Search Legislation

Directive 2014/32/EU of the European Parliament and of the CouncilShow full title

Directive 2014/32/EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of measuring instruments (recast) (Text with EEA relevance)

 Help about what version

What Version

 Help about advanced features

Advanced Features

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Status:

EU Directives are being published on this site to aid cross referencing from UK legislation. After IP completion day (31 December 2020 11pm) no further amendments will be applied to this version.

SPECIFIC REQUIREMENTSU.K.

1. Accuracy U.K.

The manufacturer shall specify the class index of the meter. The class indices are defined as: Class A, B and C.

2. Rated operating conditions U.K.

The manufacturer shall specify the rated operating conditions of the meter; in particular:

The values of fn, Un, In, Ist, Imin, Itr and Imax that apply to the meter. For the current values specified, the meter shall satisfy the conditions given in Table 1;

Table 1
a

For Class B electromechanical meters shall apply.

Class AClass BClass C
For direct-connected meters
Ist
Imin
Imax
For transformer-operated meters
Ist
Imin a
In
Imax

The voltage, frequency and power factor ranges within which the meter shall satisfy the MPE requirements are specified in Table 2. These ranges shall recognise the typical characteristics of electricity supplied by public distribution systems.

The voltage and frequency ranges shall be at least:

power factor range at least from cosφ = 0,5 inductive to cosφ = 0,8 capacitive.

3. MPEs U.K.

The effects of the various measurands and influence quantities (a, b, c,…) are evaluated separately, all other measurands and influence quantities being kept relatively constant at their reference values. The error of measurement, that shall not exceed the MPE stated in Table 2, is calculated as:

When the meter is operating under varying-load current, the percentage errors shall not exceed the limits given in Table 2.

Table 2
MPEs in percent at rated operating conditions and defined load current levels and operating temperature
Operating temperaturesOperating temperaturesOperating temperaturesOperating temperatures
+ 5 °C … + 30 °C– 10 °C … + 5 °Cor+ 30 °C … + 40 °C– 25 °C … – 10 °Cor+ 40 °C … + 55 °C– 40 °C … – 25 °Cor+ 55 °C … + 70 °C
Meter classABCABCABCABC
Single phase meter; polyphase meter if operating with balanced loads
3,52152,51,373,51,7942
3,520,74,52,5173,51,3941,5
Polyphase meter if operating with single phase load
, see exception below42,51531,3741,794,52
For electromechanical polyphase meters the current range for single-phase load is limited to

When a meter operates in different temperature ranges the relevant MPE values shall apply.

The meter shall not exploit the MPEs or systematically favour any party.

4. Permissible effect of disturbances U.K.

4.1. General U.K.

As electrical energy meters are directly connected to the mains supply and as mains current is also one of the measurands, a special electromagnetic environment is used for electricity meters.

The meter shall comply with the electromagnetic environment E2 and the additional requirements in points 4.2 and 4.3.

The electromagnetic environment and permissible effects reflect the situation that there are disturbances of long duration which shall not affect the accuracy beyond the critical change values and transient disturbances, which may cause a temporary degradation or loss of function or performance but from which the meter shall recover and shall not affect the accuracy beyond the critical change values.

When there is a foreseeable high risk due to lightning or where overhead supply networks are predominant, the metrological characteristics of the meter shall be protected.

4.2. Effect of disturbances of long duration U.K.
Table 3
a

In the case of electromechanical electricity meters, no critical change values are defined for harmonic contents in the current circuits and for DC and harmonics in the current circuit.

Critical change values for disturbances of long duration
DisturbanceCritical change values in percent for meters of class
ABC
Reversed phase sequence1,51,50,3
Voltage unbalance (only applicable to polyphase meters)421
Harmonic contents in the current circuitsa10,80,5
DC and harmonics in the current circuita631,5
Fast transient bursts642
Magnetic fields; HF (radiated RF) electromagnetic field; Conducted disturbances introduced by radio-frequency fields; and Oscillatory waves immunity321
4.3. Permissible effect of transient electromagnetic phenomena U.K.
4.3.1.The effect of an electromagnetic disturbance on an electrical energy meter shall be such that during and immediately after a disturbance:U.K.
  • any output intended for testing the accuracy of the meter does not produce pulses or signals corresponding to an energy of more than the critical change value,

and in reasonable time after the disturbance the meter shall:

  • recover to operate within the MPE limits, and

  • have all measurement functions safeguarded, and

  • allow recovery of all measurement data present prior to the disturbance, and

  • not indicate a change in the registered energy of more than the critical change value.

The critical change value in kWh is

(m being the number of measuring elements of the meter, Un in Volts and Imax in Amps).

4.3.2.For overcurrent the critical change value is 1,5 %.U.K.

5. Suitability U.K.

5.1.Below the rated operating voltage the positive error of the meter shall not exceed 10 %.U.K.
5.2.The display of the total energy shall have a sufficient number of digits to ensure that when the meter is operated for 4 000 hours at full load (I = Imax, U = Un and PF = 1) the indication does not return to its initial value and shall not be able to be reset during use.U.K.
5.3.In the event of loss of electricity in the circuit, the amounts of electrical energy measured shall remain available for reading during a period of at least 4 months.U.K.
5.4. Running with no load U.K.

When the voltage is applied with no current flowing in the current circuit (current circuit shall be open circuit), the meter shall not register energy at any voltage between and 1,1 Un.

5.5. Starting U.K.

The meter shall start and continue to register at Un, PF = 1 (polyphase meter with balanced loads) and a current which is equal to Ist.

6. Units U.K.

The electrical energy measured shall be displayed in kilowatt-hours or in megawatt-hours.

7. Putting into use U.K.

(a)Where a Member State imposes measurement of residential use, it shall allow such measurement to be performed by means of any Class A meter. For specified purposes the Member State is authorised to require any Class B meter.U.K.
(b)Where a Member State imposes measurement of commercial and/or light industrial use, it shall allow such measurement to be performed by any Class B meter. For specified purposes the Member State is authorised to require any Class C meter.U.K.
(c)The Member State shall ensure that the current range be determined by the utility or the person legally designated for installing the meter, so that the meter is appropriate for the accurate measurement of consumption that is foreseen or foreseeable.U.K.

Back to top

Options/Help

Print Options

You have chosen to open the Whole Directive

The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources