Specified area
7. A permit scheme must specify the area within which the carrying out of specified works is to be controlled (which must be the “specified area” for the purposes of that permit scheme).
7. A permit scheme must specify the area within which the carrying out of specified works is to be controlled (which must be the “specified area” for the purposes of that permit scheme).