Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Articles 27, 40 and 49

SCHEDULE 9E+WPROTECTIVE PROVISIONS

PART 1E+WFOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWAGE UNDERTAKERS

1.  For the protection of the utility undertakers referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.E+W

Commencement Information

I1Sch. 9 para. 1 in force at 12.10.2025, see art. 1

2.  In this Part of this Schedule—E+W

“alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;

“apparatus” means—

(a)

in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989(1)), belonging to or maintained by that undertaker;

(b)

in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986(2) for the purposes of gas supply;

(c)

in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that undertaker for the purposes of water supply; and

(d)

in the case of a sewerage undertaker—

(i)

any drain or works vested in the undertaker under the Water Industry Act 1991(3); and

(ii)

any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4)(4) (adoption of sewers and disposal of works) of that Act or an agreement to adopt made under section 104(5) (agreements to adopt sewer, drain or sewage disposal works, at a future date) of that Act,

and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;

“functions” includes powers and duties;

“in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;

“plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and

“utility undertaker” means—

(a)

any licence holder within the meaning of Part 1 of the Electricity Act 1989;

(b)

a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986;

(c)

a water undertaker within the meaning of the Water Industry Act 1991; and

(d)

a sewerage undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 1991,

for the area of the authorised development, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.

Commencement Information

I2Sch. 9 para. 2 in force at 12.10.2025, see art. 1

On street apparatusE+W

3.  This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

Commencement Information

I3Sch. 9 para. 3 in force at 12.10.2025, see art. 1

Apparatus in stopped up public rights of wayE+W

4.—(1) Where any public right of way is stopped up under article 15 (public rights of way – creation, diversion and stopping up), any utility undertaker whose apparatus is in the land in which the public right of way subsists has the same powers and rights in respect of that apparatus in the land in which the public right of way subsists as it enjoyed immediately before the stopping up and the undertaker must grant to the utility undertaker legal easements reasonably satisfactory to the utility undertaker in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of the utility undertaker to require the removal of that apparatus under paragraph 7 or the power of the undertaker to carry out works under paragraph 9.

(2) Regardless of the temporary [F1stopping up,] alteration, diversion or restriction of any street under the powers conferred by article 14 (temporary [F2stopping up] of streets), a utility undertaker is at liberty at all times to take all necessary access across any such stopped up street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that street.

Protective works to buildingsE+W

5.  The undertaker, in the case of the powers conferred by article 23 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.

Commencement Information

I5Sch. 9 para. 5 in force at 12.10.2025, see art. 1

Acquisition of landE+W

6.  Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

Commencement Information

I6Sch. 9 para. 6 in force at 12.10.2025, see art. 1

Removal of apparatusE+W

7.—(1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (6).

(2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question 28 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.

(3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed the utility undertaker must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.

(4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).

(5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 52 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.

(6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that the undertaker desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.

(7) If the utility undertaker fails either reasonably to approve, or to provide reasons for its failure to approve along with an indication of what would be required to make acceptable, any proposed details relating to required removal works under sub-paragraph (2) within 28 days of receiving a notice of the required works from the undertaker, then such details are deemed to have been approved, provided that the undertaker has first taken all reasonable steps to contact the relevant representatives of the utility undertaker in order to elicit such a response.

(8) Any deemed approval under sub-paragraph (7) does not extend to the actual undertaking of the removal works, which remains the sole responsibility of the utility undertaker or its contractors.

Commencement Information

I7Sch. 9 para. 7 in force at 12.10.2025, see art. 1

Facilities and rights for alternative apparatusE+W

8.—(1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance by the utility undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).

(2) In settling those terms and conditions in respect of alternative apparatus to be constructed in the land of the undertaker, the arbitrator will—

(a)give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptions of the alternative apparatus which may be required to prevent interference with the proposed works of the undertaker; and

(b)so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or on the land for which the alternative apparatus is to be substituted.

(3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Commencement Information

I8Sch. 9 para. 8 in force at 12.10.2025, see art. 1

Retained apparatusE+W

9.—(1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 7(2), the undertaker must submit to the utility undertaker in question a plan of the works to be executed.

(2) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works.

(3) Any requirements made by a utility undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.

(4) If a utility undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 3 and 6 to 8 apply as if the removal of the apparatus had been required by the undertaker under paragraph 7(2).

(5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works (unless otherwise agreed with the utility undertaker), a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.

(6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case must give to the utility undertaker in question notice as soon as is reasonably practicable and a plan of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (3) in so far as is reasonably practicable in the circumstances.

Commencement Information

I9Sch. 9 para. 9 in force at 12.10.2025, see art. 1

Expenses and costsE+W

10.—(1) Subject to the following provisions of this paragraph, the undertaker must repay to a utility undertaker all expenses reasonably incurred by that utility undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 7(2).

(2) There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.

(3) If in accordance with the provisions of this Part of this Schedule—

(a)apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the utility undertaker in question by virtue of sub-paragraph (1) must be reduced by the amount of that excess.

(4) For the purposes of sub-paragraph (3)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(5) An amount which apart from this sub-paragraph would be payable to a utility undertaker in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.

Commencement Information

I10Sch. 9 para. 10 in force at 12.10.2025, see art. 1

11.—(1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works referred to in paragraphs 5 or 7(2), or by reason of any subsidence resulting from such development or works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a utility undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any utility undertaker, the undertaker must—

(a)bear and pay the cost reasonably incurred by that utility undertaker in making good such damage or restoring the supply; and

(b)make reasonable compensation to that utility undertaker for any other expenses, loss, damages, penalty or costs incurred by the undertaker,

by reason or in consequence of any such damage or interruption.

(2) The fact that any act or thing may have been done by a utility undertaker on behalf of the undertaker or in accordance with a plan approved by a utility undertaker or in accordance with any requirement of a utility undertaker or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1) unless a utility undertaker fails to carry out and execute the works properly with due care and attention and in a skilful and professional like manner or in a manner that does not accord with the approved plan.

(3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a utility undertaker, its officers, servants, contractors or agents.

(4) A utility undertaker must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

Commencement Information

I11Sch. 9 para. 11 in force at 12.10.2025, see art. 1

CooperationE+W

12.  Where in consequence of the proposed construction of any of the authorised development, the undertaker or a utility undertaker requires the removal of apparatus under paragraph 7(2) or a utility undertaker makes requirements for the protection or alteration of apparatus under paragraph 9, the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the utility undertaker’s undertaking and each utility undertaker must use its best endeavours to co-operate with the undertaker for that purpose.

Commencement Information

I12Sch. 9 para. 12 in force at 12.10.2025, see art. 1

13.  Where, under this Part, the utility undertaker is required to give its consent or approval in respect of any matter, that consent or approval must not be unreasonably withheld or delayed.

Commencement Information

I13Sch. 9 para. 13 in force at 12.10.2025, see art. 1

14.  Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and a utility undertaker in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Commencement Information

I14Sch. 9 para. 14 in force at 12.10.2025, see art. 1

PART 2E+WFOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS

15.  For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator.E+W

Commencement Information

I15Sch. 9 para. 15 in force at 12.10.2025, see art. 1

16.  In this Part of this Schedule—E+W

“the 2003 Act” means the Communications Act 2003(6);

“electronic communications apparatus” has the same meaning as in the electronic communications code;

“the electronic communications code” has the same meaning as in Chapter 1 (electronic communications networks and services) of Part 2 (networks, services and the radio spectrum) of the 2003 Act(7);

“electronic communications code network” means—

(a)

so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 (application of the electronic communications code) of the 2003 Act; and

(b)

an electronic communications network which the undertaker is providing or proposing to provide;

“electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 (application of the electronic communications code) of the 2003 Act; and

“operator” means the operator of an electronic communications code network.

Commencement Information

I16Sch. 9 para. 16 in force at 12.10.2025, see art. 1

17.  The exercise of the powers conferred by article 40 (statutory undertakers) is subject to Part 10 (undertaker’s works affecting electronic communications apparatus) of the electronic communications code.E+W

Commencement Information

I17Sch. 9 para. 17 in force at 12.10.2025, see art. 1

18.—(1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or its construction, or of any subsidence resulting from any of those works—E+W

(a)any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or

(b)there is any interruption in the supply of the service provided by an operator,

the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and make reasonable compensation to that operator for any other expenses, loss, damages, penalty or costs incurred by it, by reason, or in consequence of, any such damage or interruption.

(2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.

(3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

(4) Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 52 (arbitration).

(5) This Part of this Schedule does not apply to—

(a)any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act; or

(b)any damages, or any interruptions, caused by electro-magnetic interference arising from the construction or use of the authorised development.

(6) In respect of the acquisition of rights under or over or use of the operator’s property, the operator must co-operate with the undertaker with a view to avoiding undue delay.

(7) Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Commencement Information

I18Sch. 9 para. 18 in force at 12.10.2025, see art. 1

PART 3E+WFOR THE PROTECTION OF NATIONAL HIGHWAYS

Application etc.E+W

19.—(1) The provisions of this Part of this Schedule apply for the protection of National Highways and have effect unless otherwise agreed in writing between the undertaker and National Highways.

(2) Except where expressly amended by the Order the operation of the powers and duties of National Highways or the Secretary of State under the 1980 Act, the 1984 Act, the 1991 Act, the Transport Act 2000 and the 2015 Regulations shall continue to apply in respect of the exercise of all of National Highways’ statutory functions.

Commencement Information

I19Sch. 9 para. 19 in force at 12.10.2025, see art. 1

InterpretationE+W

20.—(1) Where the terms defined in article 2 (interpretation) of this Order are inconsistent with sub-paragraph (2) the latter prevail.

(2) In this Part of this Schedule—

“as built information” means one electronic copy of the following information—

(a)

as constructed drawings in both PDF and AutoCAD DWG formats for anything designed by the undertaker; in compliance with DMRB GG 184 (Specification for the use of Computer Aided Design) or any successor document;

(b)

list of suppliers and materials used, as well as any relevant test results and CCTV surveys (if required to comply with DMRB standards);

(c)

product data sheets and technical specifications for all materials used;

(d)

as constructed information for any utilities discovered or moved during the works;

(e)

method statements for the works carried out;

(f)

in relation to road lighting, signs, and traffic signals any information required by Series 1300 and 1400 of the Specification for Highway Works or any replacement or modification of it;

(g)

organisation and methods manuals for all products used;

(h)

as constructed programme;

(i)

test results and records as required by the detailed design information and during construction phase of the project;

(j)

a stage 3 road safety audit subject to any exceptions to the road safety audit standard as agreed by the undertaker and National Highways;

(k)

the health and safety file; and

(l)

such other information as is required by National Highways to be used to update all relevant databases and to ensure compliance with National Highway’s Asset Data Management Manual as is in operation at the relevant time.

“the bond sum” means the sum equal to 200% of the cost of the carrying out the specified works (to include all costs plus any commuted sum) or such other sum agreed between the undertaker and National Highways;

“the cash surety” means the sum agreed between the undertaker and National Highways;

“commuted sum” means such sum calculated as provided for in paragraph 34 (commuted sum) of this Part of this Schedule to be used to fund the future cost of maintaining any new National Highways assets or structures or apparatus provided under the Order;

“condition survey” means a survey of the condition of National Highways structures and assets within the Order limits that may be affected by the specified works;

“contractor” means any contractor or subcontractor appointed by the undertaker to carry out the specified works;

“defects period” means the period from the date of the provisional certificate to the date of the final certificate which shall be no less than 12 months from the date of the provisional certificate;

“detailed design information” means such of the following drawings specifications and calculations as are relevant to the development—

(a)

site clearance details;

(b)

boundary, environmental and mitigation fencing;

(c)

road restraints systems and supporting road restraint risk appraisal process assessment;

(d)

drainage and ducting as required by DMRB CD 535 (Drainage asset data and risk management) and DMRB CS 551 (Drainage surveys – standards for Highways);

(e)

earthworks including supporting geotechnical assessments required by DMRB CD 622 (Managing geotechnical risk) and any required strengthened earthworks appraisal form certification;

(f)

pavement, pavement foundations, kerbs, footways and paved areas;

(g)

traffic signs and road markings;

(h)

traffic signal equipment and associated signal phasing and timing detail;

(i)

road lighting (including columns and brackets);

(j)

regime of California Bearing Ratio testing;

(k)

electrical work for road lighting, traffic signs and signals;

(l)

motorway communications as required by DMRB;

(m)

highway structures and any required structural approval in principle;

(n)

landscaping;

(o)

proposed departures from DMRB standards;

(p)

walking, cycling and horse riding assessment and review report;

(q)

stage 1 and stage 2 road safety audits and exceptions agreed;

(r)

utilities diversions;

(s)

topographical survey;

(t)

maintenance and repair strategy in accordance with DMRB GD 304 (Designing health and safety into maintenance) or any replacement or modification of it;

(u)

health and safety information including any asbestos survey required by DMRB GG 105 (Asbestos management) or any successor document; and

(v)

other such information that may be required by National Highways to be used to inform the detailed design of the specified works;

“DBFO contract” means the contract between National Highways and the highway operations and maintenance contractor for the maintenance and operation of parts of the strategic road network which are within the Order limits or any successor or replacement contract that may be current at the relevant time;

“DMRB” means the Design Manual for Roads and Bridges or any replacement or modification of it;

“final certificate” means the certificate relating to those aspects of the specified works that have resulted in any alteration to the strategic road network to be issued by National Highways pursuant to paragraph 32;

“the health and safety file” means the file or other permanent record containing the relevant health and safety information for the authorised development required by the Construction (Design and Management) Regulations 2015 (or such updated or revised regulations as may come into force from time to time);

“highway operations and maintenance contractor” means the contractor appointed by National Highways under the DBFO contract;

“nominated persons” means the undertaker’s representatives or the contractor’s representatives on site during the carrying out of the specified works as notified to National Highways from time to time;

“programme of works” means a document setting out the sequence and timetabling of the specified works;

“provisional certificate” means the certificate of provisional completion relating to those aspects of the specified works that have resulted in any alteration to the strategic road network to be issued by National Highways in accordance with paragraph 28 when it considers the specified works are substantially complete and may be opened for traffic;

“road safety audit” means an audit carried out in accordance with the road safety audit standard;

“road safety audit standard” means DMRB Standard HD GG 119 (Road safety audit) or any replacement or modification of it;

“road space booking” means road space bookings in accordance with National Highways’ Asset Management Operational Requirements (AMOR) including Network Occupancy Management System (NOMS) used to manage road space bookings and network occupancy;

“Specification for Highways Works” means the specification for highways works forming part of the manual of contract documents for highway works published by National Highways and setting out the requirements and approvals procedures for work, goods or materials used in the construction, improvement or maintenance of the strategic road network;

“specified works” means so much of any work, including highway works, street works and signalisation, authorised by this Order including any maintenance of that work, as is on, in, under or over the strategic road network for which National Highways is the highway authority;

“strategic road network” means any part of the road network including trunk roads, special roads or streets for which National Highways is the highway authority including drainage infrastructure, street furniture, verges and vegetation and all other land, apparatus and rights located in, on, over or under the highway;

“utilities” means any pipes wires cables or equipment belonging to any person or body having power or consent to undertake street works under the 1991 Act; and

“winter maintenance” means maintenance of the road surface to deal with snow and ice.

Commencement Information

I20Sch. 9 para. 20 in force at 12.10.2025, see art. 1

GeneralE+W

21.  In respect of any part of the strategic road network that is managed under a DBFO contract both National Highways and the highway operations and maintenance contractor shall have the benefit of this Part of this Schedule but for the purposes of any approvals required under this Part of this Schedule the undertaker shall liaise directly with National Highways.

Commencement Information

I21Sch. 9 para. 21 in force at 12.10.2025, see art. 1

Works outside the Order limitsE+W

24.  If the undertaker proposes to carry out works to the strategic road network that are outside of the Order limits in connection with the authorised development, the undertaker must enter into an agreement with National Highways in respect of the carrying out of those works prior to the commencement of those works.

Commencement Information

I22Sch. 9 para. 24 in force at 12.10.2025, see art. 1

Prior approvals and securityE+W

25.—(1) The specified works must not commence until—

(a)a stage 1 and stage 2 road safety audit has been carried out and all recommendations raised by them or any exceptions are approved by National Highways;

(b)the programme of works has been approved by National Highways;

(c)the detailed design of the specified works comprising of the following details, insofar as considered relevant by National Highways, has been submitted to and approved by National Highways—

(i)the detailed design information, incorporating all recommendations and any exceptions approved by National Highways under sub-paragraph (a);

(ii)details of the proposed road space bookings and at the same time as submitting the relevant details the undertaker shall be entitled to submit its application for road space bookings to National Highways;

(iii)the identity and suitability of the contractor and nominated persons;

(iv)a process for stakeholder liaison, with key stakeholders to be identified and agreed between National Highways and the undertaker;

(v)information demonstrating that the walking, cycling and horse riding assessment and review process undertaken by the undertaker in relation to the specified works has been adhered to in accordance with DMRB GG 142 (Walking, cycling and horse riding assessment and review);

(d)a scheme of traffic management has been submitted by the undertaker and approved by National Highways such scheme to be capable of amendment by agreement between the undertaker and National Highways from time to time;

(e)stakeholder liaison has taken place in accordance with the process for such liaison agreed between the undertaker and National Highways under sub-paragraph (c)(iv) above;

(f)National Highways has approved the audit brief and CVs for all road safety audits and exceptions to items raised in accordance with the road safety audit standard;

(g)the undertaker has agreed the estimate of the commuted sum with National Highways;

(h)the scope of all maintenance operations (routine inspections, incident management, reactive and third party damage) to be carried out by the undertaker during the construction of the specified works (which must include winter maintenance) has been agreed in writing by National Highways;

(i)the undertaker has procured to National Highways collateral warranties in a form approved by National Highways from the contractor and designer of the specified works in favour of National Highways to include covenants requiring the contractor and designer to exercise all reasonable skill care and diligence in designing and constructing the specified works, including in the selection of materials, goods, equipment and plant; and

(j)a condition survey and regime of monitoring of any National Highways assets or structures that National Highways considers will be affected by the specified works, has been agreed in writing by National Highways.

(2) The undertaker must not exercise—

(a)article 4 (maintenance of authorised development);

(b)article 11 (street works);

(c)article 12 (power to alter layout, etc., of streets);

(d)article 13 (stopping up of streets);

(e)article 14 (temporary stopping up of streets);

(f)article 16 (access to works);

(g)article 18 (traffic regulations);

(h)article 22 (discharge of water);

(i)article 23 (protective work to buildings);

(j)article 24 (authority to survey and investigate the land);

(k)article 25 (felling or lopping of trees and removal of hedgerows);

(l)article 27 (compulsory acquisition of land);

(m)article 28 (compulsory acquisition of rights and imposition of restrictive covenants);

[F3(n)article 29A (power to override easements and other rights)]

[F4(o)]article 31 (private rights of way);

[F4(p)]article 34 (acquisition of subsoil or airspace);

[F4(q)]article 36 (temporary use of land for carrying out the authorised development); or

[F4(r)]article 38 (temporary use of land for maintaining the authorised development),

of this Order over any part of the strategic road network or land in which National Highways has an interest without the consent of National Highways, and National Highways may in connection with any such exercise require the undertaker to provide details of any proposed road space bookings and/or submit a scheme of traffic management for National Highways’ approval.

(3) National Highways must prior to the commencement of the specified works or the exercise of any power referenced in sub-paragraph (2) inform the undertaker of the identity of the person who will act as a point of contact on behalf of National Highways for consideration of the information required under sub-paragraph (1) or (2).

(4) Any approval of National Highways required under this paragraph—

(a)must not be unreasonably withheld;

(b)must be given in writing;

(c)shall be deemed to have been refused if neither given nor refused within 2 months of the receipt of the information for approval or, where further particulars are requested by National Highways within 2 months of receipt of the information to which the request for further particulars relates; and

(d)may be subject to any conditions as National Highways considers necessary.

(5) Any change to the identity of the contractor and/or designer of the specified works will be notified to National Highways immediately and details of their suitability to deliver the specified works will be provided on request along with collateral warranties in a form agreed by National Highways.

(6) Any change to the detailed design of the specified works must be approved by National Highways in accordance with sub-paragraph (1).

Textual Amendments

F4Sch. 9 para. 25(2)(n)-(q) renumbered as Sch. 9 para. 25(2)(o)-(r) (21.1.2026) by The Gatwick Airport (Northern Runway Project) Development Consent (Correction) Order 2026 (S.I. 2026/43), art. 1, Sch.

Commencement Information

I23Sch. 9 para. 25 in force at 12.10.2025, see art. 1

Construction of the specified worksE+W

26.—(1) The undertaker must give National Highways 3 months’ notice in writing of the date on which the specified works will start unless otherwise agreed by National Highways.

(2) The undertaker must comply with National Highways’ road space booking procedures prior to and during the carrying out the specified works and no specified works for which a road space booking is required shall commence without a road space booking having first been secured from National Highways.

(3) The specified works must be carried out by the undertaker to the satisfaction of National Highways in accordance with—

(a)the relevant detailed design information and programme of works approved pursuant to paragraph 25(1) (prior approvals and security) or as subsequently varied by agreement between the undertaker and National Highways;

(b)the DMRB, the Manual of Contract Documents for Highway Works, including the Specification for Highway Works, together with all other relevant standards as required by National Highways to include, inter alia; all relevant interim advice notes, the Traffic Signs Manual and the Traffic Signs Regulations and General Directions 2016(8) save to the extent that exceptions from those standards apply which have been approved by National Highways; and

(c)all aspects of the Construction (Design and Management) Regulations 2015(9) or any statutory amendment or variation of the same and in particular the undertaker, as client, must ensure that all client duties (as defined in the said regulations) are undertaken to the satisfaction of National Highways.

(4) The undertaker must ensure that (where possible) without entering the highway the highway is kept free from mud, soil and litter as a result of carrying out the specified works.

(5) The undertaker must permit and must require the contractor to permit at all reasonable times persons authorised by National Highways (whose identity must have been previously notified to the undertaker by National Highways) to gain access to the works pursuant to the Order including all land in which National Highways has an interest for the purposes of inspection and supervision of the works.

(6) If any part of the specified works is constructed—

(a)other than in accordance with the requirements of this Part of this Schedule; or

(b)in a way that causes damage to the highway, highway structure or asset or any other land of National Highways,

National Highways may by notice in writing require the undertaker, at the undertaker’s own expense, to comply promptly with the requirements of this Part of this Schedule or remedy any damage notified to the undertaker under this Part of this Schedule, to the satisfaction of National Highways.

(7) If during the carrying out of the authorised development the undertaker or its appointed contractors or agents causes damage to the strategic road network then National Highways may by notice in writing require the undertaker, at its own expense, to remedy the damage.

(8) If within 28 days of the date on which a notice under sub-paragraph (6) or sub-paragraph (7) is served on the undertaker (or in the event of there being, in the opinion of National Highways, a danger to road users, within such lesser period as National Highways may stipulate), the undertaker has failed to take the steps required by that notice, National Highways may carry out the steps required of the undertaker and may recover any expenditure incurred by National Highways in so doing, such sum to be payable within 30 days of demand.

(9) Nothing in this Part of this Schedule prevents National Highways from carrying out any work or taking any such action as it reasonably believes to be necessary as a result of or in connection with the carrying out or maintenance of the authorised development without prior notice to the undertaker in the event of an emergency or to prevent the occurrence of danger to the public and National Highways may recover any expenditure it reasonably incurs in so doing.

(10) In constructing the specified works, the undertaker must at its own expense divert or protect all utilities and all agreed alterations and reinstatement of highway over existing utilities must be constructed to the satisfaction of National Highways.

(11) Until National Highways issues the provisional certificate the undertaker must carry out all maintenance (including winter maintenance) in accordance with the scope of maintenance operations agreed by National Highways pursuant to paragraph 25(1)(h) (prior approvals and security) and the undertaker must carry out such maintenance at its own cost.

(12) The undertaker must notify National Highways if it fails to complete the specified works in accordance with the agreed programme pursuant to paragraph 25(1)(b) of this Part of this Schedule or suspends the carrying out of any specified work beyond a reasonable period of time and National Highways reserves the right to withdraw any road space booking granted to the undertaker to ensure compliance with its network occupancy requirements.

Commencement Information

I24Sch. 9 para. 26 in force at 12.10.2025, see art. 1

PaymentsE+W

27.—(1) The undertaker must pay to National Highways a sum equal to the costs and expenses which National Highways reasonably and properly incurs (including costs and expenses for using internal or external staff and costs relating to any work which becomes abortive) in relation to the specified works and in relation to any approvals sought under this Order, or otherwise incurred under this Part of this Schedule, including—

(a)the checking and approval of the information required under paragraph 25(1) (prior approvals and security);

(b)the supervision of the specified works;

(c)the checking and approval of the information required to determine approvals under this Order;

(d)all costs in relation to the transfer of any land required for the specified works;

(e)all legal and administrative costs and disbursements incurred by National Highways in connection with the Order and sub-paragraphs (a) to (d); and

(f)any value added tax which is payable by National Highways in respect of such costs and expenses and for which it cannot obtain reinstatement from HM Revenue and Customs,

together comprising “the NH costs”.

(2) The undertaker must pay to National Highways upon demand and prior to such costs being incurred the total costs that National Highways believe will be properly and necessarily incurred by National Highways in undertaking any statutory procedure or preparing and bringing into force any traffic regulation order or orders necessary to carry out or for effectively implementing the authorised development.

(3) National Highways must provide the undertaker with a schedule showing its estimate of the NH costs prior to the commencement of the specified works and the undertaker must pay to National Highways the estimate of the NH costs prior to commencing the specified works and in any event prior to National Highways incurring any cost.

(4) If at any time after the payment referred to in sub-paragraph (3) has become payable, National Highways reasonably believes that the NH costs will exceed the estimated NH costs it may give notice to the undertaker of the amount by which it believes the NH costs will exceed the estimate of the NH costs (the excess) and the undertaker must pay to National Highways within 28 days of the date of the notice a sum equal to the excess.

(5) National Highways must give the undertaker a final account of the NH costs referred to in sub-paragraph (1) within 91 days of the issue of the provisional certificate issued pursuant to paragraph 28(4).

(6) Within 28 days of the issue of the final account—

(a)if the final account shows a further sum as due to National Highways the undertaker must pay to National Highways the sum shown due to it; or

(b)if the account shows that the payment or payments previously made by the undertaker have exceeded the costs incurred by National Highways, National Highways must refund the difference to the undertaker.

(7) If any payment due under any of the provisions of this Part of this Schedule is not made on or before the date on which it falls due the party from whom it was due must at the same time as making the payment pay to the other party interest at 3% above the Bank of England base lending rate from time to time being in force for the period starting on the date upon which the payment fell due and ending with the date of payment of the sum on which interest is payable together with that interest.

Commencement Information

I25Sch. 9 para. 27 in force at 12.10.2025, see art. 1

Provisional certificateE+W

28.—(1) Following the completion of any specified works or prior to reopening any part of the strategic road network following any closure or partial closure, whichever shall be sooner, the undertaker shall notify National Highways who will carry out a site inspection to satisfy itself that the strategic road network is, in its opinion, safe for traffic and the undertaker must comply with any requirements of National Highways following the site inspection.

(2) As soon as the undertaker considers that the provisional certificate may be properly issued it must apply to National Highways for the provisional certificate.

(3) Following an application for a provisional certificate, National Highways must as soon as reasonably practicable—

(a)inspect the specified works; and

(b)provide the undertaker with a written list of works that are required for the provisional certificate to be issued or confirmation that no further works are required for this purpose.

(4) When—

(a)a stage 3 road safety audit for the specified works has been carried out and all recommendations raised including remedial works have (subject to any exceptions agreed) been approved by National Highways;

(b)the specified works incorporating the approved remedial works under sub-paragraph (4)(a) and any further works notified to the undertaker pursuant to sub-paragraph (3)(b) have been completed to the satisfaction of National Highways;

(c)the as built information has been provided to National Highways; and

(d)the undertaker has paid the commuted sum to National Highways,

National Highways must issue the provisional certificate.

(5) On the issue of the provisional certificate the bond sum shall be reduced to 20% of the total bond sum save insofar as any claim or claims have been made against the bond before that date in which case National Highways will retain a sufficient sum to ensure it does not have to meet any costs for or arising from the specified works.

(6) The undertaker must submit a stage 4 road safety audit as required by and in line with the timescales stipulated in the road safety audit standard. The undertaker must comply with the findings of the stage 4 road safety audit and must pay all costs of and incidental to such and provide updated as-built information to National Highways.

Commencement Information

I26Sch. 9 para. 28 in force at 12.10.2025, see art. 1

OpeningE+W

29.  The undertaker must notify National Highways not less than 56 days in advance of the intended date of opening to the public of the strategic road network and the undertaker must notify National Highways of the actual date the strategic road network will be opened to the public no less than 14 days of that date and must not open the strategic road network to the public prior to the expiration of that period.

Commencement Information

I27Sch. 9 para. 29 in force at 12.10.2025, see art. 1

Final condition surveyE+W

30.—(1) The undertaker must, as soon as reasonably practicable after making its application for a provisional certificate pursuant to paragraph 28(2), arrange for the highways structures and assets that were the subject of the condition survey to be re-surveyed and must submit the re-survey to National Highways for its approval. The re-survey will include a renewed geotechnical assessment required by DMRB CD 622 (Managing geotechnical risk) if the specified works include any works beneath the strategic road network.

(2) If the re-surveys carried out pursuant to sub-paragraph (1) indicate that any damage has been caused to a structure or asset, the undertaker must submit a scheme for remedial works in writing to National Highways for its approval in writing and the undertaker must carry out the remedial works at its own cost and in accordance with the scheme submitted.

(3) If the undertaker fails to carry out the remedial work in accordance with the approved scheme, National Highways may carry out the steps required of the undertaker and may recover any expenditure it reasonably incurs in so doing.

(4) National Highways may, at its discretion, at the same time as giving its approval to the re-surveys pursuant to sub-paragraph (1) give notice in writing that National Highways will remedy any damage identified in the re-surveys and National Highways may recover any expenditure it reasonably incurs in so doing.

(5) The undertaker must make available to National Highways upon request copies of any survey or inspection reports produced pursuant to any inspection or survey of any specified work following its completion that the undertaker may from time to time carry out.

Commencement Information

I28Sch. 9 para. 30 in force at 12.10.2025, see art. 1

Defects periodE+W

31.—(1) The undertaker must at its own expense remedy any defects in the strategic road network as are reasonably required by National Highways to be remedied during the defects period. All identified defects must be remedied in accordance with the following timescales—

(a)in respect of matters of urgency, within 24 hours of receiving notification for the same (urgency to be determined at the absolute discretion of National Highways);

(b)in respect of matters which National Highways considers to be serious defects or faults, within 14 days of receiving notification of the same; and

(c)in respect of all other defects notified to the undertaker, within 4 weeks of receiving notification of the same.

(2) Following the issuing of the provisional certificate National Highways has responsibility for routine maintenance of the strategic road network save for any soft landscaping works which must be established and which must thereafter be maintained for a period of 3 years by and at the expense of the undertaker.

Commencement Information

I29Sch. 9 para. 31 in force at 12.10.2025, see art. 1

Final certificateE+W

32.—(1) The undertaker must apply to National Highways for the final certificate no sooner than 12 months from the date of the provisional certificate.

(2) Following receipt of the application for the final certificate, National Highways must as soon as reasonably practicable—

(a)inspect the strategic road network; and

(b)provide the undertaker with a written list of any further works required to remedy or make good any defect or damage in the strategic road network or confirmation that no such works are required for this purpose.

(3) The undertaker must carry out such works notified to it pursuant to sub-paragraph (2).

(4) When National Highways is satisfied that—

(a)any defects or damage arising from defects during the defects period and any defects notified to the undertaker pursuant to sub-paragraph (2) and any remedial works required as a result of the stage 4 road safety audit have been made good to the satisfaction of National Highways; and

(b)the NH costs have been paid to National Highways in full,

National Highways must issue the final certificate after which the bond is to be released in full.

(5) The undertaker must pay to National Highways within 28 days of demand the costs reasonably incurred by National Highways in identifying the defects and supervising and inspecting the undertaker’s work to remedy the defects that it is required to remedy pursuant to these provisions.

Commencement Information

I30Sch. 9 para. 32 in force at 12.10.2025, see art. 1

SecurityE+W

33.  The specified works must not commence until—

(a)the undertaker procures that the specified works are secured by a bond from a bondsman first approved by National Highways in the agreed form (as set out below) between the undertaker and National Highways to indemnify National Highways against all losses, damages, costs or expenses arising from any breach of any one or more of the obligations of the undertaker in respect of the exercise of the powers under this Order and the specified works under the provisions of this Part of this Schedule provided that the maximum liability of the bond must not exceed the bond sum; or where agreed by National Highways; and

(b)the undertaker has provided the cash surety which may be utilised by National Highways in the event of the undertaker failing to meet its obligations to make payments under paragraph 27 (payments) or to carry out works the need for which arises from a breach of one or more of the obligations of the undertaker under the provisions of this Part of this Schedule or a combination of a bond and cash surety together totalling 200%.

Commencement Information

I31Sch. 9 para. 33 in force at 12.10.2025, see art. 1

Commuted sumE+W

34.—(1) National Highways must provide to the undertaker an estimate of the commuted sum, calculated in accordance with FS Guidance S278 Commuted Lump Sum Calculation Method dated 18 January 2010 or any successor guidance, prior to the commencement of the specified works.

(2) The undertaker must pay to National Highways the commuted sum prior to the issue of the provisional certificate.

Commencement Information

I32Sch. 9 para. 34 in force at 12.10.2025, see art. 1

InsuranceE+W

35.  Prior to the commencement of the specified works the undertaker must effect public liability insurance with an insurer in the minimum sum of £10,000,000.00 (ten million pounds) in respect of any one claim against any legal liability for damage loss or injury to any property or any person as a direct result of the execution of specified works or use of the strategic road network by the undertaker.

Commencement Information

I33Sch. 9 para. 35 in force at 12.10.2025, see art. 1

IndemnityE+W

36.  The undertaker fully indemnifies National Highways from and against all costs, claims, expenses, damages, losses and liabilities suffered by National Highways arising from the construction, maintenance or use of the specified works or exercise of or failure to exercise any power under this Order within 14 days of demand save for any loss arising out of or in consequence of any negligent act or default of National Highways.

Commencement Information

I34Sch. 9 para. 36 in force at 12.10.2025, see art. 1

Maintenance of the specified worksE+W

37.—(1) The undertaker must, prior to the commencement of any works of maintenance to the specified works, give National Highways 28 days’ notice in writing of the date on which those works will start unless otherwise agreed by National Highways, acting reasonably.

(2) If, for the purposes of maintaining the specified works, the undertaker needs to occupy any road space, the undertaker must comply with National Highways’ road space booking requirements and no maintenance of the specified works for which a road space booking is required shall commence without a road space booking having first been secured.

(3) The undertaker must comply with any requirements that National Highways may notify to the undertaker, such requirements to be notified to the undertaker not less than 7 days in advance of the planned commencement date of the maintenance works.

(4) The provisions of paragraph 29 (opening) shall apply to the opening of any part of the strategic road network following occupation of any road space under this paragraph.

Commencement Information

I35Sch. 9 para. 37 in force at 12.10.2025, see art. 1

LandE+W

38.—(1) Following the issue of the final certificate pursuant to paragraph 32(4) (final certificate) National Highways may serve notice on the undertaker that it wishes to take a freehold transfer of land within the extent of strategic road network boundary which is not in the ownership of National Highways but has been acquired by the undertaker for the purposes of carrying out the specified works.

(2) If the undertaker receives notice under sub-paragraph (1) then the undertaker must effect a freehold transfer of the land which is the subject of the notice and complete such transfer as soon as reasonably practicable at no cost to National Highways.

(3) The undertaker must not under the powers of this Order—

(a)acquire or use land forming part of;

(b)acquire new or existing rights over; or

(c)seek to impose or extinguish any restrictive covenants over;

any of the strategic road network or land owned by National Highways, or extinguish any existing rights of or interfere with apparatus of National Highways in respect of any third party property, except with the consent of National Highways by written request to legalservicesinbox@nationalhighways.co.uk.

F5(4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Commencement Information

I36Sch. 9 para. 38 in force at 12.10.2025, see art. 1

Expert determinationE+W

39.—(1) Article 52 (arbitration) of the Order does not apply to this Part of this Schedule.

(2) Any difference under this Part of this Schedule may be referred to and settled by a single independent and suitable person who holds appropriate professional qualifications and is a member of a professional body relevant to the matter in dispute acting as an expert, such person to be agreed by the differing parties or, in the absence of agreement, identified by the President of the Institution of Civil Engineers.

(3) On notification by either party of a dispute, the parties must jointly instruct an expert within 14 days of notification of the dispute.

(4) All parties involved in settling any difference must use best endeavours to do so within 21 days from the date that an expert is appointed.

(5) The expert must—

(a)invite the parties to make submission to the expert in writing and copied to the other party to be received by the expert within 7 days of the expert’s appointment;

(b)permit a party to comment on the submissions made by the other party within 7 days of receipt of the submission;

(c)issue a decision within 7 days of receipt of the submissions under sub-paragraph (b); and

(d)give reasons for the decision.

(6) Any determination by the expert is final and binding, except in the case of manifest error in which case the difference that has been subject to expert determination may be referred to and settled by arbitration under article 52 (arbitration).

(7) The fees of the expert are payable by the parties in such proportions as the expert may determine or, in the absence of such determination, equally.

FORM OF BOND

BY THIS BOND [ ] [(Company Regn No )] whose registered office is situated at [ ] (“the undertaker”) and [ ] [(Company Regn No )] whose registered office is situated at [ ] (“the Surety”) are jointly and severally bound to [ ] of [ ] (“the [ ]”) this [ ] day of [ ] 202[ ] in the sum of [ ] pounds (£[Surety Sum]) to the payment of which sum the undertaker and the Surety hereby jointly and severally bind themselves their successors and assigns.

