 11(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 11(3)(b)
F42Word in Art. 11(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 11(3)(c)
F43Word in Art. 11(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 11(3)(d)
1.The dispatching of power-generating facilities and demand response shall be non-discriminatory, transparent and, unless otherwise provided under paragraphs 2 to 6, market based.
2.F45... [F46the regulatory authority] shall ensure that when dispatching electricity generating installations, system operators shall give priority to generating installations using renewable energy sources to the extent permitted by the secure operation of the national electricity system, based on transparent and non-discriminatory criteria and where such power-generating facilities are either:
(a)power-generating facilities that use renewable energy sources and have an installed electricity capacity of less than 400 kW; or
(b)demonstration projects for innovative technologies, subject to approval by the regulatory authority, provided that such priority is limited to the time and extent necessary for achieving the demonstration purposes.
3.[F47The regulatory authority] may decide not to apply priority dispatch to power-generating facilities as referred to in point (a) of paragraph 2 with a start of operation at least six months after that decision, or to apply a lower minimum capacity than that set out under point (a) of paragraph 2, provided that:
(a)it has well-functioning intraday and other wholesale and balancing markets and that those markets are fully accessible to all market participants in accordance with this Regulation;
(b)redispatching rules and congestion management are transparent to all market participants;
F48(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F48(d). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
F48(e). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Any derogation shall avoid retroactive changes that affect generating installations already benefiting from priority dispatch, notwithstanding any agreement between [F49the regulatory authority] and the operator of a generating installation on a voluntary basis.
F50... [F51the regulatory authority] may provide incentives to installations eligible for priority dispatch to voluntarily give up priority dispatch.
4.F52... [F53the regulatory authority] may provide for priority dispatch for electricity generated in power-generating facilities using high-efficiency cogeneration with an installed electricity capacity of less than 400 kW.
5.For power-generating facilities commissioned as from 1 January 2026, point (a) of paragraph 2 shall apply only to power-generating facilities that use renewable energy sources and have an installed electricity capacity of less than 200 kW.
6.Without prejudice to contracts concluded before 4 July 2019, power-generating facilities that use renewable energy sources or high-efficiency cogeneration and were commissioned before 4 July 2019 and, when commissioned, were subject to priority dispatch under Article 15(5) of Directive 2012/27/EU or Article 16(2) of Directive 2009/28/EC of the European Parliament and of the Council(1) shall continue to benefit from priority dispatch. Priority dispatch shall no longer apply to such power-generating facilities from the date on which the power-generating facility becomes subject to significant modifications, which shall be deemed to be the case at least where a new connection agreement is required or where the generation capacity of the power-generating facility is increased.
7.Priority dispatch shall not endanger the secure operation of the electricity system F54....
Textual Amendments
F45Words in Art. 12(2) omitted (31.12.2020) by virtue of The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(3)(a) (with Sch. 3)
F46Words in Art. 12(2) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(2)
F47Words in Art. 12(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(3)(a)
F48Art. 12(3)(c)-(e) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(3)(b)
F49Words in Art. 12(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(3)(c)
F50Words in Art. 12(3) omitted (31.12.2020) by virtue of The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(3)(b) (with Sch. 3)
F51Words in Art. 12(3) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(3)(d)
F52Words in Art. 12(4) omitted (31.12.2020) by virtue of The State Aid (Revocations and Amendments) (EU Exit) Regulations 2020 (S.I. 2020/1470), reg. 1(2), Sch. 1 para. 10(3)(c) (with Sch. 3)
F53Words in Art. 12(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(4)
F54Words in Art. 12(7) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 12(5)
1.The redispatching of generation and redispatching of demand response shall be based on objective, transparent and non-discriminatory criteria. It shall be open to all generation technologies, all energy storage and all demand response F55....
2.The resources that are redispatched shall be selected from among generating facilities, energy storage or demand response using market-based mechanisms and shall be financially compensated. Balancing energy bids used for redispatching shall not set the balancing energy price.
3.Non-market-based redispatching of generation, energy storage and demand response may only be used where:
(a)no market-based alternative is available;
(b)all available market-based resources have been used; [F56or]
(c)the number of available power generating, energy storage or demand response facilities is too low to ensure effective competition in the area where suitable facilities for the provision of the service are located F57...
F58(d). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.The transmission system operators and distribution system operators shall report at least annually to the [F59regulatory authority], on:
(a)the level of development and effectiveness of market-based redispatching mechanisms for power generating, energy storage and demand response facilities;
(b)the reasons, volumes in MWh and type of generation source subject to redispatching;
(c)the measures taken to reduce the need for the downward redispatching of generating installations using renewable energy sources or high-efficiency cogeneration in the future including investments in digitalisation of the grid infrastructure and in services that increase flexibility.
F60...
5.Subject to requirements relating to the maintenance of the reliability and safety of the grid, based on transparent and non-discriminatory criteria established by the regulatory [F61authority], transmission system operators and distribution system operators shall:
(a)guarantee the capability of transmission networks and distribution networks to transmit electricity produced from renewable energy sources or high-efficiency cogeneration with minimum possible redispatching, which shall not prevent network planning from taking into account limited redispatching where the transmission system operator or distribution system operator is able to demonstrate in a transparent way that doing so is more economically efficient and does not exceed 5 % of the annual generated electricity in installations which use renewable energy sources and which are directly connected to their respective grid, unless otherwise provided by [F62the regulatory authority] in which electricity from power-generating facilities using renewable energy sources or high-efficiency cogeneration represents more than 50 % of the annual gross final consumption of electricity;
(b)take appropriate grid-related and market-related operational measures in order to minimise the downward redispatching of electricity produced from renewable energy sources or from high-efficiency cogeneration;
(c)ensure that their networks are sufficiently flexible so that they are able to manage them.
6.Where non-market-based downward redispatching is used, the following principles shall apply:
(a)power-generating facilities using renewable energy sources shall only be subject to downward redispatching if no other alternative exists or if other solutions would result in significantly disproportionate costs or severe risks to network security;
(b)electricity generated in a high-efficiency cogeneration process shall only be subject to downward redispatching if, other than downward redispatching of power-generating facilities using renewable energy sources, no other alternative exists or if other solutions would result in disproportionate costs or severe risks to network security;
(c)self-generated electricity from generating installations using renewable energy sources or high-efficiency cogeneration which is not fed into the transmission or distribution network shall not be subject to downward redispatching unless no other solution would resolve network security issues;
(d)downward redispatching under points (a), (b) and (c)shall be duly and transparently justified. The justification shall be included in the report under [F63paragraph 4].
7.Where non-market based redispatching is used, it shall be subject to financial compensation by the system operator requesting the redispatching to the operator of the redispatched generation, energy storage or demand response facility except in the case of producers that have accepted a connection agreement under which there is no guarantee of firm delivery of energy. Such financial compensation shall be at least equal to the higher of the following elements or a combination of both if applying only the higher would lead to an unjustifiably low or an unjustifiably high compensation:
(a)additional operating cost caused by the redispatching, such as additional fuel costs in the case of upward redispatching, or backup heat provision in the case of downward redispatching of power-generating facilities using high-efficiency cogeneration;
(b)net revenues from the sale of electricity on the day-ahead market that the power-generating, energy storage or demand response facility would have generated without the redispatching request; where financial support is granted to power-generating, energy storage or demand response facilities based on the electricity volume generated or consumed, financial support that would have been received without the redispatching request shall be deemed to be part of the net revenues.
Textual Amendments
F55Words in Art. 13(1) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(2)
F56Word in Art. 13(3)(b) inserted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(3)(a)
F57Word in Art. 13(3)(c) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(3)(b)
F58Art. 13(3)(d) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(3)(c)
F59Words in Art. 13(4) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(4)(a)
F60Words in Art. 13(4) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(4)(b)
F61Word in Art. 13(5) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(5)(a)
F62Words in Art. 13(5)(a) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(5)(b)
F63Words in Art. 13(6)(d) substituted (E.W.S.) (31.12.2020) by The Electricity and Gas (Internal Markets and Network Codes) (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/1006), reg. 1(2), Sch. 4 para. 13(6)
Directive 2009/28/EC of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources and amending and subsequently repealing Directives 2001/77/EC and 2003/30/EC (OJ L 140, 5.6.2009, p. 16).
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.
The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.
For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: