Chwilio Deddfwriaeth

Highways Act 1980

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Status:

Point in time view as at 01/11/1991. This version of this provision has been superseded. Help about Status

Close

Status

You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.

Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.

Changes to legislation:

Highways Act 1980, Section 105A is up to date with all changes known to be in force on or before 01 May 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

105A Environmental assessment of certain highway projects.E+W

(1)In any case where the Secretary of State has under consideration the construction of a new highway or the improvement of an existing highway, he shall determine before the date of publication of details of the project whether or not it falls within Annex I or Annex II to Council Directive No. 85/337/EEC on the assessment of the effects of certain public and private projects on the environment.

(2)If he determines that it falls within Annex I, or that it falls within Annex II and has such characteristics that it should be made subject to an environmental assessment in accordance with the Directive, he shall publish not later than the date of publication of details of the project an environmental statement, that is, a statement containing the information referred to an Annex III to the Directive to the extent that he considers—

(a)that it is relevant to the specific characteristics of the project and of the environmental features likely to be affected by it; and

(b)that (having regard in particular to current knowledge and methods of assessment) the information may reasonably be gathered,

including at least—

(i)a description of the project comprising information on the site, design and size of the project;

(ii)a description of the measures envisaged in order to avoid, reduce and, if possible, remedy significant adverse effects;

(iii)the data required to identify and assess the main effects which the project is likely to have on the environment:

(iv)a non-technical summary of the information mentioned in paragraphs (i) to (iii) above.

[F1(2A)Any project for the construction or improvement of a special road which falls within Annex II to the Directive shall be treated as having such characteristics that it should be made subject to an environmental assessment in accordance with the Directive.]

(3)If the Secretary of State publishes an environmental statement, he shall ensure that the public concerned is given an opportunity to express an opinion before the project is initiated.

(4)If on completion of the project any part of the highway would lie on, or within 100 metres of, land comprised—

(a)in a National Park or nature reserve within the meaning of the National Parks and Access to the Countryside Act M11949;

(b)in a conservation area within the meaning of [F2the Planning (Listed Buildings and Conservation Areas) Act M21990], or

(c)in an area notified under section 28 of the Wildlife and Countryside Act M31981 as an area of special scientific interest or in relation to which the Secretary of State has made an order under section 29 of that Act,

he shall ensure that the appropriate environmental body is given an opportunity to express an opinion before the project is initiated.

(5)the Secretary of State—

(a)shall consider—

(i)the environmental statement;

(ii)any opinion expressed by a member of the public; and

(iii)if the statement relates to land such as is mentioned in subsection (4) above, any opinion expressed by the appropriate environmental body; and

(b)shall publish his decision as to whether or not to initiate the project.

(6)In this section “the appropriate environmental body” means—

(a)the Countryside Commission, if the proposal relates to land [F3in England] falling within paragraph (a) of subsection (4) above [F3or the Countryside Council for Wales, if it relates to land in Wales falling within that paragraph of that subsection];

(b)the local planning authority, if it relates to land falling within paragraph (b); and

[F4(c)the Nature Conservancy Council for England or the Countryside Council for Wales, if it relates to land in England or, as the case may be, in Wales, falling within paragraph (c).]

(7)This section does not apply—

(a)where a draft order or scheme relating to construction or a draft order relating to improvement is published before the coming into force of the Highway (Assessment of Environmental Effects) Regulation 1988; or

(b)where the Secretary of State has under consideration before that date construction or improvement without an order.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan

Y Ddeddf Gyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open y Ddeddf Gyfan heb Atodlenni

Y Ddeddf Gyfan heb Atodlenni you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill