Search Legislation

Infrastructure (Wales) Act 2024

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Section 12

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the Infrastructure (Wales) Act 2024, Section 12. Help about Changes to Legislation

12Dams and reservoirsE+W

This section has no associated Explanatory Notes

The following kinds of development are significant infrastructure projects—

(a)the construction of a dam or reservoir in Wales if the volume of water to be held back by the dam or stored in the reservoir is expected to exceed 10 million cubic metres;

(b)the alteration of a dam or reservoir in Wales if the additional volume of water to be held back by the dam or stored in the reservoir as a result of the alteration is expected to exceed 10 million cubic metres.

Commencement Information

I1S. 12 in force at 4.6.2024, see s. 147(1)(a)

Back to top

Options/Help

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?