Chwilio Deddfwriaeth

Directive 2014/32/EU of the European Parliament and of the CouncilDangos y teitl llawn

Directive 2014/32/EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the Member States relating to the making available on the market of measuring instruments (recast) (Text with EEA relevance)

 Help about advanced features

Nodweddion Uwch

 Help about UK-EU Regulation

Legislation originating from the EU

When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.

Close

Mae hon yn eitem o ddeddfwriaeth sy’n deillio o’r UE

Mae unrhyw newidiadau sydd wedi cael eu gwneud yn barod gan y tîm yn ymddangos yn y cynnwys a chyfeirir atynt gydag anodiadau.Ar ôl y diwrnod ymadael bydd tair fersiwn o’r ddeddfwriaeth yma i’w gwirio at ddibenion gwahanol. Y fersiwn legislation.gov.uk yw’r fersiwn sy’n weithredol yn y Deyrnas Unedig. Y Fersiwn UE sydd ar EUR-lex ar hyn o bryd yw’r fersiwn sy’n weithredol yn yr UE h.y. efallai y bydd arnoch angen y fersiwn hon os byddwch yn gweithredu busnes yn yr UE. EUR-Lex Y fersiwn yn yr archif ar y we yw’r fersiwn swyddogol o’r ddeddfwriaeth fel yr oedd ar y diwrnod ymadael cyn cael ei chyhoeddi ar legislation.gov.uk ac unrhyw newidiadau ac effeithiau a weithredwyd yn y Deyrnas Unedig wedyn. Mae’r archif ar y we hefyd yn cynnwys cyfraith achos a ffurfiau mewn ieithoedd eraill o EUR-Lex. The EU Exit Web Archive legislation_originated_from_EU_p3

Changes over time for: ANNEX IV

 Help about opening options

Version Superseded: 27/01/2015

Status:

EU Directives are published on this site to aid cross referencing from UK legislation. Since IP completion day (31 December 2020 11.00 p.m.) no amendments have been applied to this version.

ANNEX IVU.K.

GAS METERS AND VOLUME CONVERSION DEVICES (MI-002)U.K.

The relevant requirements of Annex I, the specific requirements of this Annex and the conformity assessment procedures listed in this Annex, apply to gas meters and volume conversion devices defined below, intended for residential, commercial and light industrial use.

DEFINITIONSU.K.

Gas meterAn instrument designed to measure, memorise and display the quantity of fuel gas (volume or mass) that has passed it.
Conversion deviceA device fitted to a gas meter that automatically converts the quantity measured at metering conditions into a quantity at base conditions.
Minimum flowrate (Qmin)The lowest flowrate at which the gas meter provides indications that satisfy the requirements regarding maximum permissible error (MPE).
Maximum flowrate (Qmax)The highest flowrate at which the gas meter provides indications that satisfy the requirements regarding MPE.
Transitional flowrate (Qt)The transitional flowrate is the flowrate occurring between the maximum and minimum flowrates at which the flowrate range is divided into two zones, the ‘upper zone’ and the ‘lower zone’. Each zone has a characteristic MPE.
Overload Flowrate (Qr)The overload flowrate is the highest flowrate at which the meter operates for a short period of time without deteriorating.
Base conditionsThe specified conditions to which the measured quantity of fluid is converted.

PART IU.K.SPECIFIC REQUIREMENTSGAS METERS

1. Rated operating conditions U.K.

The manufacturer shall specify the rated operating conditions of the gas meter, taking into account:

1.1.The flowrate range of the gas shall fulfil at least the following conditions:U.K.

ClassQmax/QminQmax/QtQr/Qmax
1,5≥ 150≥ 101,2
1,0≥ 20≥ 51,2

1.2.The temperature range of the gas, with a minimum range of 40 °C.U.K.

1.3. The fuel/gas related conditions U.K.

The gas meter shall be designed for the range of gases and supply pressures of the country of destination. In particular the manufacturer shall indicate:

  • the gas family or group;

  • the maximum operating pressure.

1.4.A minimum temperature range of 50 °C for the climatic environment.U.K.

1.5.The nominal value of the AC voltage supply and/or the limits of DC supply.U.K.

2. Maximum permissible error (MPEs) U.K.

2.1.Gas meter indicating the volume at metering conditions or massU.K.

Table 1
Class1,51,0
Qmin ≤ Q < Qt3 %2 %
Qt ≤ Q ≤ Qmax1,5 %1 %

The gas meter shall not exploit the MPEs or systematically favour any party.

2.2.For a gas meter with temperature conversion, which only indicates the converted volume, the MPE of the meter is increased by 0,5 % in a range of 30 °C extending symmetrically around the temperature specified by the manufacturer that lies between 15 °C and 25 °C. Outside this range, an additional increase of 0,5 % is permitted in each interval of 10 °C.U.K.

3. Permissible effect of disturbances U.K.

3.1. Electromagnetic immunity U.K.

3.1.1.The effect of an electromagnetic disturbance on a gas meter or volume conversion device shall be such that:U.K.
  • the change in the measurement result is no greater than the critical change value as defined in point 3.1.3, or

  • the indication of the measurement result is such that it cannot be interpreted as a valid result, such as a momentary variation that cannot be interpreted, memorised or transmitted as a measuring result.

3.1.2.After undergoing a disturbance, the gas meter shall:U.K.
  • recover to operate within MPE, and

  • have all measurement functions safeguarded, and

  • allow recovery of all measurement data present just before the disturbance.

3.1.3.The critical change value is the smaller of the two following values:U.K.
  • the quantity corresponding to half of the magnitude of the MPE in the upper zone on the measured volume;

  • the quantity corresponding to the MPE on the quantity corresponding to one minute at maximum flowrate.

3.2. Effect of upstream-downstream flow disturbances U.K.

Under installation conditions specified by the manufacturer, the effect of the flow disturbances shall not exceed one third of the MPE.

4. Durability U.K.

After an appropriate test, taking into account the period of time estimated by the manufacturer, has been performed, the following criteria shall be satisfied:

4.1. Class 1,5 $3 U.K.

4.1.1.The variation of the measurement result after the durability test when compared with the initial measurement result for the flow rates in the range Qt to Qmax- shall not exceed the measurement result by more than 2 %.U.K.
4.1.2.The error of indication after the durability test shall not exceed twice the MPE in point 2.U.K.

4.2. Class 1,0 $3 U.K.

4.2.1.The variation of the measurement result after the durability test when compared with the initial measurement result shall not exceed one-third of the MPE in point 2.U.K.
4.2.2.The error of indication after the durability test shall not exceed the MPE in point 2.U.K.

5. Suitability U.K.

5.1.A gas meter powered from the mains (AC or DC) shall be provided with an emergency power supply device or other means to ensure, during a failure of the principal power source, that all measuring functions are safeguarded.U.K.

5.2.A dedicated power source shall have a lifetime of at least five years. After 90 % of its lifetime an appropriate warning shall be shown.U.K.

5.3.An indicating device shall have a sufficient number of digits to ensure that the quantity passed during 8 000 hours at Qmax does not return the digits to their initial values.U.K.

5.4.The gas meter shall be able to be installed to operate in any position declared by the manufacturer in its installation instruction.U.K.

5.5.The gas meter shall have a test element, which shall enable tests to be carried out in a reasonable time.U.K.

5.6.The gas meter shall respect the MPE in any flow direction or only in one flow direction clearly marked.U.K.

6. Units U.K.

Metered quantity shall be displayed in cubic metre, or in kilogram.

PART IIU.K.SPECIFIC REQUIREMENTSVOLUME CONVERSION DEVICES

A volume conversion device constitutes a sub-assembly when it is together with a measuring instrument with which it is compatible.

For a volume conversion device, the essential requirements for the gas meter shall apply, if applicable. In addition, the following requirements shall apply:

7. Base conditions for converted quantities U.K.

The manufacturer shall specify the base conditions for converted quantities.

8. MPE U.K.

  • 0,5 % at ambient temperature 20 °C ± 3 °C, ambient humidity 60 % ± 15 %, nominal values for power supply;

  • 0,7 % for temperature conversion devices at rated operating conditions;

  • 1 % for other conversion devices at rated operating conditions.

Note:U.K.

The error of the gas meter is not taken into account.U.K.

The volume conversion device shall not exploit the MPEs or systematically favour any party.U.K.

9. Suitability U.K.

9.1.An electronic conversion device shall be capable of detecting when it is operating outside the operating range(s) stated by the manufacturer for parameters that are relevant for measurement accuracy. In such a case, the conversion device must stop integrating the converted quantity, and may totalise separately the converted quantity for the time it is operating outside the operating range(s).U.K.

9.2.An electronic conversion device shall be capable to display all relevant data for the measurement without additional equipment.U.K.

PART IIIU.K.PUTTING INTO USE AND CONFORMITY ASSESSMENT

Putting into useU.K.

10.

(a)

Where a Member State imposes measurement of residential use, it shall allow such measurement to be performed by means of any Class 1,5 $3, and by Class 1,0 $3 which have a Qmax/Qmin ratio equal or greater than 150.

(b)

Where a Member State imposes measurement of commercial and/or light industrial use, it shall allow such measurement to be performed by any Class 1,5 USD 3.

(c)

As regards the requirements under points 1.2 and 1.3, Member States shall ensure that the properties be determined by the utility or the person legally designated for installing the meter, so that the meter is appropriate for the accurate measurement of consumption that is foreseen or foreseeable.

CONFORMITY ASSESSMENTU.K.

The conformity assessment procedures referred to in Article 17 that the manufacturer can choose between are

B + F or B + D or H1.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open the Whole Directive

The Whole Directive you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i mabwysiadwyd gan yr UE): Mae'r wreiddiol version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Pwynt Penodol mewn Amser: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted version that was used for the EU Official Journal
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

Mae’r llinell amser yma yn dangos y fersiynau gwahanol a gymerwyd o EUR-Lex yn ogystal ag unrhyw fersiynau dilynol a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig.

Cymerir dyddiadau fersiynau’r UE o ddyddiadau’r dogfennau ar EUR-Lex ac efallai na fyddant yn cyfateb â’r adeg pan ddaeth y newidiadau i rym ar gyfer y ddogfen.

Ar gyfer unrhyw fersiynau a grëwyd ar ôl y diwrnod ymadael o ganlyniad i newidiadau a wnaed gan ddeddfwriaeth y Deyrnas Unedig, bydd y dyddiad yn cyd-fynd â’r dyddiad cynharaf y daeth y newid (e.e. ychwanegiad, diddymiad neu gyfnewidiad) a weithredwyd i rym. Am ragor o wybodaeth gweler ein canllaw i ddeddfwriaeth ddiwygiedig ar Ddeall Deddfwriaeth.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel adopted fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill