RHAN 2Rheoliadau Adeiladu 2010
Rhan 6 (gofynion effeithlonrwydd ynni)7
1
Yn rheoliad 21 (cymhwyso gofynion effeithlonrwydd ynni), ym mharagraff (4)—
a
ar ddiwedd is-baragraff (a) hepgorer “or”;
b
ar ddiwedd is-baragraff (b) mewnosoder “to heat the conservatory or porch; or”;
c
ar ôl is-baragraff (b), mewnosoder—
c
in which a fixed heating appliance has been provided to heat the conservatory or porch.
2
Yn lle rheoliad 25 (y gofynion perfformiad ynni gofynnol ar gyfer adeiladau newydd) rhodder—
25
The Welsh Ministers shall approve minimum energy performance requirements for new buildings, in the form of target CO² emission rates, which shall be calculated and expressed in accordance with the methodology approved pursuant to regulation 24.
3
Ar ôl rheoliad 25B (gofynion bron yn ddi-ynni ar gyfer adeiladau newydd) mewnosoder—
New buildings: minimum energy performance requirements25C
Minimum energy performance requirements must be approved by the Welsh Ministers, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, for—
a
new buildings (other than new dwellings), in the form of target primary energy consumption rates; and
b
new dwellings, in the form of target fabric performance values.
4
Yn lle rheoliad 26A (cyfradd effeithlonrwydd ynni adeiladwaith) a’r pennawd uwchben rhodder—
Primary Energy comsumption rates for new buildings26A
Where a building (other than a dwelling) is erected, it must not exceed the target primary energy consumption rate for the building which has been approved pursuant to regulation 25C(a), applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24.
5
Ar ôl rheoliad 26A mewnosoder—
Fabric performance values for new dwellings26B
Where a dwelling is erected, it must not exceed the target fabric performance values for the dwelling which have been approved pursuant to regulation 25C(b), applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24.
6
Yn rheoliad 27A (cyfrifiadau cyfraddau effeithlonrwydd ynni adeiladwaith)—
a
yn lle’r pennawd rhodder “Primary energy consumption rate calculations”;
b
ym mharagraff (1) yn lle “dwelling” rhodder “building (other than a dwelling)”;
c
ym mharagraffau (2) a (3) yn lle “shall” ym mhob lle y mae’n digwydd rhodder “must”;
d
ym mharagraffau (2)(a) a (b) a (3)(a)(i) a (ii) yn lle “fabric efficiency rate for the dwelling” ym mhob lle y mae’n digwydd rhodder “primary energy consumption rate for the building”;
e
ym mharagraffau (2)(c) a (3)(a)(iii) yn lle “dwelling” ym mhob lle y mae’n digwydd rhodder “building”;
f
ym mharagraff (5) yn lle “fabric energy efficiency rate” rhodder “primary energy consumption rate”.
7
Ar ôl rheoliad 27A mewnosoder—
Fabric performance values calculations27B
1
This regulation applies where a dwelling is erected and regulation 26B applies.
2
Not later than the day before the work starts, the person carrying out the work must give the local authority a notice which specifies—
a
the target fabric performance values for the dwelling, calculated and expressed in accordance with the methodology approved pursuant to regulation 24;
b
the fabric performance values for the dwelling as designed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24; and
c
a list of specifications to which the dwelling is to be constructed.
3
Not later than five days after the work has been completed, the person carrying out the work must give the local authority—
a
a notice which specifies—
i
the target fabric performance values for the dwelling, calculated and expressed in accordance with the methodology approved pursuant to regulation 24;
ii
the fabric performance values for the dwelling as constructed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24; and
iii
whether the dwelling has been constructed in accordance with the list of specifications referred to in paragraph 2(c), and if not a list of any changes to those specifications; or
b
a certificate of the sort referred to in paragraph (4) accompanied by the information referred to in sub-paragraph (a).
4
A local authority is authorised to accept, as evidence that the requirements of regulation 26B have been satisfied, a certificate to that effect by an energy assessor who is accredited to produce energy performance certificates for that category of building.
5
In this regulation, “specifications” means specifications used for the calculation of the fabric performance values.
8
Yn lle rheoliad 28 (gwelliannau canlyniadol i berfformiad ynni) rhodder—
28
1
Paragraph (3) applies to an existing building with a total useful floor area over 1000m² where the proposed building work consists of or includes—
a
the initial provision of any fixed building services; or
b
an increase to the installed capacity of any fixed building services.
2
Paragraph (3) applies to an existing building where the proposed building work consists of or includes—
a
an extension; or
b
the extension of the building’s heating system or the provision of a fixed heating appliance, to heat a previously unheated space.
3
Subject to paragraph (4), where this paragraph applies, such work, if any, shall be carried out as is necessary to ensure that the building complies with the requirements of Part L of Schedule 1.
4
Nothing in paragraph (3) requires work to be carried out if it is not technically, functionally and economically feasible.
9
Yn rheoliad 34 (cymhwyso rheoliadau adeiladu i adeiladau addysgol, adeiladau ymgymerwyr statudol neu adeiladau’r goron) yn lle “25(a)” rhodder “25”.
10
Yn rheoliad 35 (dehongli Rhan 6) hepgorer “fabric energy efficiency” a “new dwelling” a’u priod ddiffiniadau.