Chwilio Deddfwriaeth

Land Drainage Act 1991

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (Fel y'i Deddfwyd)
 Help about advanced features

Nodweddion Uwch

Changes to legislation:

Land Drainage Act 1991, Section 14A is up to date with all changes known to be in force on or before 17 May 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

Whole provisions yet to be inserted into this Act (including any effects on those provisions):

[F114AGeneral powers: flood risk management worksE+W

(1)A lead local flood authority may carry out flood risk management work if Conditions 1 and 2 are satisfied.

(2)An authority listed in subsection (3) may carry out flood risk management work if—

(a)Conditions 1 and 3 are satisfied, or

(b)Conditions 1 and 4 are satisfied.

(3)The authorities are—

(a)an internal drainage board,

(b)a district council, and

(c)a lead local flood authority for an area for which there is no district council.

(4)Condition 1 is that the authority considers the work desirable having regard to the local flood risk management strategy for its area under section 9 or 10 of the Flood and Water Management Act 2010.

(5)Condition 2 is that the purpose of the work is to manage a flood risk in the authority's area from—

(a)surface runoff, or

(b)groundwater.

(6)Condition 3 is that the purpose of the work is to manage a flood risk in the authority's area from an ordinary watercourse.

(7)In subsection (6) the reference to an ordinary watercourse includes a reference to a lake, pond or other area of water which flows into an ordinary watercourse.

(8)Condition 4 is that the purpose of the work is to manage a flood risk in the authority's area from the sea and either—

(a)the work is within subsection (9)(a), (b) or (f), or

(b)the [F2appropriate agency] has consented to the work.

(9) In this section “ flood risk management work ” means anything done—

(a)to maintain existing works (including buildings and structures) including cleansing, repairing or otherwise maintaining the efficiency of an existing watercourse or drainage work;

(b)to operate existing works (such as sluicegates or pumps);

(c)to improve existing works (including buildings or structures) including anything done to deepen, widen, straighten or otherwise improve an existing watercourse, to remove or alter mill dams, weirs or other obstructions to watercourses, or to raise, widen or otherwise improve a drainage work;

(d)to construct or repair new works (including buildings, structures, watercourses, drainage works and machinery);

(e)for the purpose of maintaining or restoring natural processes;

(f)to monitor, investigate or survey a location or a natural process;

(g)to reduce or increase the level of water in a place;

(h)to alter or remove works.

(10)Nothing in this section authorises a person to enter land except for the purpose of maintaining existing works.

(11)Section 14(5) and (6) applies in relation to the exercise by any authority of powers under this section as to the exercise of powers under section 14.

(12)The powers under section 62 and 64 are available to an authority for a purpose in connection with the exercise of powers under this section.

(13)In this section the following terms have the meaning given by Part 1 of the Flood and Water Management Act 2010—

(a)flood risk,

(b)lead local flood authority,

(c)surface runoff, and

(d)groundwater.]

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill