Section 3 – Liquified natural gas facilities
10.Section 3 states the circumstances in which development related to liquified natural gas facilities will be a Significant Infrastructure Project. These are:
for the construction of a facility in Wales or the Welsh marine area, the storage capacity is expected to be at least 43 million standard cubic metres or have a maximum flow rate of at least 4.5 million standard cubic metres per day;
for the alteration of a facility in Wales or the Welsh marine area, the existing storage capacity is expected to increase by at least 43 million standard cubic metres or by a maximum flow rate of at least 4.5 million standard cubic metres more per day.