Chwilio Deddfwriaeth

Reservoirs (Scotland) Act 2011

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: Section 50

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the Reservoirs (Scotland) Act 2011, Section 50. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

50Supervising engineer and monitoring of reservoirS

This adran has no associated Nodiadau Esboniadol

(1)The supervising engineer must supervise the reservoir in accordance with this section.

(2)The supervising engineer must—

(a)give notice to the reservoir manager of anything that the engineer considers might affect the safety of the reservoir,

(b)monitor any matters specified in a safety report as matters to be monitored by the supervising engineer until a final certificate is issued in respect of the relevant works,

(c)monitor compliance by the reservoir manager with the requirements of any preliminary certificate for the time being applicable to the reservoir,

(d)monitor compliance by the reservoir manager with the requirements of any final certificate for the time being applicable to the reservoir,

(e)monitor any matters specified in any such final certificate as matters that should be monitored by the supervising engineer until the first inspection of the reservoir required under section 46,

(f)monitor compliance by the reservoir manager with the requirements of any direction given in the latest inspection report by virtue of section 47(3)(d)(i),

(g)give notice to the reservoir manager and SEPA of any failure to comply with any requirement of––

(i)a safety report referred to in paragraph (b),

(ii)a preliminary certificate referred to in paragraph (c),

(iii)a final certificate referred to in paragraph (d), or

(iv)a direction referred to in paragraph (f),

(h)monitor any matters specified in the latest inspection report as matters that should be monitored by the supervising engineer until the next inspection of the reservoir required under section 46,

(i)supervise (or ensure that a nominated representative of the engineer supervises) any proposed draw-down in respect of the reservoir,

(j)monitor compliance by the reservoir manager with the requirements of section 51.

(3)If the supervising engineer considers at any time that the reservoir should be inspected in accordance with section 47, the engineer must––

(a)give the reservoir manager a written recommendation to that effect specifying when the inspection should take place, and

(b)not later than 28 days after giving the written recommendation, give SEPA a copy of it.

(4)The supervising engineer may by written direction require the reservoir manager to carry out a visual inspection of the reservoir at intervals specified by the engineer for the purpose of identifying anything that might affect the safety of the reservoir.

(5)The reservoir manager must comply with any direction under subsection (4).

(6)The reservoir manager must––

(a)maintain a written record of each visual inspection carried out in pursuance of a direction under subsection (4),

(b)make that record available on request to the supervising engineer, and

(c)give notice to the supervising engineer of anything identified during such an inspection which might affect the safety of the reservoir.

(7)Notice under subsection (6)(c) must be given as soon as reasonably practicable after the inspection during which the thing was identified.

(8)The supervising engineer must give the reservoir manager, at least every 12 months, a written statement of—

(a)the steps taken by the engineer in relation to the matters referred to in subsection (2)(a) to (h),

(b)any measures taken by the reservoir manager in the interests of the safety of the reservoir or otherwise to maintain the reservoir,

(c)any failure to comply with—

(i)a requirement in a safety report referred to in subsection (2)(b),

(ii)a requirement in a preliminary certificate referred to in subsection (2)(c),

(iii)a requirement in a final certificate referred to in subsection (2)(d),

(iv)a direction referred to in subsection (2)(f),

(v)a recommendation by the supervising engineer under subsection (3),

(vi)a direction by the supervising engineer under subsection (4).

(9)The supervising engineer must give the reservoir manager information for the purpose of enabling the manager to contact the engineer (or in the event of an emergency and the supervising engineer being unavailable, a nominated representative of the engineer).

(10)The supervising engineer must, not later than 28 days after giving a written statement under subsection (8), give SEPA a copy of the statement.

(11)The Scottish Ministers may publish guidance about supervision of high-risk reservoirs and medium-risk reservoirs in accordance with this section.

(12)In this section—

(a)draw-down” means any intentional reduction in the water level except where done in accordance with the routine operation of the reservoir,

(b)references to “the supervising engineer” are references to the engineer appointed for the time being as such under section 49 in relation to the reservoir,

(c)references to “the reservoir manager” are references to the reservoir manager of the reservoir which is being supervised in accordance with this section.

Commencement Information

I1S. 50 in force at 1.4.2016 by S.S.I. 2016/42, art. 2, Sch. (with art. 3)

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Nodiadau Esboniadol

Text created by the Scottish Government to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Acts of the Scottish Parliament except those which result from Budget Bills.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill