1,53° 59.636′ N,0° 12.409′ W,
2,53° 59.828′ N,0° 11.508′ W,
3,53° 59.84′ N,0° 9.787′ W,
4,54° 0.103′ N,0° 8.059′ W,
5,54° 0.456′ N,0° 6.579′ W,
6,54° 1.884′ N,0° 3.053′ W,
7,54° 3.141′ N,0° 0.71′ E,
8,54° 3.776′ N,0° 2.531′ E,
9,54° 4.146′ N,0° 3.459′ E,
10,54° 4.277′ N,0° 4.42′ E,
11,54° 4.311′ N,0° 5.046′ E,
12,54° 8.777′ N,0° 14.263′ E,
13,54° 16.039′ N,0° 31.609′ E,
14,54° 16.335′ N,0° 32.155′ E,
15,54° 18.431′ N,0° 36.314′ E,
16,54° 19.527′ N,0° 37.419′ E,
17,54° 25.526′ N,0° 46.478′ E,
18,54° 29.179′ N,0° 55.215′ E,
19,54° 35.243′ N,1° 15.596′ E,
20,54° 41.979′ N,1° 19.185′ E,
21,54° 42.688′ N,1° 19.12′ E,
22,54° 42.896′ N,1° 19.192′ E,
23,54° 43.005′ N,1° 19.299′ E,
24,54° 43.102′ N,1° 19.456′ E,
25,54° 44.185′ N,1° 21.713′ E,
26,54° 44.281′ N,1° 22.039′ E,
27,54° 44.3′ N,1° 22.321′ E,
28,54° 44.265′ N,1° 22.624′ E,
29,54° 39.029′ N,1° 44.927′ E,
30,54° 38.849′ N,1° 45.31′ E,
31,54° 38.572′ N,1° 45.483′ E,
32,54° 34.746′ N,1° 58.903′ E,
33,54° 34.771′ N,1° 59.729′ E,
34,54° 34.672′ N,2° 0.181′ E,
35,54° 34.475′ N,2° 0.47′ E,
36,54° 24.475′ N,2° 8.984′ E,
37,54° 24.094′ N,2° 8.924′ E,
38,54° 23.829′ N,2° 8.434′ E,
39,54° 21.084′ N,1° 54.278′ E,
40,54° 21.06′ N,1° 53.902′ E,
41,54° 21.146′ N,1° 53.486′ E,
42,54° 21.337′ N,1° 53.184′ E,
43,54° 29.145′ N,1° 46.456′ E,
44,54° 28.725′ N,1° 44.404′ E,
45,54° 27.929′ N,1° 43.364′ E,
46,54° 27.843′ N,1° 43.133′ E,
47,54° 26.379′ N,1° 31.042′ E,
48,54° 25.979′ N,1° 27.06′ E,
49,54° 26.251′ N,1° 24.963′ E,
50,54° 27.33′ N,1° 8.974′ E,
51,54° 27.864′ N,0° 59.075′ E,
52,54° 28.15′ N,0° 55.927′ E,
53,54° 24.71′ N,0° 47.697′ E,
54,54° 18.879′ N,0° 38.899′ E,
55,54° 17.721′ N,0° 37.725′ E,
56,54° 15.532′ N,0° 33.384′ E,
57,54° 15.193′ N,0° 32.753′ E,
58,54° 13.677′ N,0° 29.116′ E,
59,54° 12.454′ N,0° 27.885′ E,
60,54° 12.333′ N,0° 27.605′ E,
61,54° 11.974′ N,0° 25.037′ E,
62,54° 7.921′ N,0° 15.379′ E,
63,54° 3.303′ N,0° 5.845′ E,
64,54° 3.262′ N,0° 5.664′ E,
65,54° 3.21′ N,0° 4.703′ E,
66,54° 3.152′ N,0° 4.231′ E,
67,54° 2.862′ N,0° 3.501′ E,
68,54° 2.209′ N,0° 1.631′ E,
69,54° 0.97′ N,0° 2.081′ W,
70,53° 59.501′ N,0° 5.71′ W,
71,53° 58.989′ N,0° 7.857′ W,
72,53° 58.699′ N,0° 8.792′ W,
73,53° 58.439′ N,0° 9.962′ W,
74,53° 58.389′ N,0° 11.761′ W,
75,54° 28.994′ N,0° 58.647′ E,
76,54° 34.543′ N,1° 17.322′ E,
77,54° 34.091′ N,1° 19.939′ E,
78,54° 33.849′ N,1° 20.161′ E,
79,54° 33.702′ N,1° 20.56′ E,
80,54° 31.685′ N,1° 32.691′ E,
81,54° 31.68′ N,1° 33.169′ E,
82,54° 31.818′ N,1° 33.611′ E,
83,54° 30.757′ N,1° 40.251′ E,
84,54° 29.978′ N,1° 44.941′ E,
85,54° 29.626′ N,1° 43.28′ E,
86,54° 28.833′ N,1° 42.219′ E,
87,54° 27.438′ N,1° 30.694′ E,
88,54° 27.073′ N,1° 27.083′ E,
89,54° 27.316′ N,1° 25.259′ E,
90,54° 28.402′ N,1° 9.17′ E,
91,54° 28.935′ N,0° 59.302′ E,

East Riding of Yorkshire,A1079 between reference points 26a and 26b and marked with a green line on the streets plan,

East Riding of Yorkshire,North Turnpike between the reference points 1a and 1b and marked with a purple line on sheet 1 of the streets plan,
East Riding of Yorkshire,Cliff Road between the reference points 2a and 2b and marked with a green line on sheet 5 of the streets plan,
East Riding of Yorkshire,B1242 (Hornsea Road) between the reference points 2c and 2d and marked with a green line on sheet 5 of the streets plan,
East Riding of Yorkshire,B1242 (Hornsea Road) between the reference points 2e and 2f and marked with a green line on sheet 5 of the streets plan,
East Riding of Yorkshire,Bewholme Lane between the reference points 3a and 3b and marked with a green line on sheet 6 of the streets plan,
East Riding of Yorkshire,Dunnington Lane between the reference points 4a and 4b and marked with a green line on sheet 7of the streets plan,
East Riding of Yorkshire,Dunnington Lane between the reference points 5a and 5b and marked with a green line on sheet 8 of the streets plan,
East Riding of Yorkshire,Dunnington Lane between the reference points 5c and 5d and marked with a green line on sheet 8 of the streets plan,
East Riding of Yorkshire,A165 (Beverley Road) between the reference points 5e and 5f and marked with a green line on sheet 8 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 6a and 6b and marked with a purple line on sheet 11 of the streets plan,
East Riding of Yorkshire,Billings Lane between the reference points 7a and 7b and marked with a green line on sheet 12 of the streets plan,
East Riding of Yorkshire,Catfoss Road between the reference points 7c and 7d and marked with a green line on sheet 12 of the streets plan,
East Riding of Yorkshire,Harsell Lane between reference points 8a and 8b and marked with a green line on sheet 13 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 9a and 9b and marked with a purple line on sheet 15 of the streets plan,
East Riding of Yorkshire,Catwick Heads between reference points 9c and 9d and marked with a green line on sheet 15 of the streets plan,
East Riding of Yorkshire,A1035 (West Road) between reference points 9e and 9f and marked with a green line on sheet 15 of the streets plan,
East Riding of Yorkshire,A1035 (West Road) between reference points 9g and 9h and marked with a green line on sheet 15 of the streets plan,
East Riding of Yorkshire,Catwick Heads between reference points 10a and 10b and marked with a green line on sheet 16 of the streets plan,
East Riding of Yorkshire,Catwick Heads between reference points 10c and 10d and marked with a green line on sheet 16 of the streets plan,
East Riding of Yorkshire,Rise Lane between reference points 11a and 11b and marked with a green line on sheet 17 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 11c and 11d and marked with a purple line on sheet 17 of the streets plan,
East Riding of Yorkshire,Riston Road between reference points 12a and 12b and marked with a green line on sheet 18 of the Streets Plan,
East Riding of Yorkshire,A165 (Whitecross Road) between reference points 13a and 13b and marked with a green line on sheet 19 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 14a and 14b and marked with a purple line on sheet 20 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 14c and 14d and marked with a purple line on sheet 20 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 15a and 15b and marked with a purple line on sheet 21 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road) between reference points 15c and 15d and marked with a green line on sheet 21 of the streets plan,
East Riding of Yorkshire,Meaux Lane between reference points 16a and 16b and marked with a green line on sheet 22 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 16c and 16d and marked with a purple line on sheet 22 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road) between reference points 17a and 17b and marked with a green line on sheet 23 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road) between reference points 17c and 17d and marked with a green line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 17e and 17f and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 17g and 17h and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 17i and 17j and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 17k and 17l and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road) between reference points 18a and 18b and marked with a green line on sheets 24 and 25 of the streets plan,
East Riding of Yorkshire,Eske Lane between reference points 18c and 18d and marked with a green line on sheets 24 and 25 of the streets plan,
East Riding of Yorkshire,A1035 (Hull Bridge Road) between reference points 19a and 19b and marked with a green line on sheet 28 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 19c and 19d and marked with a purple line on sheet 28 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 20a and 20b and marked with a purple line on sheet 29 of the streets plan,
East Riding of Yorkshire,A1035 (Grange Way) between reference points 20c and 20d and marked with a green line on sheet 29 of the streets plan,
East Riding of Yorkshire,Ings Road between reference points 20e and 20f and marked with a green line on sheet 29 of the streets plan,
East Riding of Yorkshire,A164 (Driffield Road) between reference points 21a and 21b and marked with a green line on sheet 30 of the streets plan,
East Riding of Yorkshire,A1035 (Constitution Hill) between reference points 22a and 22b and marked with a green line on sheet 31 of the streets plan,
East Riding of Yorkshire,A1035 (Constitution Hill) between reference points 22c and 22d and marked with a green line on sheet 31 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 23a and 23b and marked with a purple line on sheet 32 of the streets plan,
East Riding of Yorkshire,A1174 (York Road) between reference points 23c and 23d and marked with a green line on sheet 32 of the streets plan,
East Riding of Yorkshire,Newbald Road between reference points 24a and 24b and marked with a green line on sheet 33 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 25a and 25b and marked with a purple line on sheet 34 of the streets plan,
East Riding of Yorkshire,B1230 (Broadgate) between reference points 25c and 25d and marked with a green line on sheet 34 of the streets plan,
East Riding of Yorkshire,A1079 between reference points 26a and 26b and marked with a green line on sheet 35 of the streets plan,
East Riding of Yorkshire,A164 (Beverley Road) between reference points 27a and 27b and marked with a green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment between reference points 27c and 27d and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment between reference points 27e and 27f and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment between reference points 27g and 27h and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment between reference points 28a and 28b and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment between reference points 28c and 28d and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 28e and 28f and marked with a purple line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Private Access Track between reference points 28g and 28h and marked with a purple line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,A1079 between reference points 29a and 29b and marked with a green line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Planned Hornsea Project 4 Alignment between reference points 29c and 29d and marked with a dashed pink line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Planned Hornsea Project 4 Alignment between reference points 29e and 29f and marked with a dashed pink line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Planned Hornsea Project 4 Alignment between reference points 29g and 29h and marked with a dashed pink line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Park Lane between reference points 30a and 30b and marked with a purple line on sheet 38 of the streets plan,
East Riding of Yorkshire,Park Lane between reference points 30c and 30d and marked with a purple line on sheet 38 of the streets plan,

East Riding of Yorkshire,North Turnpike,Between the reference points 1a and 1b and marked with a purple line on sheet 1 of the streets plan,
East Riding of Yorkshire,Cliff Road,Between the reference points 2a and 2b and marked with a green line on sheet 5 of the streets plan,
East Riding of Yorkshire,B1242 (Hornsea Road),Between the reference points 2c and 2d and marked with a green line on sheet 5 of the streets plan,
East Riding of Yorkshire,B1242 (Hornsea Road),Between the reference points 2e and 2f and marked with a green line on sheet 5 of the streets plan,
East Riding of Yorkshire,Bewholme Lane,Between the reference points 3a and 3b and marked with a green line on sheet 6 of the streets plan,
East Riding of Yorkshire,Dunnington Lane,Between the reference points 4a and 4b and marked with a green line on sheet 7 of the streets plan,
East Riding of Yorkshire,Dunnington Lane,Between the reference points 5a and 5b and marked with a green line on sheet 8 of the streets plan,
East Riding of Yorkshire,Dunnington Lane,Between the reference points 5c and 5d and marked with a green line on sheet 8 of the streets plan,
East Riding of Yorkshire,A165/Beverley Road,Between the reference points 5e and 5f and marked with a green line on sheet 8 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 6a and 6b and marked with a purple line on sheet 11 of the streets plan,
East Riding of Yorkshire,Billings Lane,Between the reference points 7a and 7b and marked with a green line on sheet 12 of the streets plan,
East Riding of Yorkshire,Catfoss Road,Between the reference points 7c and 7d and marked with a green line on sheet 12 of the streets plan,
East Riding of Yorkshire,Harsell Lane,Between reference points 8a and 8b and marked with a green line on sheet 13 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 9a and 9b and marked with a purple line on sheet 15 of the streets plan,
East Riding of Yorkshire,Catwick Heads,Between reference points 9c and 9d and marked with a green line on sheet 15 of the streets plan,
East Riding of Yorkshire,A1035 (West Road),Between reference points 9e and 9f and marked with a green line on sheet 15 of the streets plan,
East Riding of Yorkshire,A1035 (West Road),Between reference points 9g and 9h and marked with a green line on sheet 15 of the streets plan,
East Riding of Yorkshire,Catwick Heads,Between reference points 10a and 10b and marked with a green line on sheet 16 of the streets plan,
East Riding of Yorkshire,Catwick Heads,Between reference points 10c and 10d and marked with a green line on sheet 16 of the streets plan,
East Riding of Yorkshire,Rise Lane,Between reference points 11a and 11b and marked with a green line on sheet 17 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 11c and 11d and marked with a purple line on sheet 17 of the streets plan,
East Riding of Yorkshire,Riston Road,Between reference points 12a and 12b and marked with a green line on sheet 18 of the streets plan,
East Riding of Yorkshire,A165 (Whitecross Road),Between reference points 13a and 13b and marked with a green line on sheet 19 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 14a and 14b. and marked with a purple line on sheet 20 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 14c and 14d and marked with a purple line on sheet 20 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 15a and 15b and marked with a purple line on sheet 21 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road),Between reference points 15c and 15d and marked with a green line on sheet 21 of the streets plan,
East Riding of Yorkshire,Meaux Lane,Between reference points 16a and 16b and marked with a green line on sheet 22 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 16c and 16d and marked with a purple line on sheet 22 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road),Between reference points 17a and 17b and marked with a green line on sheet 23 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road),Between reference points 17c and 17d and marked with a green line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 17e and 17f and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 17g and 17h and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 17i and 17j and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 17k and 17l and marked with a purple line on sheet 23 of the streets plan,
East Riding of Yorkshire,A1035 (Hornsea Road),Between reference points 18a and 18b and marked with a green line on sheets 24 and 25 of the streets plan,
East Riding of Yorkshire,Eske Lane,Between reference points 18c and 18d and marked with a green line on sheets 24 and 25 of the streets plan,
East Riding of Yorkshire,A1035 (Hull Bridge Road),Between reference points 19a and 19b and marked with a green line on sheet 28 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 19c and 19d and marked with a purple line on sheet 28 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 20a and 20b and marked with a purple line on sheet 29 of the streets plan,
East Riding of Yorkshire,A1035 (Grange Way),Between reference points 20c and 20d and marked with a green line on sheet 29 of the streets plan,
East Riding of Yorkshire,Ings Road,Between reference points 20e and 20f and marked with a green line on sheet 29 of the streets plan,
East Riding of Yorkshire,A164 (Driffield Road),Between reference points 21a and 21b and marked with a green line on sheet 30 of the streets plan,
East Riding of Yorkshire,A1035 (Constitution Hill),Between reference points 22a and 22b and marked with a green line on sheet 31 of the streets plan,
East Riding of Yorkshire,A1035 (Constitution Hill),Between reference points 22c and 22d and marked with a green line on sheet 31 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 23a and 23b and marked with a purple line on sheet 32 of the streets plan,
East Riding of Yorkshire,A1174 (York Road),Between reference points 23c and 23d and marked with a green line on sheet 32 of the streets plan,
East Riding of Yorkshire,Newbald Road,Between reference points 24a and 24b and marked with a green line on sheet 33 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 25a and 25b and marked with a purple line on sheet 34 of the streets plan,
East Riding of Yorkshire,B1230 (Broadgate),Between reference points 25c and 25d and marked with a green line on sheet 34 of the streets plan,
East Riding of Yorkshire,A1079,Between reference points 26a and 26b and marked with a green line on sheet 35 of the streets plan,
East Riding of Yorkshire,A164 (Beverley Road),Between reference points 27a and 27b and marked with a green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment,Between reference points 27c and 27d and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment,Between reference points 27e and 27f and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment,Between reference points 27g and 27h and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment,Between reference points 28a and 28b and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Planned Jock’s Lodge Highway Alignment,Between reference points 28c and 28d and marked with a dashed green line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 28e and 28f and marked with a purple line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,Private Access Track,Between reference points 28g and 28h and marked with a purple line on sheets 36 and 37 of the streets plan,
East Riding of Yorkshire,A1079,Between reference points 29a and 29b and marked with a green line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Planned Hornsea Project 4 Alignment,Between reference points 29c and 29d and marked with a dashed pink line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Planned Hornsea Project 4 Alignment,Between reference points 29e and 29f and marked with a dashed pink line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Planned Hornsea Project 4 Alignment,Between reference points 29g and 29h and marked with a dashed pink line on sheets 37 and 38 of the streets plan,
East Riding of Yorkshire,Park Lane,Between reference points 30a and 30b and marked with a purple line on sheet 38 of the streets plan,
East Riding of Yorkshire,Park Lane,Between reference points 30c and 30d and marked with a purple line on sheet 38 of the streets plan,

East Riding of Yorkshire,Ulrome Footpath No. 6,Between reference points 2a and 2b marked with a solid orange line on sheet 2 of the public rights of way plan.,
East Riding of Yorkshire,Skipsea Footpath No. 6,Between reference points 5a and 5b marked with a solid orange line on sheet 5 of the public rights of way plan.,
East Riding of Yorkshire,Seaton Footpath No. 10,Between reference points 12a and 12b marked with a solid orange line on sheet 12 of the public rights of way plan.,
East Riding of Yorkshire,Catwick Footpath No. 8,Between reference points 13a and 13b marked with a solid orange line on sheet 13 of the public rights of way plan.,
East Riding of Yorkshire,Proposed Bridleway in the parishes of Catwich and Leven,Between reference points 15a and 15b marked with a solid purple line on sheet 15 of the public rights of way plan.,
East Riding of Yorkshire,Riston Footpath No. 2,Between reference points 16a and 16b marked with a solid orange line on sheet 16 of the public rights of way plan.,
East Riding of Yorkshire,Molescroft Footpath No. 5,Between reference points 22a and 22b marked with a solid orange line on sheet 22 of the public rights of way plan,
East Riding of Yorkshire,Molescroft Footpath No. 3,Between reference points 24a and 24b marked with a solid orange line on sheet 24 of the public rights of way plan,
East Riding of Yorkshire,Walkington Footpath No. 6,Between reference points 27a and 27b marked with a solid orange line on sheet 27 of the public rights of way plan,
East Riding of Yorkshire,Walkington Footpath No. 4,Between reference points 28c and 28d marked with a solid orange line on sheet 27 of the public rights of way plan,
East Riding of Yorkshire,Rowley Bridleway No. 13,Between reference points 30a and 30b, 30c and 30d and 30e and 30f marked with a solid green line on sheet 30 of the public rights of way plan,
East Riding of Yorkshire,Woodmansey Bridleway No. 30,Between reference points 30g and 30h marked with a solid green line on sheet 30 of the public rights of way plan,
East Riding of Yorkshire,Woodmansey Bridleway No. 6,Between reference points 31a and 31b and 31c and 31d marked with a solid green line on sheet 31 of the public rights of way plan,

East Riding of Yorkshire,Walkington Footpath No. 4,Between reference points 28a and 28b marked with a solid pink line on sheet 28 of the public rights of way plan,Between reference points 28a and 28b marked with a blue dashed line on sheet 28 of the public rights of way plan,

East Riding of Yorkshire,Vehicular access from North Turnpike marked point AC0 on sheet 2 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Cliff Road marked points C1 (North) and C1 (South) on sheet 5 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from B1242 (Hornsea Road) marked points AC1 (East) and AC1 (West) on sheet 5 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Bewholme Lane marked points C2 (East) and C2 (West) on sheet 6 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Dunnington Lane marked points C3 (East) and C3 (West) on sheet 7 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Dunnington Lane marked points C4 (East) and C4 (West) on sheet 8 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Dunnington Lane marked point AC2 on sheet 8 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Billings Lane marked points C5 (West) and C5 (East) on sheet 12 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Catfoss Road marked points AC3 (North) and AC3 (South) on sheet 12 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Harsell Lane marked points C6 (North) and C6 (South) on sheet 13 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Catwick Heads marked point AC4 on sheet 15 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1035 (West Road) marked point AC5 on sheet 15 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Catwick Heads marked points C7 (East) and C7 (West) on sheet 16 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Rise Lane marked points C8 (North) and C8 (South) on sheet 17 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Riston Road marked points C9 (East) and C9 (West) on sheet 18 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A165 (Whitecross Road) marked points AC7 (North) and AC7 (South) on sheet 19 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1035 (Hornsea Road) marked point AC8 on sheet 21 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Meaux Lane marked points C10 (East) and C10 (West) on sheet 22 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1035 (Hornsea Road) marked points AC9 (South) and AC9 (North) on sheet 23 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Eske Lane marked points AC10 (East) and AC10 (West) on sheet 24 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1035 (Hull Bridge Road) marked point AC11 on sheet 28 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Ings Road marked point AC12 on sheet 29 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A164 (Driffield Road) marked points AC14 (East) and AC14 (West) on sheet 30 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1035 (Constitution Hill) marked points AC13 (North) and AC13 (South) on sheet 31 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1174 (York Road) marked points AC15 (North) and AC15 (South) on sheet 32 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the B1230 (Broadgate) marked points AC16 (North) and AC16 (South) on sheet 34 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1079 marked point AC-SB4 on sheet 35 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A1079 marked point AC17 (South) on sheet 37 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Planned Jock’s Lodge Highway Alignment marked point AC17 (West) on sheets 36 and 37 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from the A164 (Beverley Road) marked point AC18 on sheets 36 and 37 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Park Lane marked points C14 (North), C14 (West) and C14 (South) on sheet 38 of the access to works plan.,
East Riding of Yorkshire,Vehicular access from Park Lane marked points C15 (North) and C15 (South) on sheet 38 of the access to works plan.,

  02-001, 02-002, 02-003,    02-004, 02-005, 02-006,    02-007, 02-008, 02-009,    02-010, 02-011, 02-012,    02-013, 02-014, 02-015,    02-017, 02-021, 02-022,    02-024, 02-026, 02-030,    02-031, 02-034, 02-038,    03-001, 03-002, 03-010,    03-011, 03-012, 03-013,    04-008, 04-009, 04-010,    04-014, 04-018, 04-021,    04-022, 04-023, 04-024,    05-001, 05-003, 05-004,    05-005, 06-001, 06-002,    06-007, 06-017, 06-018,    06-025, 07-001, 07-002,    07-003, 07-004, 07-005,    08-008, 08-009, 08-013,    08-015, 08-016, 08-017,    08-025, 08-026, 09-001,    09-002, 09-003, 09-008,    09-009, 09-010, 09-013,    10-005, 10-006, 10-007,    10-008, 10-009, 10-010,    10-011, 10-012, 10-013,    10-014, 10-019, 11-008,    11-018, 12-004, 12-011,    12-012, 12-013, 12-014,    13-001, 13-002, 13-003,    13-004, 13-005, 13-009,    13-014, 13-015, 13-016,    13-017, 14-005, 14-006,    14-007, 14-008, 14-013,    14-014, 15-006, 15-007,    15-008, 16-001, 16-002,    16-003, 16-004, 16-008,    16-009, 17-002, 17-008,    17-009, 17-010, 17-011,    18-001, 18-002, 18-007,    18-009, 18-010a, 18-012,    18-014a, 18-027, 18-038,    18-039, 18-039a, 18-043a, 18-043b, 18- 043c, 18-043d, 18-043e, 18-043f, 18-043g, 18- 043h, 18-043i, 18-043, 18-050, 18-052, 18-054, 19-003, 19-004, 19-005, 19-007, 20-002  ,  Cable rights and restrictive covenants   1   Cable rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—   a   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, together with such telemetry and fibre optic lines, ducting, jointing bays, allow the installation and use of electricity cables in the additional ducts, and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”), and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     b   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the additional ducts for electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, allow the installation and use of electricity cables in the additional ducts, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”), and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     c   enter, be on, and break open and break up the surface of the land and remain with or without plant, vehicles, machinery, apparatus and equipment which is ancillary to the purposes of transmitting electricity along the cables;     d   benefit from continuous vertical and lateral support for the authorised project;     e   pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the ducting, electrical infrastructure and cables;     f   construct and install and thereafter use the land for all necessary purposes for the commissioning, construction, repair, testing and maintenance of the ducting, electrical infrastructure and cables in, on or under the land;     g   place and use plant, machinery, structures and temporary structures within the land for the purposes of the installation, construction, maintenance, repairing, renewing, upgrading, inspecting, removal and replacing of the ducting, electrical infrastructure and cables and to erect temporary signage and provide measures for the benefit of public and personnel safety;     h   erect fencing, gates, walls, barriers or other means of enclosure, and create secure working areas and compounds including trenchless installation technique compounds and working areas;     i   construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal is being carried out;     j   erect temporary bridges and supporting or protective structures for the purposes of access to adjoining land;     k   effect access and egress to the highway;     l   make such investigations in or on the land as required;     m   alter, fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the land or other land which would if not felled, lopped, cut or removed would obstruct or interfere with the operation of the cables and ancillary equipment including ducting;     n   take and use, remove and discharge water from the land, and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, install, use, inspect, maintain, adjust, alter, renew, repair, test or cleanse drainage schemes on the land or reinstate the any existing drainage scheme on the land;     o   install, alter, re-lay, maintain, protect, adjust or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers);     p   erect and remove temporary fencing, gates, walls, barriers or other means of enclosure, remove fences and structures within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instatement or suitable replacement of the fences or structures following the exercise of the rights);     q   store and stockpile materials (including excavated material);     r   create boreholes and trial excavation pits for the purposes of intrusively surveying the land and monitoring the use of any trenchless installation technique, to keep in place and monitor the same through construction, maintenance repair, replacement or decommissioning and to reinstate the land;     s   excavate materials below ground level, including soils, and to store and re-use or dispose of the same, and in so excavating to undertake any works, including works of protection or removal of archaeological remains as may be required by any written scheme of investigation approved under this Order;     t   lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair, renewal or decommissioning is being carried out;     u   install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna;     v   carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the land and/or in accordance with any necessary licences relating to protected species and/or wildlife; and     w   (in an emergency only when the cables are temporarily unusable) to lay down, install, use, maintain and inspect underground cables, telephone signalling and fibre optic cables and ancillary equipment, associated works and other conducting media together with conduits or pipes for containing the same in and under the land.       2   Restrictive covenants    A restrictive covenant over the land for the benefit of the remainder of the Order land to—   a   prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);     b   prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);     c   prevent anything to be done by way of excavation of any kind in the land nor any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.6m for the purposes of arable farming);     d   prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project);     e   prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project;     f   prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and     g   prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.      ,
  02-016, 02-018, 02-019,    02-020, 02-023, 02-025  ,  Cable rights, transition joint bay rights and restrictive covenants    1   Cable rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—   a   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”), and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     b   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the additional ducts for electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, allow the installation and use of electricity cables in the additional ducts, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”), and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     c   enter, be on, and break open and break up the surface of the land and remain with or without plant, vehicles, machinery, apparatus and equipment which is ancillary to the purposes of transmitting electricity along the cables;     d   benefit from continuous vertical and lateral support for the authorised project;     e   pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the ducting, electrical infrastructure and cables;     f   construct and install and thereafter use the land for all necessary purposes for the commissioning, construction, repair, testing and maintenance of the ducting, electrical infrastructure and cables in, on or under the land;     g   place and use plant, machinery, structures and temporary structures within the land for the purposes of the installation, construction, maintenance, repairing, renewing, upgrading, inspecting, removal and replacing of the ducting, electrical infrastructure and cables and to erect temporary signage and provide measures for the benefit of public and personnel safety;     h   erect fencing, gates, walls, barriers or other means of enclosure, and create secure working areas and compounds including trenchless installation technique compounds and working areas;     i   construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal is being carried out;     j   erect temporary bridges and supporting or protective structures for the purposes of access to adjoining land;     k   effect access and egress to the highway;     l   make such investigations in or on the land as required;     m   alter, fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed would obstruct or interfere with the operation of the cables and ancillary equipment including ducting;     n   take and use, remove and discharge water from the land, and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, install, use, inspect, maintain, adjust, alter, renew, repair, test or cleanse drainage schemes on the land or reinstate any existing drainage scheme on the land;     o   install, alter, re-lay, maintain, protect, adjust or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers);     p   erect and remove temporary fencing, gates, walls, barriers or other means of enclosure, remove fences and structures within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instatement or suitable replacement of the fences or structures following the exercise of the rights);     q   store and stockpile materials (including excavated material);     r   create boreholes and trial excavation pits for the purposes of intrusively surveying the land and monitoring the use of any trenchless installation technique, to keep in place and monitor the same through construction, maintenance repair, replacement or decommissioning and to reinstate the land;     s   excavate materials below ground level, including soils, and to store and re-use or dispose of the same, and in so excavating to undertake any works, including works of protection or removal of archaeological remains as may be required by any written scheme of investigation approved under this Order;     t   lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair, renewal or decommissioning is being carried out;     u   install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna;     v   carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the land and/or in accordance with any necessary licences relating to protected species and/or wildlife; and     w   (in an emergency only when the cables are temporarily unusable) to lay down, install, use, maintain and inspect underground cables, telephone signalling and fibre optic cables and ancillary equipment, associated works and other conducting media together with conduits or pipes for containing the same in and under the land.       2   Transition joint bay rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace transition joint bays.     3   Restrictive covenants    A restrictive covenant over the land for the benefit of the remainder of the Order land to—   a   prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);     b   prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);     c   prevent anything to be done by way of excavation of any kind in the land nor any activities which would alter, increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities (being ploughing to no deeper than 0.6m for the purposes of arable farming);     d   prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project);     e   prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project;     f   prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and     g   prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.     ,
  02-027, 02-033, 03-006,    04-004, 04-013, 06-004,    06-012, 06-021, 08-005,    08-014, 08-021, 09-006,    10-002, 11-004, 11-010,    11-011, 11-012, 12-005,    14-011, 15-004, 16-007,    17-001, 17-005, 18-003,    18-004, 18-027, 18-029,    18-032,18-040, 18-040a, 18-040b  ,  Cable rights and restrictive covenants under existing infrastructure   1   Cable rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—   a   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, allow the installation and use of electricity cables in the additional ducts, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”), and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     b   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the additional ducts for electricity cables (including the removal of materials including spoil) in, under, over and/or on the Land, allow the installation and use of electricity cables in the additional ducts, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”), and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     c   enter, be on, and break open and break up the surface of the land and remain with or without plant, vehicles, machinery, apparatus and equipment which is ancillary to the purposes of transmitting electricity along the cables;     d   benefit from continuous vertical and lateral support for the authorised project;     e   pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the ducting, electrical infrastructure and cables;     f   construct and install and thereafter use the land for all necessary purposes for the commissioning, construction, repair, testing and maintenance of the ducting, electrical infrastructure and cables in, on or under the land;     g   place and use plant, machinery, structures and temporary structures within the land for the purposes of the installation, construction, maintenance, repairing, renewing, upgrading, inspecting, removal and replacing of the ducting, electrical infrastructure and cables and to erect temporary signage and provide measures for the benefit of public and personnel safety;     h   erect fencing, gates, walls, barriers or other means of enclosure, and create secure working areas and compounds including trenchless installation technique compounds and working areas;     i   construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal is being carried out;     j   erect temporary bridges and supporting or protective structures for the purposes of access to adjoining land;     k   effect access and egress to the highway;     l   make such investigations in or on the land as required;     m   alter, fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the land or other land which would if not felled, lopped, cut or removed would obstruct or interfere with the operation of the cables and ancillary equipment including ducting;     n   take and use, remove and discharge water from the land, and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, install, use, inspect, maintain, adjust, alter, renew, repair, test or cleanse drainage schemes on the land or reinstate the any existing drainage scheme on the land;     o   install, alter, re-lay, maintain, protect, adjust or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers);     p   erect and remove temporary fencing, gates, walls, barriers or other means of enclosure, remove fences and structures within the land during any period during which construction, maintenance, repair or renewal is being carried out (subject to erection of any temporary stock-proof fencing as is reasonably required and the re-instatement or suitable replacement of the fences or structures following the exercise of the rights);     q   store and stockpile materials (including excavated material);     r   create boreholes and trial excavation pits for the purposes of intrusively surveying the land and monitoring the use of any trenchless installation technique, to keep in place and monitor the same through construction, maintenance repair, replacement or decommissioning and to reinstate the land;     s   excavate materials below ground level, including soils, and to store and re-use or dispose of the same, and in so excavating to undertake any works, including works of protection or removal of archaeological remains as may be required by any written scheme of investigation approved under this Order;     t   lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair, renewal or decommissioning is being carried out; install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna;     u   carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the land and/or in accordance with any necessary licences relating to protected species and/or wildlife; and     v   (in an emergency only when the cables are temporarily unusable) to lay down, install, use, maintain and inspect underground cables, telephone signalling and fibre optic cables and ancillary equipment, associated works and other conducting media together with conduits or pipes for containing the same in and under the land.       2   Restrictive covenants    A restrictive covenant over the land for the benefit of the remainder of the Order land to—   a   prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto) other than those related to works for the benefit of existing highway or railway infrastructure;     b   prevent anything to be done by way of excavation of any kind in the land nor any activities which would alter, increase or decrease ground cover or soil levels by greater than 1 metre whatsoever without the consent in writing of the undertaker, save where such works are reasonably required for the exercise of statutory functions or rights in relation any public highway or railway on the land and will not damage, undermine or interfere with the cables;     c   prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project);     d   prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project;     e   prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project; and     f   prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.      ,
  18-010a, 18-014a, 18-015, 18-016, 18-017, 18-019,    18-020, 18-021, 18-022a,    18-023, 18-024, 18-025a  ,  Mitigation work areas access rights, mitigation rights and restrictive covenants   1   Permanent access rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—   a   pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of the authorised project, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the ducting, electrical infrastructure and cables and connection into any adjacent cables and associated works, to take plant and equipment on to adjoining land and make such investigations in or on the land which is ancillary for the purposes of exercise of the rights;     b   enter, be on, and break open and break up the surface of the land and remain with or without plant, vehicles, machinery, apparatus and equipment which is ancillary to the purposes of transmitting electricity along the cables;     c   construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway;     d   construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair, renewal or decommissioning is being carried out;     e   erect temporary bridges and supporting or protective structures for the purposes of access to adjoining land;     f   place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety;     g   alter, fell, lop, cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be present on the land for the purpose of enabling the right to pass and re-pass to adjoining land;     h   repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;     i   erect and remove temporary fencing, gates, walls, barriers or other means of enclosure; and     j   lay out temporary paths and bridleways for public use as temporary diversions for public rights of way which are interfered with during any period in which construction, maintenance, repair or renewal decommissioning is being carried out.       2   Mitigation works rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—   a   install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;     b   install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works and the installation of temporary barriers for the protection of fauna;     c   erect maintain, repair, improve and remove permanent fencing, gates, barriers or other means of enclosure;     d   carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the land in accordance with any necessary licences relating to protected species and/or wildlife; and     e   carry out works required to facilitate the protection of utilities apparatus.       3   Restrictive covenants    A restrictive covenant over the land for the benefit of the remainder of the Order land to prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of ecological mitigation areas or areas of habitat creation including any ploughing or grazing, during the period within which the undertaker is bound by any consent to maintain that ecological mitigation areas or areas of habitat creation, without the prior written consent of the undertaker.    ,
20-004,  1   National Grid substation works area rights    Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised project to—   a   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, allow the installation and use of electricity cables in the additional ducts, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”) and in doing so, to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     b   lay down, install, retain, adjust, alter, construct, operate, erect, use, maintain, repair, renew, upgrade, inspect, remove and replace the additional ducts for electricity cables (including the removal of materials including spoil) in, under, over and/or on the land, allow the installation and use of electricity cables in the additional ducts, together with such telemetry and fibre optic lines, ducting, jointing bays and other apparatus, protection measures, cable marker posts, chambers and manholes, manhole covers and other equipment which is ancillary to the purposes of transmitting electricity along such electricity cables (all collectively referred to as the “ cables ”) and in doing so to use or resort to trenchless installation techniques including (but not limited to) directional drilling beneath sea defences, watercourses, roads and railways;     c   enter, be on, and break open and break up the surface of the land and remain with or without plant, vehicles, machinery, apparatus and equipment which is ancillary to the purposes of transmitting electricity along the cables;     d   benefit from continuous vertical and lateral support for the authorised project;     e   pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting the authorised project and for removing and replacing the ducting, electrical infrastructure and cables;     f   use, maintain, renew improve and alter existing accesses, roads, streets, tracks or ways over the land, providing that such use is not exclusive and exercise of this right must not prevent or unreasonably inhibit use by other parties;     g   construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair, renewal or decommissioning is being carried out;     h   place and use plant, machinery, structures and temporary structures within the land, and to erect temporary signage and provide measures for the benefit of public and personnel safety;     i   alter, fell, lop, cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be present on the Land for the purpose of enabling the right to pass and re-pass to adjoining land;     j   take and use, remove and discharge water from the land and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace a drainage scheme on the land; and     k   install, alter, re-lay, maintain, protect, adjust or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers).      A restrictive covenant over the land for the benefit of the remainder of the Order land—   a   prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction, erection or works of any kind (including the foundations or footings thereto) without the prior written consent of the undertaker;     b   prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project);     c   prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the authorised project; and     d   to prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised project.     ,

01-001, 01-002, 01-003, 01-004, 01-005, 01-007, 01-008, 01-009,Temporary use for emergency access in the event of accidents and/or environmental incidents to Work Nos. 8A and/or 8B and 9A and/or 9B and to facilitate construction of a temporary construction compound at Work Nos. 10A and/or 10B,Work Nos. 10A and/or 10B,
01-006,Temporary use as a temporary construction compound and laydown area to facilitate emergency works in the event of accidents and/or environmental incidents to Work Nos. 8A and/or 8B and 9A and/or 9B,Work Nos. 11A and/or 11B,
01-010, 01-011, 01-012, 01-013, 01-014, 01-015,Temporary use for emergency access in the event of accidents and/or environmental incidents to Work Nos. 8A and/or 8B,Work Nos. 9A and/or 9B,
02-028, 02-029,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B, 13A and/or 13B and 16A and/or 16B,Work Nos. 15A and/or 15B,
02-032,Temporary use as a construction compound, construction working areas and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos.13A and/or 13B,Work Nos. 16A and/or 16B,
08-007, 14-001, 17-003,Temporary use as a construction compound, construction working areas and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 16A and/or 16B and Work Nos. 17A and/or 17B,
06-015, 06-016, 12-001, 12-002,Temporary use as a construction compound, construction working areas and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 18A and/or 18B,Work Nos. 16A and/or 16B and Work Nos. 17A and/or 17B,
06-008, 04-011, 04-016, 04-017, 11-013,Temporary use as a construction compound, construction working areas and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 16A and/or 16B,Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,
04-019, 06-011,Temporary use as a construction compound, construction working areas and laydown areas, construction of haul road and for access to facilitate construction of Works Nos. 14A and/or 14B, Work Nos. 18A and/or 18B and Work Nos. 19A and/or 19B,Work Nos. 16A and/or 16B and Work Nos. 17A and/or 17B,
02-035, 02-036, 13-011,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 18A and/or 18B,
02-037, 08-001, 11-016, 12-010,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,
10-001,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 20A and/or 20B,Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,
03-003, 03-004, 03-005, 03-007, 03-008, 03-009, 04-001, 04-002, 04-003, 04-005, 04-006, 04-007, 06-003,06-005, 06-006, 06-019, 06-020, 06-022, 06-023, 06-024, 08-011, 08-018, 08-019, 08-020, 08-022, 08-023, 08-024, 09-004, 09-005, 09-007, 11-001, 11-002, 11-003, 11-005, 11-006, 11-007,Temporary use as a construction working area and laydown areas, and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 15A and/or 15B,
04-012, 04-015,Temporary use as a construction working area and laydown areas, and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B and Work Nos. 18A and/or 18B,Work Nos. 15A and/or 15B,
04-020,Temporary use to improve junctions, roads and passing places to allow access to Work Nos. 14A and/or 14B, Work Nos. 17A and/or 17B and Work Nos. 16A and/or 16B,Work Nos. 19A and/or 19B and Work Nos. 17A and/or 17B,
05-002, 09-011, 09-012, 11-017, 13-006, 13-007, 13-008,Temporary use as a construction of haul road, construction working area and laydown areas to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 18A and/or 18B,
06-013, 14-009, 14-010, 14-012, 16-005, 16-006, 17-006, 17-007,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 17A and/or 17B,
15-002, 15-003,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 20A and/or 20B,Work Nos. 17A and/or 17B,
11-014, 11-015, 14-002, 17-004,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 16A and/or 16B,Work Nos. 17A and/or 17B,
10-017, 10-018, 13-012, 13-013,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B and Work Nos. 18A and/or 18B,Work Nos. 17A and/or 17B,
10-003,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 18A and/or 18B and Work Nos. 20A and/or 20B,Work Nos. 17A and/or 17B,
08-006,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 18A and/or 18B,Work Nos. 17A and/or 17B,
06-009,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B and Work Nos. 18A and/or 18B,Work Nos. 17A and/or 17B,
08-002,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B and Work Nos. 18A and/or 18B,Work Nos.17A and/or 17B and Work Nos. 19A and/or 19B,
06-010,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B and Work Nos. 18A and/or 18B,Work Nos. 17A and/or 17B and Work Nos. 19A and/or 19B,
6-014, 12-003,Temporary use to improve junctions, roads and passing places to allow access to Work Nos. 14A and/or 14B, Work Nos.16A and/or 16B and Work Nos. 18A and/or 18B,Work Nos. 17A and/or 17B and Work Nos. 19A and/or 19B,
14-003,Temporary use to improve junctions, roads and passing places to allow access to Work Nos. 14A and/or 14B and Work Nos. 16A and/or 16B,Work Nos. 17A and/or 17B and Work Nos. 19A and/or 19B,
08-003, 08-004,Temporary use to improve junctions, roads and passing places to allow access to Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B, Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,Work Nos. 19A and/or 19B,
14-004,Temporary use to improve junctions, roads and passing places to allow access to Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B and Work Nos. 17A and/or 17B,Work Nos. 19A and/or 19B,
08-010, 08-012,Temporary use as a construction of haul road, construction working area and laydown areas and haul roads to facilitate Work Nos. 14A and/or 14B and Work Nos. 18A and/or 18B,Works Nos. 15A and/or 15B and Work Nos. 18A and/or 18B,
10-016,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 14A and/or 14B and Work Nos. 16A and/or 16B,Works Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,
10-015,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 16A and/or 16B and Work Nos. 18A and/or 18B,
11-009,Temporary use as a construction working area and laydown areas, and for access to facilitate construction of Work Nos. 14A and/or 14B, Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,Work Nos. 16A and/or 16B,
12-006, 12-007, 12-008, 12-009,Temporary use to improve junctions, roads and passing places to allow access to Work Nos. 14A and/or 14B, Work Nos. 16A and/or 16B, Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,Work Nos. 19A and/or 19B,
13-010,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 16A and/or 16B, Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,
10-004, 15-001, 15-005,Temporary use as a construction of haul road, construction working area, construction compound and laydown areas and for access to facilitate construction of Work Nos. 14A and/or 14B,Work Nos. 17A and/or 18B and Work Nos. 20A and/or 20B,
18-005,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction off A1079 of Work Nos. 14A and/or 14B, Work Nos. 20A and/or 20B, Work Nos. 23A and/or 23B and Work Nos. 24A and/or 24B,Work Nos. 21A and/or 21B and Work Nos. 22A and/or 22B,
18-011, 18-013,Temporary use as a construction of haul road, construction working area, construction compound and laydown areas and for access to facilitate construction of Work Nos. 24A and/or 24B,Work Nos. 23A and/or 23B,
18-041, 18-042, 18-042a, 18-047c,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 31A and/or 31B,Work Nos. 17A and/or 17B,
18-044, 18-044a,Temporary use as a construction working area and laydown areas, and for access to facilitate construction of Work Nos. 31A and/or 31B,Work Nos. 16A and/or 16B,
18-027a, 18-045,18-045a, 18-045b, 18-045c, 18-046, 18-046a, 18-047a, 18-047e, 18-049, 18-051, 18-053, 19-006, 20-001,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 31A and/or 31B,Work Nos. 18A and/or 18B,
18-047, 18-047b, 18-047d, 18-048, 18-048a, 18-048b,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 31A and/or 31B,Work Nos. 17A and/or 17B and Work Nos. 18A and/or 18B,
20-003,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 31A and/or 31B,Work Nos. 15A and/or 15B and Work Nos. 18A and/or 18B,
18-055,Temporary use as a construction of haul road, construction working area and laydown areas and for access to facilitate construction of Work Nos. 31A and/or 31B,Work Nos. 18A and/or 18B and Work Nos. 33A and/or 33B,
18-055a, 19-001, 19-001a, 19-001b, 19-001c, 19-002,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction off A1079 of Work Nos. 31A and/or 31B,Work Nos. 33A and/or 33B,
20-005,Temporary use as a construction working area and laydown areas, construction of haul road and for access to facilitate construction of Work Nos. 31A and/or 31B and Work Nos. 34A and/or 34B,Work Nos. 15A and/or 15B,

1,54° 31.15408′ N,1° 44.71761′ E,
2,54° 31.46655′ N,1° 44.62625′ E,
3,54° 31.75489′ N,1° 44.85252′ E,
4,54° 34.18354′ N,1° 48.56875′ E,
5,54° 34.30904′ N,1° 48.85301′ E,
6,54° 34.36288′ N,1° 49.19779′ E,
7,54° 34.74598′ N,1° 58.90264′ E,
8,54° 34.77086′ N,1° 59.72884′ E,
9,54° 34.67215′ N,2° 0.18106′ E,
10,54° 34.47546′ N,2° 0.46972′ E,
11,54° 24.47523′ N,2° 8.98399′ E,
12,54° 24.09368′ N,2° 8.92387′ E,
13,54° 23.82918′ N,2° 8.43359′ E,
14,54° 21.08378′ N,1° 54.2778′ E,
15,54° 21.0601′ N,1° 53.90188′ E,
16,54° 21.14588′ N,1° 53.48645′ E,
17,54° 21.33732′ N,1° 53.18358′ E,

1,54° 33.7017’ N,1° 20.55955’ E,
2,54° 33.84869’ N,1° 20.16118’ E,
3,54° 34.09052’ N,1° 19.9387’ E,
4,54° 42.68808’ N,1° 19.11958’ E,
5,54° 42.89576’ N,1° 19.19192’ E,
6,54° 43.00532’ N,1° 19.2987’ E,
7,54° 43.10223’ N,1° 19.45603’ E,
8,54° 44.18515’ N,1° 21.7125’ E,
9,54° 44.28093’ N,1° 22.03856’ E,
10,54° 44.30046’ N,1° 22.32068’ E,
11,54° 44.26468’ N,1° 22.62418’ E,
12,54° 39.02878’ N,1° 44.92686’ E,
13,54° 38.84907’ N,1° 45.31024’ E,
14,54° 38.57165’ N,1° 45.4825’ E,
15,54° 36.48108’ N,1° 44.38088’ E,
16,54° 36.3193’ N,1° 44.24208’ E,
17,54° 36.19975’ N,1° 44.03507’ E,
18,54° 31.81809’ N,1° 33.61066’ E,
19,54° 31.68029’ N,1° 33.16936’ E,
20,54° 31.68491’ N,1° 32.6914’ E,

1,53° 59.6364’ N,0° 12.40874’ W,
2,53° 59.82784’ N,0° 11.50751’ W,
3,53° 59.84021’ N,0° 9.78718’ W,
4,54° 0.1033’ N,0° 8.05888’ W,
5,54° 0.45563’ N,0° 6.57895’ W,
6,54° 1.88431’ N,0° 3.05262’ W,
7,54° 3.14098’ N,0° 0.70959’ E,
8,54° 3.77637’ N,0° 2.53092’ E,
9,54° 4.14562’ N,0° 3.45918’ E,
10,54° 4.27659’ N,0° 4.42011’ E,
11,54° 4.31082’ N,0° 5.04613’ E,
12,54° 8.77722’ N,0° 14.26259’ E,
13,54° 16.03855’ N,0° 31.60943’ E,
14,54° 16.33488’ N,0° 32.15475’ E,
15,54° 18.43135’ N,0° 36.31356’ E,
16,54° 19.52715’ N,0° 37.41854’ E,
17,54° 25.52646’ N,0° 46.47839’ E,
18,54° 29.17866’ N,0° 55.21543’ E,
19,54° 29.23775’ N,0° 55.41054’ E,
20,54° 29.26306’ N,0° 55.54642’ E,
21,54° 29.26308’ N,0° 55.68909’ E,
22,54° 28.99427’ N,0° 58.64713’ E,
23,54° 28.93459’ N,0° 59.30204’ E,
24,54° 28.40177’ N,1° 9.1699’ E,
25,54° 27.31636’ N,1° 25.25919’ E,
26,54° 27.07325’ N,1° 27.08349’ E,
27,54° 27.43831’ N,1° 30.69383’ E,
28,54° 28.83322’ N,1° 42.21898’ E,
29,54° 29.62572’ N,1° 43.27968’ E,
30,54° 29.97807’ N,1° 44.94092’ E,
31,54° 30.11639’ N,1° 45.61608’ E,
32,54° 31.15408’ N,1° 44.71761’ E,
33,54° 31.46655’ N,1° 44.62625’ E,
34,54° 31.75489’ N,1° 44.85252’ E,
35,54° 34.18354’ N,1° 48.56875’ E,
36,54° 34.30904’ N,1° 48.85301’ E,
37,54° 34.36288’ N,1° 49.19779’ E,
38,54° 34.74598’ N,1° 58.90264’ E,
39,54° 34.77086’ N,1° 59.72884’ E,
40,54° 34.67215’ N,2° 0.18106’ E,
41,54° 34.47546’ N,2° 0.46972’ E,
42,54° 24.47523’ N,2° 8.98399’ E,
43,54° 24.09368’ N,2° 8.92387’ E,
44,54° 23.82918’ N,2° 8.43359’ E,
45,54° 21.08378’ N,1° 54.2778’ E,
46,54° 21.0601’ N,1° 53.90188’ E,
47,54° 21.14588’ N,1° 53.48645’ E,
48,54° 21.33732’ N,1° 53.18358’ E,
49,54° 29.14527’ N,1° 46.45614’ E,
50,54° 28.72479’ N,1° 44.40444’ E,
51,54° 27.92907’ N,1° 43.36372’ E,
52,54° 27.84264’ N,1° 43.13336’ E,
53,54° 26.37912’ N,1° 31.04218’ E,
54,54° 25.97903’ N,1° 27.06027’ E,
55,54° 26.25093’ N,1° 24.96288’ E,
56,54° 27.32951’ N,1° 8.97414’ E,
57,54° 27.86406’ N,0° 59.07512’ E,
58,54° 28.15029’ N,0° 55.92687’ E,
59,54° 24.70977’ N,0° 47.69726’ E,
60,54° 18.87875’ N,0° 38.89895’ E,
61,54° 17.72124’ N,0° 37.72511’ E,
62,54° 15.53155’ N,0° 33.38368’ E,
63,54° 15.19324’ N,0° 32.75337’ E,
64,54° 13.67671’ N,0° 29.11575’ E,
65,54° 12.45423’ N,0° 27.88505’ E,
66,54° 12.33295’ N,0° 27.60465’ E,
67,54° 11.97431’ N,0° 25.0371’ E,
68,54° 7.92055’ N,0° 15.37852’ E,
69,54° 3.30272’ N,0° 5.84501’ E,
70,54° 3.26167’ N,0° 5.6635’ E,
71,54° 3.21017’ N,0° 4.70318’ E,
72,54° 3.15199’ N,0° 4.23063’ E,
73,54° 2.86151’ N,0° 3.50109’ E,
74,54° 2.20927’ N,0° 1.63117’ E,
75,54° 0.96981’ N,0° 2.08082’ W,
76,53° 59.50126’ N,0° 5.71047’ W,
77,53° 58.98868’ N,0° 7.85689’ W,
78,53° 58.69884’ N,0° 8.79203’ W,
79,53° 58.4388’ N,0° 9.96246’ W,
80,53° 58.38876’ N,0° 11.76128’ W,

1,295623.5,5988145,23,298275.5,5998380,
2,295151.2,5988060,24,298621.2,5998874,
3,294745.5,5988423,25,298836.9,5999246,
4,294511.3,5988778,26,299247.9,5999525,
5,294268.6,5989292,27,299486.8,5999430,
6,293876.3,5989601,28,299598.1,5998762,
7,293560.8,5989880,39,299594.8,5997967,
8,293332.8,5990368,30,299268.7,5997636,
9,293232.9,5990929,31,298936.8,5997174,
10,293248,5991618,32,298720.2,5996494,
11,293357,5992382,33,298564.6,5995785,
12,293486,5993034,34,298381.8,5994812,
13,293672.5,5993577,35,298391.6,5993963,
14,293869.5,5994077,36,298294.2,5992800,
15,294131.6,5994638,37,298298.3,5991819,
16,294494.2,5995216,38,298274.7,5990919,
17,295039.8,5995701,39,298010.4,5989870,
18,295805.2,5996367,40,297423.3,5988941,
19,296495.2,5996740,41,296719,5988548,
20,297164.8,5997219,42,296143.8,5988255,
21,297591.3,5997561,43,295623.5,5988145,
22,297845.4,5997953,,,,

1,53° 59.6364’ N,0° 12.40874’ W,
2,53° 59.82784’ N,0° 11.50751’ W,
3,53° 59.84021’ N,0° 9.78718’ W,
4,54° 0.1033’ N,0° 8.05888’ W,
5,54° 0.45563’ N,0° 6.57895’ W,
6,54° 1.88431’ N,0° 3.05262’ W,
7,54° 3.14098’ N,0° 0.70959’ E ,
8,54° 3.77637’ N,0° 2.53092’ E,
9,54° 4.14562’ N,0° 3.45918’ E,
10,54° 4.27659’ N,0° 4.42011’ E,
11,54° 4.31082’ N,0° 5.04613’ E,
12,54° 8.77722’ N,0° 14.26259’ E,
13,54° 16.03855’ N,0° 31.60943’ E,
14,54° 16.33488’ N,0° 32.15475’ E,
15,54° 18.43135’ N,0° 36.31356’ E,
16,54° 19.52715’ N,0° 37.41854’ E,
17,54° 25.52646’ N,0° 46.47839’ E,
18,54° 29.17866’ N,0° 55.21543’ E,
19,54° 35.2432’ N,1° 15.59582’ E,
20,54° 41.97912’ N,1° 19.18481’ E,
21,54° 42.68808’ N,1° 19.11958’ E,
22,54° 42.89576’ N,1° 19.19192’ E,
23,54° 43.00532’ N,1° 19.2987’ E,
24,54° 43.10223’ N,1° 19.45603’ E,
25,54° 44.18515’ N,1° 21.7125’ E,
26,54° 44.28093’ N,1° 22.03856’ E,
27,54° 44.30046’ N,1° 22.32068’ E,
28,54° 44.26468’ N,1° 22.62418’ E,
29,54° 39.02878’ N,1° 44.92686’ E,
30,54° 38.84907’ N,1° 45.31024’ E,
31,54° 38.57165’ N,1° 45.4825’ E,
32,54° 36.48108’ N,1° 44.38088’ E,
33,54° 36.3193’ N,1° 44.24208’ E,
34,54° 36.19975’ N,1° 44.03507’ E,
35,54° 31.81809’ N,1° 33.61066’ E,
36,54° 31.68029’ N,1° 33.16936’ E,
37,54° 31.68491’ N,1° 32.6914’ E,
38,54° 33.7017’ N,1° 20.55955’ E,
39,54° 33.84869’ N,1° 20.16118’ E,
40,54° 34.09052’ N,1° 19.9387’ E,
41,54° 34.54334’ N,1° 17.32206’ E,
42,54° 28.99427’ N,0° 58.64713’ E,
43,54° 28.15029’ N,0° 55.92687’ E,
44,54° 24.70977’ N,0° 47.69726’ E,
45,54° 18.87875’ N,0° 38.89895’ E,
46,54° 17.72124’ N,0° 37.72511’ E,
47,54° 15.53155’ N,0° 33.38368’ E,
48,54° 15.19324’ N,0° 32.75337’ E,
49,54° 13.67671’ N,0° 29.11575’ E,
50,54° 12.45423’ N,0° 27.88505’ E,
51,54° 12.33295’ N,0° 27.60465’ E,
52,54° 11.97431’ N,0° 25.0371’ E,
53,54° 7.92055’ N,0° 15.37852’ E,
54,54° 3.30272’ N,0° 5.84501’ E,
55,54° 3.26167’ N,0° 5.6635’ E,
56,54° 3.21017’ N,0° 4.70318’ E,
57,54° 3.15199’ N,0° 4.23063’ E,
58,54° 2.86151’ N,0° 3.50109’ E,
59,54° 2.20927’ N,0° 1.63117’ E,
60,54° 0.96981’ N,0° 2.08082’ W,
61,53° 59.50126’ N,0° 5.71047’ W,
62,53° 58.98868’ N,0° 7.85689’ W,
63,53° 58.69884’ N,0° 8.79203’ W,
64,53° 58.4388’ N,0° 9.96246’ W,
65,53° 58.38876’ N,0° 11.76128’ W,

1,295623.5,5988145,23,298275.5,5998380,
2,295151.2,5988060,24,298621.2,5998874,
3,294745.5,5988423,25,298836.9,5999246,
4,294511.3,5988778,26,299247.9,5999525,
5,294268.6,5989292,27,299486.8,5999430,
6,293876.3,5989601,28,299598.1,5998762,
7,293560.8,5989880,39,299594.8,5997967,
8,293332.8,5990368,30,299268.7,5997636,
9,293232.9,5990929,31,298936.8,5997174,
10,293248,5991618,32,298720.2,5996494,
11,293357,5992382,33,298564.6,5995785,
12,293486,5993034,34,298381.8,5994812,
13,293672.5,5993577,35,298391.6,5993963,
14,293869.5,5994077,36,298294.2,5992800,
15,294131.6,5994638,37,298298.3,5991819,
16,294494.2,5995216,38,298274.7,5990919,
17,295039.8,5995701,39,298010.4,5989870,
18,295805.2,5996367,40,297423.3,5988941,
19,296495.2,5996740,41,296719,5988548,
20,297164.8,5997219,42,296143.8,5988255,
21,297591.3,5997561,43,295623.5,5988145,
22,297845.4,5997953,,,,

1,54° 33.7017′ N,1° 20.55955′ E,
2,54° 33.84869′ N,1° 20.16118′ E,
3,54° 34.09052′ N,1° 19.9387′ E,
4,54° 42.68808′ N,1° 19.11958′ E,
5,54° 42.89576′ N,1° 19.19192′ E,
6,54° 43.00532′ N,1° 19.2987′ E,
7,54° 43.10223′ N,1° 19.45603′ E,
8,54° 44.18515′ N,1° 21.7125′ E,
9,54° 44.28093′ N,1° 22.03856′ E,
10,54° 44.30046′ N,1° 22.32068′ E,
11,54° 44.26468′ N,1° 22.62418′ E,
12,54° 39.02878′ N,1° 44.92686′ E,
13,54° 38.84907′ N,1° 45.31024′ E,
14,54° 38.57165′ N,1° 45.4825′ E,
15,54° 34.74598′ N,1° 58.90264′ E,
16,54° 34.77086′ N,1° 59.72884′ E,
17,54° 34.67215′ N,2° 0.18106′ E,
18,54° 34.47546′ N,2° 0.46972′ E,
19,54° 24.47523′ N,2° 8.98399′ E,
20,54° 24.09368′ N,2° 8.92387′ E,
21,54° 23.82918′ N,2° 8.43359′ E,
22,54° 21.08378′ N,1° 54.2778′ E,
23,54° 21.0601′ N,1° 53.90188′ E,
24,54° 21.14588′ N,1° 53.48645′ E,
25,54° 21.33732′ N,1° 53.18358′ E,
26,54° 29.82331′ N,1° 45.86969′ E,
27,54° 30.75742′ N,1° 40.25123′ E,
28,54° 31.81809′ N,1° 33.61066′ E,
29,54° 31.68029′ N,1° 33.16936′ E,
30,54° 31.68491′ N,1° 32.6914′ E,

1,54° 33.7017′ N,1° 20.55955′ E,
2,54° 33.84869′ N,1° 20.16118′ E,
3,54° 34.09052′ N,1° 19.9387′ E,
4,54° 42.68808′ N,1° 19.11958′ E,
5,54° 42.89576′ N,1° 19.19192′ E,
6,54° 43.00532′ N,1° 19.2987′ E,
7,54° 43.10223′ N,1° 19.45603′ E,
8,54° 44.18515′ N,1° 21.7125′ E,
9,54° 44.28093′ N,1° 22.03856′ E,
10,54° 44.30046′ N,1° 22.32068′ E,
11,54° 44.26468′ N,1° 22.62418′ E,
12,54° 39.02878′ N,1° 44.92686′ E,
13,54° 38.84907′ N,1° 45.31024′ E,
14,54° 38.57165′ N,1° 45.4825′ E,
15,54° 34.74598′ N,1° 58.90264′ E,
16,54° 34.77086′ N,1° 59.72884′ E,
17,54° 34.67215′ N,2° 0.18106′ E,
18,54° 34.47546′ N,2° 0.46972′ E,
19,54° 24.47523′ N,2° 8.98399′ E,
20,54° 24.09368′ N,2° 8.92387′ E,
21,54° 23.82918′ N,2° 8.43359′ E,
22,54° 21.08378′ N,1° 54.2778′ E,
23,54° 21.0601′ N,1° 53.90188′ E,
24,54° 21.14588′ N,1° 53.48645′ E,
25,54° 21.33732′ N,1° 53.18358′ E,
26,54° 29.82331′ N,1° 45.86969′ E,
27,54° 30.75742′ N,1° 40.25123′ E,
28,54° 31.81809′ N,1° 33.61066′ E,
29,54° 31.68029′ N,1° 33.16936′ E,
30,54° 31.68491′ N,1° 32.6914′ E,

East Riding of Yorkshire District,The hedgerow marked H0003b on sheet 5 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0005 on sheet 5 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0007 on sheet 6 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0008 on sheet 7 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0010 on sheet 7 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0013 on sheet 8 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0014 on sheet 9 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0015 on sheet 9 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0016 on sheet 9 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0024 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0026 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0027 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0028 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0029 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0032 on sheet 13 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0034 on sheet 14 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0035 on sheet 14 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0037 on sheet 15 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0038 on sheet 15 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0039 on sheet 15 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0040 on sheet 15 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0042 on sheet 15 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0043 on sheet 16 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The line of trees marked H0044 on sheet 16 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The line of trees marked H0045 on sheet 16 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The line of trees marked H0046 on sheet 16 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The line of trees marked H0047 on sheet 16 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0052 on sheet 17 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0053 on sheet 18 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0068a on sheet 23 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0070 on sheet 23 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0072 on sheet 23 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0074 on sheet 24 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0075 on sheet 24 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0076 on sheet 24 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0077 on sheet 25 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0078 on sheet 24 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0079 on sheet 26 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0080 on sheet 26 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0081 on sheet 26 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0084 on sheet 27 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0086 on sheet 28 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0087 on sheet 28 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0102 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0104 on sheet 30 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0106 on sheet 30 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0107 on sheet 30 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0109 on sheet 31 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0110 on sheet 31 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0111 on sheet 31 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0113a on sheet 31 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0117 on sheet 32 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0118 on sheet 33 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0125 on sheet 35 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0126 on sheet 35 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0128 on sheet 34 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0129 on sheet 35 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0134 on sheet 35 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0135 on sheet 36 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0153 on sheet 37 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0154 on sheet 37 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0158 on sheet 37 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0165 on sheet 38 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0166 on sheet 38 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0166 on sheet 38 of the tree preservation order and hedgerow plan,

East Riding of Yorkshire District,The hedgerow marked H0001 on sheet 5 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0002 on sheet 5 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0009 on sheet 7 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0011 on sheet 8 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0012 on sheet 8 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0017 on sheet 9 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0018 on sheet 10 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0019 on sheet 10 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0020 on sheet 10 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0021 on sheet 11 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0022 on sheet 11 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0023 on sheet 11 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0025 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0030 on sheet 12 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0033 on sheet 14 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0048 on sheet 16 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0049 on sheet 17 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0050 on sheet 17 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0051 on sheet 17 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0054 on sheet 18 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0055 on sheet 18 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0056 on sheet 18 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0057 on sheet 19 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0058b on sheet 19 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0059b on sheet 19 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0060 on sheet 19 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0062 on sheet 21 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0063 on sheet 21 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0064 on sheet 22 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0065 on sheet 22 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0066 on sheet 22 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0067 on sheet 22 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0082 on sheet 26 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0088 on sheet 28 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0089 on sheet 28 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0090 on sheet 28 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0093 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0094 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0096 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0097 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0098 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0100 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0101 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0103 on sheet 29 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0108 on sheet 31 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0114 on sheet 31 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0115 on sheet 32 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0116 on sheet 32 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0120 on sheet 34 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0121 on sheet 34 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0122 on sheet 34 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0123 on sheet 34 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0124 on sheet 34 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0127 on sheet 35 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0137 on sheet 36 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0140 on sheet 36 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0144b on sheet 36 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0151 on sheet 36 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0159 on sheet 37 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0160 on sheet 37 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0162 on sheet 38 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0163 on sheet 38 of the tree preservation order and hedgerow plan,
East Riding of Yorkshire District,The hedgerow marked H0164 on sheet 38 of the tree preservation order and hedgerow plan,

7.0,REP7-022,Environmental Statement Non-Technical Summary,2,June 2025,
7.1,REP7-024,Environmental Statement Chapter 1 – Introduction,2,June 2025,
7.2,APP-065,Environmental Statement Chapter 2 – Need for the Project,1,June 2024,
7.3,REP7-027,Environmental Statement Chapter 3 – Policy and Legislative Context,2,June 2025,
7.4,REP7-028,Environmental Statement Chapter 4 – Site Selection &amp; Assessment of Alternatives,3,June 2025,
7.5,REP7-032,Environmental Statement Chapter 5 – Project Description,4,June 2025,
7.6,APP-076,Environmental Statement Chapter 6 – Environmental Impact Assessment Methodology,1,June 2024,
7.7,APP-079,Environmental Statement Chapter 7 – Consultation,1,June 2024,
7.8,REP7-035,Environmental Statement Chapter 8 – Marine Physical Environment,2,June 2025,
7.9,REP7-038,Environmental Statement Chapter 9 – Benthic and Intertidal Ecology,2,June 2025,
7.10,REP7-042,Environmental Statement Chapter 10 – Fish and Shellfish Ecology,2,June 2025,
7.11,REP7-045,Environmental Statement Chapter 11 – Marine Mammals,2,June 2025,
7.12,REP6-015,Environmental Statement Chapter 12 – Offshore Ornithology,4,June 2025,
7.13,REP7-048,Environmental Statement Chapter 13 – Commercial Fisheries,2,June 2025,
7.14,REP7-051,Environmental Statement Chapter 14 – Shipping and Navigation,2,June 2025,
7.15,REP7-056,Environmental Statement Chapter 15 – Aviation and Radar,2,June 2025,
7.16,REP7-060,Environmental Statement Chapter 16 – Infrastructure and Other Users,4,June 2025,
7.17,REP7-062,Environmental Statement Chapter 17 – Offshore Archaeology and Cultural Heritage,2,June 2025,
7.18,REP7-064,Environmental Statement Chapter 18 – Terrestrial Ecology and Ornithology,6,June 2025,
7.19,REP6-020,Environmental Statement Chapter 19 – Geology and Land Quality,2,June 2025,
7.20,REP5-018,Environmental Statement Chapter 20 – Flood Risk and Hydrology,3,May 2025,
7.21,REP5-022,Environmental Statement Chapter 21 – Land Use,4,May 2025,
7.22,REP7-073,Environmental Statement Chapter 22 – Onshore Archaeology and Cultural Heritage,3,June 2025,
7.23,REP7-090,Environmental Statement Chapter 23 – Landscape and Visual Impact Assessment,2,June 2025,
7.24,REP6-025,Environmental Statement Chapter 24 – Traffic and Transport,2,June 2025,
7.25,REP6-028,Environmental Statement Chapter 25 – Noise,3,June 2025,
7.26,REP7-096,Environmental Statement Chapter 26 – Air Quality,2,June 2025,
7.27,APP-214,Environmental Statement Chapter 27 – Human Health,1,June 2024,
7.28,APP-217,Environmental Statement Chapter 28 – Socio-economics,1,June 2024,
7.29,REP6-033,Environmental Statement Chapter 29 – Tourism and Recreation,2,June 2025,
7.30,REP6-036,Environmental Statement Chapter 30 – Climate Change,2,June 2025,
7.4.1,REP7-030,Environmental Statement Chapter 4 – Site Selection and Assessment of Alternatives - Figure 4-1 to Figure 4-37,2,June 2025,
7.5.1,REP7-034,Environmental Statement Chapter 5 – Project Description - Figure 5-1 to Figure 5-4,3,June 2025,
7.8.1,REP7-037,Environmental Statement Chapter 8 – Marine Physical Environment - Figure 8-1 to Figure 8-13 - Volume 7,3,June 2025,
7.9.1,REP7-040,Environmental Statement Chapter 9 - Benthic and Intertidal Ecology - Figure 9-1 to Figure 9-6,2,June 2025,
7.10.1,REP7-044,Environmental Statement Chapter 10 – Fish and Shellfish Ecology - Figure 10-1 to Figure 10-10,2,June 2025,
7.11.1,REP7-047,Environmental Statement Chapter 11 – Marine Mammals - Figure 11-1 to Figure 11-6,2,June 2025,
7.12.1,REP6-017,Environmental Statement Chapter 12- Offshore Ornithology Figure 12-1 to Figure 12-3,2,June 2025,
7.13.1,REP7-050,Environmental Statement Chapter 13 – Commercial Fisheries - Figure 13-1 to Figure 13-2,2,June 2025,
7.14.1,REP7-053,Environmental Statement Chapter 14 – Shipping and Navigation - Figure 14-1 to Figure 14-7,2,June 2025,
7.15.1,APP-126,Environmental Statement Chapter 15 – Aviation and Radar - Figure 15-1 to Figure 15-3,1,June 2024,
7.16.1,REP7-060,Environmental Statement Chapter 16 – Infrastructure and Other Users - Figure 16-1 to Figure 16-6,4,June 2025,
7.17.1,APP-134,Environmental Statement Chapter 17 – Offshore Archaeology and Cultural Heritage - Figure 17-1 to Figure 17-3,1,June 2024,
7.18.1,REP7-066,Environmental Statement Chapter 18 – Terrestrial Ecology and Ornithology - Figure 18-1 to Figure 18-6,2,June 2025,
7.19.1,REP6-022,Environmental Statement Chapter 19 – Geology and Land Quality - Figure 19-1 to Figure 19-9,4,June 2025,
7.20.1,REP5-019,Environmental Statement Chapter 20 – Flood Risk and Hydrology - Figure 20-1 to Figure 20-6,2,May 2025,
7.21.1,REP5-024,Environmental Statement Chapter 21 – Land Use - Figure 21-1 to Figure 21-6,3,May 2025,
7.22.1,REP7-075,Environmental Statement Chapter 22 – Onshore Archaeology and Cultural Heritage Figure 22-1 to Figure 22-6,2,June 2025,
7.23.1,REP4-039,Environmental Statement Chapter 23 – Landscape and Visual Impact Assessment - Figure 23-1 to Figure 23-17,4,April 2025,
7.24.1,REP6-027,Environmental Statement Chapter 24 – Traffic and Transport - Figure 24-1 to Figure 24-5,3,June 2025,
7.25.1,REP6-030,Environmental Statement Chapter 25 – Noise - Figure 25-1,2,June 2025,
7.26.1,REP7-098,Environmental Statement Chapter 26 – Air Quality - Figure 26-1 to Figure 26-4,2,June 2025,
7.27.1,APP-215,Environmental Statement Chapter 27 – Human Health - Figure 27-1,1,June 2024,
7.29.1,REP6-035,Environmental Statement Chapter 29 – Tourism and Recreation - Figure 29-1 to Figure 29-3,2,June 2025,
7.4.4.1,APP-069,Environmental Statement Appendix 4-1 - Ofgem and National Grid Electricity System Operator Holistic Network Design Statements,1,June 2024,
7.4.4.2,APP-070,Environmental Statement Appendix 4-2 – Access Strategy Development,1,June 2024,
7.4.4.3,REP7-031,Appendix 4-3 Onshore Substation Zone Constraints,1,June 2025,
7.5.5.1,APP-073,Environmental Statement Appendix 5-1 - Project Description Consultation Responses,1,June 2024,
7.5.5.2,REP4-030,Environmental Statement Appendix 5-2 - Obstacle Crossing Register,4,April 2025,
7.5.5.3,REP2-016,Environmental Statement Appendix 5-3 - Engineering Drawings,2,February 2025,
7.6.6.1,REP3-009,Environmental Statement Appendix 6-1 - Onshore Cumulative Effects Assessment Methodology,2,March 2025,
7.6.6.2,APP-078,Environmental Statement Appendix 6-2 - Offshore Cumulative Effects Assessment Methodology,1,June 2024,
7.8.8.1,APP-082,Environmental Statement Appendix 8-1 - Marine Physical Environment Consultation Responses,1,June 2024,
7.8.8.2,APP-082,Environmental Statement Appendix 8-2 - Met Mast Survey Analysis,1,June 2024,
7.8.8.3,REP2-017,Environmental Statement Appendix 8-3 – Marine Physical Processes Modelling Technical Report,3,February 2025,
7.9.9.1,APP-087,Environmental Statement Appendix 9-1 - Benthic and Intertidal Ecology Consultation Responses,1,June 2024,
7.9.9.2,APP-088,Environmental Statement Appendix 9-2 - Intertidal Survey Report,1,June 2024,
7.9.9.3,APP-089,Environmental Statement Appendix 9-3 - Benthic Ecology Monitoring Report,1,June 2024,
7.9.9.4,APP-090,Environmental Statement Appendix 9-4 - Environmental Features Report,1,June 2024,
7.9.9.5,REP7-041,Appendix 9-5 Biotopes and Species of Designated Sites,1,June 2025,
7.10.10.1,APP-093,Environmental Statement Appendix 10-1 - Fish and Shellfish Ecology Consultation Responses,1,June 2024,
7.10.10.2,APP-094,Environmental Statement Appendix 10-2 - Fish and Shellfish Ecology Technical Appendix,1,June 2024,
7.10.10.3,,Environmental Statement Appendix 10-3 – Back calculation of the Peak Atlantic Herring Spawning Period,3,December 2025,
7.11.11.1,APP-097,Environmental Statement Appendix 11-1 - Marine Mammal Consultation Responses,1,June 2024,
7.11.11.2,APP-098,Environmental Statement Appendix 11-2 – Marine Mammal Information Report,1,June 2024,
7.11.11.3,AS-137,Environmental Statement Appendix 11-3 - Underwater Noise Modelling Report,2,January 2025,
7.11.11.4,REP5-013,Environmental Statement Appendix 11-4 Interim Population Consequence of Disturbance Modelling (iPCoD),3,May 2025,
7.11.11.5,APP-101,Environmental Statement Appendix 11-5 - Cumulative Effects Assessment Screening,1,June 2024,
7.11.11.6,REP3-012,Environmental Statement Appendix 11-6 - Unexploded Ordnance Clearance Information and Assessment,3,March 2025,
7.12.12.1,APP-104,Environmental Statement Appendix 12-1 – Offshore Ornithology Consultation Responses,1,June 2024,
7.12.12.2,APP-105,Environmental Statement Appendix 12-2 - Technical Appendix,1,June 2024,
7.12.12.3,AS-060,Environmental Statement Appendix 12-3a-c - Monthly Abundance (All, Sitting, Flying),2,November 2024,
7.12.12.4,AS-062,Environmental Statement Appendix 12-4a-c - Monthly Densities (All, Sitting, Flying),2,November 2024,
7.12.12.5,AS-064,Environmental Statement Appendix 12-5a-c - Seasonal Peak Abundance (All, Sitting, Flying),2,November 2024,
7.12.12.6,AS-066,Environmental Statement Appendix 12-6a-c - Seasonal Peak Density (All, Sitting, Flying),2,November 2024,
7.12.12.7,AS-068,Environmental Statement Appendix 12-7a-c - Survey Abundances (All, Sitting, Flying),2,November 2024,
7.12.12.8,AS-070,Environmental Statement Appendix 12-8a-c - Survey Densities (All, Sitting, Flying),2,November 2024,
7.12.12.9,APP-112,Environmental Statement Appendix 12-9 - Collision Risk Modelling Outputs,1,June 2024,
7.12.12.10,APP-113,Environmental Statement Appendix 12-10 - Species Distribution Figures,1,June 2024,
7.12.12.11,APP-114,Environmental Statement Appendix 12-11 - Review of Turbines Lighting,1,June 2024,
7.12.12.12,APP-115,Environmental Statement Appendix 12-12 - Seasonal Displacement Matrices Upper Lower C.I. Abundance,1,June 2024,
7.12.12.13,REP6-018,Environmental Statement Appendix 12-13 Population Viability Analyses,3,June 2025,
7.13.13.1,APP-119,Environmental Statement Appendix 13-1 - Commercial Fisheries Consultation Responses,1,June 2024,
7.13.13.2,APP-120,Environmental Statement Appendix 13-2 - Commercial Fisheries Technical Report,1,June 2024,
7.14.14.1,APP-123,Environmental Statement Appendix 14-1 - Shipping and Navigation Consultation Responses,1,June 2024,
7.14.14.2,REP7-054,Environmental Statement Appendix 14-2 - Navigational Risk Assessment,2,June 2025,
7.15.15.1,APP-127,Environmental Statement Appendix 15-1 - Aviation and Radar Consultation Responses,1,June 2024,
7.15.15.2,REP7-058,Environmental Statement Appendix 15-2 - Airspace Analysis and Radar Modelling,2,June 2025,
7.15.15.3,REP4-036,Environmental Statement Appendix 15-3 - Helicopter Access Report,2,April 2025,
7.16.16.1,APP-132,Environmental Statement Appendix 16-1 - Infrastructure and Other Users Consultation Responses,1,June 2024,
7.17.17.1,APP-135,Environment Statement Appendix 17-1 - Offshore Archaeology and Cultural Heritage Consultation Responses,1,June 2024,
7.17.17.2,APP-136,Environmental Statement Appendix 17-2 - Archaeological Assessment of Geophysical Data for Environmental Impact Assessment,1,June 2024,
7.17.17.3,APP-137,Environmental Statement Appendix 17-3 - Palaeolandscapes Assessment of 2022 Marine Geophysical Data,1,June 2024,
7.17.17.4,APP-138,Environmental Statement Appendix 17-4 – Stage 1 Geoarchaeological Review of Geotechnical Data,1,June 2024,
7.17.17.5,APP-139,Environmental Statement Appendix 17-5 - Gazetteer of Recorded Losses,1,June 2024,
7.18.18.1,APP-142,Environmental Statement Appendix 18-1 - Terrestrial Ecology and Ornithology Consultation Responses,1,June 2024,
7.18.18.2,REP7-067,Environmental Statement Appendix 18-2 - Habitat Survey Report,3,June 2025,
7.18.18.3,APP-144,Environmental Statement Appendix 18-3 - Great Crested Newt Report,1,June 2024,
7.18.18.4,APP-145,Environmental Statement Appendix 18-4 - Badger Report - Confidential,1,June 2024,
7.18.18.5,REP7-069,Environmental Statement Appendix 18-5 - Bats Report - Ground Level Tree Assessment,3,June 2025,
7.18.18.6,APP-147,Environmental Statement Appendix 18-6 - Bats Report - Monthly Activity Transects Part 1 of 2,1,June 2024,
7.18.18.6,APP-148,Environmental Statement Appendix 18-6 - Bats Report - Monthly Activity Transects Part 2 of 2,1,June 2024,
7.18.18.7,APP-149,Environmental Statement Appendix 18-7 - Ornithology Overwintering Report Part 1 of 3,1,June 2024,
7.18.18.7,APP-150,Environmental Statement Appendix 18-7 - Ornithology Overwintering Report Part 2 of 3,1,June 2024,
7.18.18.7,APP-151,Environmental Statement Appendix 18-7 - Ornithology Overwintering Report Part 3 of 3,1,June 2024,
7.18.18.8,APP-152,Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 1 of 4,1,June 2024,
7.18.18.8,APP-153,Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 2 of 4,1,June 2024,
7.18.18.8,APP-154,Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 3 of 4,1,June 2024,
17.18.18.8,APP-155,Environmental Statement Appendix 18-8 - Ornithology Breeding Bird Report Part 4 of 4,1,June 2024,
17.18.18.9,REP2-021,Environmental Statement Appendix 18-9 - Water Voles and Otters Report,2,February 2025,
7.18.18.10,REP5-015,Environmental Statement Appendix 18-10 - Biodiversity Net Gain Strategy,2,May 2025,
7.19.19.1,APP-160,Environmental Statement Appendix 19-1 - Geology and Land Quality Consultation Responses,1,June 2024,
7.19.19.2,REP6-023,Environmental Statement Appendix 19-2 – Geo-Environmental Desk Study and Preliminary Risk Assessment Report,2,June 2025,
7.19.19.3,APP-162,Environmental Statement Appendix 19-3 - Onshore Waste Assessment,1,June 2024,
7.20.20.1,APP-165,Environmental Statement Appendix 20-1 - Flood Risk and Hydrology Consultation Responses,1,June 2024,
7.20.20.2,APP-166,Environmental Statement Appendix 20-2 - Geomorphological Baseline Survey Technical Report,1,June 2024,
7.20.20.3,REP5-020,Environmental Statement Appendix 20-3 - Water Environment Regulations Compliance Assessment,4,May 2025,
7.20.20.4,REP7-071,Environmental Statement Appendix 20-4 - Flood Risk Assessment,2,June 2025,
7.21.21.1,APP-171,Environmental Statement Appendix 21-1 - Land Use Consultation Responses,1,June 2024,
7.22.22.1,APP-174,Environmental Statement Appendix 22-1 - Onshore Archaeology and Cultural Heritage Consultation Responses,1,June 2024,
7.22.22.2,APP-175,Environmental Statement Appendix 22-2 - Onshore Archaeological Desk-Based Assessment,1,June 2024,
7.22.22.3,APP-176,Environmental Statement Appendix 22-3 - Assessment of Airborne and Satellite Remote Sensing Data and Map Regression Analysis for Archaeology,1,June 2024,
7.22.22.4,APP-177,Environmental Statement Appendix 22-4 - Heritage Walkover Survey Report,1,June 2024,
7.22.22.5,REP7-076,Environmental Statement Appendix 22-5 - Onshore Infrastructure Settings Assessment,2,June 2025,
7.22.22.6,APP-179,Environmental Statement Appendix 22-6 - Geoarchaeological Desk Based Assessment,1,June 2024,
7.22.22.7,APP-180,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 1 of 9,1,June 2024,
7.22.22.7,APP-181,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 2 of 9,1,June 2024,
7.22.22.7,APP-182,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 3 of 9,1,June 2024,
7.22.22.7,APP-183,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 4 of 9,1,June 2024,
7.22.22.7,APP-184,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 5 of 9,1,June 2024,
7.22.22.7,APP-185,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 6 of 9,1,June 2024,
7.22.22.7,APP-186,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 7 of 9,1,June 2024,
7.22.22.7,APP-187,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 8 of 9,1,June 2024,
7.22.22.7,APP-188,Environmental Statement Appendix 22-7 - Geophysical Assessment Report Part 9 of 9,1,June 2024,
7.22.22.8,APP-189,Environmental Statement Appendix 22-8 - Interim Archaeological Evaluation Report,1,June 2024,
7.22.22.9,APP-190,Environmental Statement Appendix 22-9 - Archaeological and Geoarchaeological Watching Brief and Deposit Model Report,1,June 2024,
7.22.22.10,APP-191,Environmental Statement Appendix 22-10 - Additional Assessment of Airborne and Satellite Remote Sensing Data and Map Regression Analysis for Archaeology,1,June 2024,
7.22.22.11,REP7-078,Environmental Statement Appendix 22- 11 Phase 1 Trenching Report (Part 1 of 4),1,June 2025,
7.22.22.11,REP7-079,Environmental Statement Appendix 22- 11 Phase 1 Trenching Report (Part 2 of 4),1,June 2025,
7.22.22.11,REP7-080,Environmental Statement Appendix 22- 11 Phase 1 Trenching Report (Part 3 of 4),1,June 2025,
7.22.22.11,REP7-081,Environmental Statement Appendix 22-11 Phase 1 Trenching Report (Part 4 of 4),1,June 2025,
7.22.22.12,REP7-082,Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 1 of 6),1,June 2025,
7.22.22.12,REP7-083,Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 2 of 6),1,June 2025,
7.22.22.12,REP7-084,Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 3 of 6),1,June 2025,
7.22.22.12,REP7-085,Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 4 of 6),1,June 2025,
7.22.22.12,REP7-086,Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 5 of 6),1,June 2025,
7.22.22.12,REP7-087,Environmental Statement Appendix 22-12 Full Coverage Geophysical Assessment Report (Part 6 of 6),1,June 2025,
7.22.22.13,REP7-088,Environmental Statement Appendix 22-13 Phase 2 Trenching Report (Part 1of 2),1,June 2025,
7.22.22.13,REP7-089,Environmental Statement Appendix 22-13 Phase 2 Trenching Report (Part 2 of 2),1,June 2025,
7.23.23.1,APP-194,Environmental Statement Appendix 23-1 - Landscape and Visual Impact Assessment Consultation Responses,1,June 2024,
7.24.1,REP7-092,Environmental Statement Appendix 24-2 - Transport Assessment (Revision 3) Part 1 of 2,3,June 2025,
7.24.1,REP7-094,Environmental Statement Appendix 24-2 - Transport Assessment (Revision 3) Part 2 of 2,3,June 2025,
7.24.24.1,APP-197,Environmental Statement Appendix 24-1 - Traffic and Transport Consultation Responses,1,June 2024,
7.24.24.2,REP7-092,Environmental Statement Appendix 24-2 - Transport Assessment Part 1 of 2,3,June 2025,
7.24.24.2,REP7-094,Environmental Statement Appendix 24-2 - Transport Assessment Part 2 of 2,3,June 2025,
7.24.24.3,APP-199,Environmental Statement Appendix 24-3 - Abnormal Indivisible Load Access Report,1,June 2024,
7.24.24.4,APP-200,Environmental Statement Appendix 24-4 - Interactions Between Impacts,1,June 2024,
7.25.25.1,APP-203,Environmental Statement Appendix 25-1 - Noise Consultation Responses,1,June 2024,
7.25.25.2,APP-204,Environmental Statement Appendix 25-2 - Baseline Noise Monitoring,1,June 2024,
7.25.25.3,REP1-021,Environmental Statement Appendix 25-3 - Construction Noise Assessment,2,January 2025,
7.25.25.4,APP-206,Environmental Statement Appendix 25-4 - Construction Road Traffic Noise Assessment,1,June 2024,
7.25.25.5,REP6-031,Environmental Statement Appendix 25-5 - Operational Noise Assessment,2,June 2025,
7.26.26.1,APP-210,Environmental Statement Appendix 26-1 - Air Quality Consultation Responses,1,June 2024,
7.26.26.2,APP-211,Environmental Statement Appendix 26-2 - Construction Dust and Fine Particulate Matter Assessment Methodology,1,June 2024,
7.26.26.3,APP-212,Environmental Statement Appendix 26-3 - Air Quality Assessment Traffic Data,1,June 2024,
7.26.26.4,APP-213,Environmental Statement Appendix 26-4 - Air Quality Assessment - Construction Phase Road Traffic Emissions Receptor Locations,1,June 2024,
7.27.27.1,APP-216,Environmental Statement Appendix 27-1 - Human Health Consultation Responses,1,June 2024,
7.28.28.1,APP-218,Environmental Statement Appendix 28-1 - Socio-economics Consultation Responses,1,June 2024,
7.29.29.1,APP-221,Environmental Statement Appendix 29-1 - Tourism and Recreation Consultation Responses,1,June 2024,
7.30.30.1,APP-223,Environmental Statement Appendix 30-1 - Climate Change Consultation Responses,1,June 2024,
7.30.30.2,REP6-038,Environmental Statement Appendix 30-2 - Greenhouse Gas Assessment Methodology,2,June 2025,
70.30.30.3,APP-225,Environmental Statement Appendix 30-3 - Climate Change Resilience Assessment Methodology,1,June 2024,
70.30.30.4,REP6.040,Environmental Statement Appendix 30-4 - Additional Wake Loss Scenarios,1,June 2025,

2.10,REP7-004,Access to works plan,2,June 2025,
4.2,REP8-010,Book of reference,7,July 2025,
8.20,,Cable statement,6,December 2025,
8.6,,Commitments register,54,December 2025,
8.8,REP7-103,Design and access statement,3,June 2025,
13.8,REP7-124,Disposal Site Plan,2,June 2025,
6.2.3,,Dogger Bank compensation plan,54,October 2025,
6.2.2,,Guillemot compensation plan,9,January 2026,
8.23,,In principle monitoring plan,7,December 2025,
8.26,REP7-119,In principle Site Integrity Plan for the Southern North Sea Special Area of Conservation,4,June 2025,
6.2.1,,Kittiwake compensation plan,8,December 2025,
2.7,REP4-002,Land plans,4,April 2025,
2.3,APP-009,Offshore order limits and grid coordinates plan,1,June 2024,
2.4,REP2-003,Onshore order limits and grid coordinates plan,2,February 2025,
8.9,REP7-105,Outline code of construction practice,5,June 2025,
8.13,REP6-041,Outline construction traffic management plan,4,June 2025,
8.12,REP7-109,Outline drainage strategy,4,June 2025,
8.10,REP7-107,Outline ecological management plan,6,June 2025,
8.28,REP4-056,Outline fisheries liaison and co-existence plan,4,April 2025,
6.2.2.1,,Outline guillemot CIMP,4,December 2025,
6.2.1.2,,Outline kittiwake CIMP,4,December 2025,
8.11,REP4-044,Outline landscape management plan,4,April 2025,
8.25,REP7-117,Outline marine mammal mitigation protocol,5,June 2025,
8.24,REP2-045,Outline offshore operations and maintenance plan,3,February 2025,
8.21,REP2-041,Outline project environmental management plan,2,February 2025,
8.27,REP6-045,Outline scour protection plan,4,June 2025,
8.5,APP-230,Outline skills and employment strategy,1,June 2024,
8.30,REP5-029,Outline vessel traffic monitoring plan,2,May 2025,
8.22,APP-246,Outline written scheme of investigation (offshore),1,June 2024,
8.14,REP4-048,Outline onshore written scheme of investigation,2,April 2025,
2.11,REP7-005,Public rights of way plan,2,June 2025,
2.8,REP7-003,Special category land plan,3,June 2025,
2.12,REP7-006,Streets plan,2,June 2025,
2.18,REP4-004,Tree preservation order and hedgerow plan,6,April 2025,
2.5,REP2-004,Works plans (offshore),4,February 2025,
2.6,REP2-005,Works plans (onshore),4,February 2025,
17.8,REP9-020,Herring Spawning Plan,2,July 2025,
18.5,REP8-045,Cable installation works restricted area plan,1,July 2025,