WHEREAS under a Development Consent Order known as [ ] (“the DCO”) the undertaker is empowered to commence execute perform and complete the highway works mentioned therein in such manner and within such time and subject to such conditions and stipulations as are particularly specified and set forth in the DCO and also to pay to National Highways such sums as are therein provided NOW THE CONDITIONS of this Bond are such that if the undertaker shall duly observe and perform all the terms provisions covenants conditions and stipulations of Part [ ] of Schedule [ ] to the DCO on the undertaker’s part to be observed and performed according to the true purport intent and meaning thereof or if on default by the undertaker the Surety shall satisfy and discharge the damages sustained by National Highways thereby up to the amount of this Bond then this obligation shall be null and void but otherwise shall be and remain in full force and effect in accordance with the provisions of the DCO (and including any reductions as provided for in the DCO) but no allowance of time by National Highways under the DCO nor any forbearance or forgiveness in or in respect of any matter or thing concerning the DCO on the part of National Highways shall in any way release the Surety from any liability under this Bond.

It is hereby agreed that this Bond will be reduced and released in accordance with paragraph [ ] and [ ] of Part [ ] of Schedule [ ] of the DCO.

[Attestation]

Commencement Information

I37Sch. 9 para. 39 in force at 12.10.2025, see art. 1

PART 4E+WFOR THE PROTECTION OF RAILWAY INTERESTS

40.  The provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and Network Rail and, in the case of paragraph 54 of this Part of this Schedule any other person on whom rights or obligations are conferred by that paragraph.E+W

Commencement Information

I38Sch. 9 para. 40 in force at 12.10.2025, see art. 1

41.  In this Part of this Schedule—E+W

“asset protection agreement” means an agreement to regulate the construction and maintenance of the specified work in a form prescribed from time to time by Network Rail;

“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;

“the engineer” means an engineer appointed by Network Rail for the purposes of this Order;

“network licence” means the network licence, as the same is amended from time to time, granted to Network Rail Infrastructure Limited by the Secretary of State in exercise of their powers under section 8 (licences) of the Railways Act 1993(10);

“Network Rail” means Network Rail Infrastructure Limited (company number 02904587, whose registered office is at Waterloo General Office, London, SE1 8SW) and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 of the Companies Act 2006(11)) the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited and any successor to Network Rail Infrastructure Limited’s railway undertaking;

“plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;

“railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station lease;

“railway property” means any railway belonging to Network Rail and—

(a)

any station, land, works, apparatus and equipment belonging to Network Rail or connected with any such railway; and

(b)

any easement or other property interest held or used by Network Rail or a tenant or licensee of Network Rail for the purposes of such railway or works, apparatus or equipment;

“regulatory consents” means any consent or approval required under—

(a)

the Railways Act 1993;

(b)

the network licence; and/or

(c)

any other relevant statutory or regulatory provisions;

by either the Office of Rail and Road or the Secretary of State for Transport or any other competent body including change procedures and any other consents, approvals of any access or beneficiary that may be required in relation to the authorised development;

“specified work” means so much of any of the authorised development as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property and includes the maintenance of such works under the powers conferred by article 4 (maintenance of authorised development) in respect of such works; and

“undertaker” has the same meaning as in article 2 (interpretation) of this Order.

Commencement Information

I39Sch. 9 para. 41 in force at 12.10.2025, see art. 1

42.—(1) Where under this Part of this Schedule Network Rail is required to give its consent or approval in respect of any matter, that consent or approval is subject to the condition that Network Rail complies with any relevant railway operational procedures and any obligations under its network licence or under statute.E+W

(2) In so far as any specified work or the acquisition or use of railway property is or may be subject to railway operational procedures, Network Rail must—

(a)co-operate with the undertaker with a view to avoiding undue delay and securing conformity as between any plans approved by the engineer and requirements emanating from those procedures; and

(b)use their reasonable endeavours to avoid any conflict arising between the application of those procedures and the proper implementation of the authorised development pursuant to this Order.

Commencement Information

I40Sch. 9 para. 42 in force at 12.10.2025, see art. 1

43.—(1) The undertaker must not exercise the powers conferred by—E+W

(a)article 3 (development consent etc. granted by the Order);

(b)article 4 (maintenance of authorised development);

(c)article 16 (access to works)

(d)article 22 (discharge of water);

(e)article 24 (authority to survey and investigate the land);

(f)article 25 (felling or lopping of trees and removal of hedgerows);

(g)article 27 (compulsory acquisition of land);

(h)article 28 (compulsory acquisition of rights and imposition of restrictive covenants);

[F6(i)article 29A (power to override easements and other rights)]

[F7(j)]article 31 (private rights of way);

[F7(k)]article 34 (acquisition of subsoil or airspace only);

[F7(l)]article 35 (rights under or over streets);

[F7(m)]article 36 (temporary use of land for carrying out the authorised development);

[F7(n)]article 38 (temporary use of land for maintaining the authorised development);

F8[F7(o)]. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

[F7(p)]article 45 (use of airspace within the Order land);

[F7(q)]the powers conferred by section 11(3)(12) (power of entry) of the 1965 Act;

[F7(r)]the powers conferred by section 203 (power to override easements and other rights) of the Housing and Planning Act 2016(13);

[F7(s)]the powers conferred by section 172(14) (right to enter and survey land) of the Housing and Planning Act 2016; and

[F7(t)]any powers under in respect of the temporary possession of land under the Neighbourhood Planning Act 2017(15);

in respect of any railway property unless the exercise of such powers is with the consent of Network Rail.

(2) The undertaker must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Network Rail.

(3) The undertaker must not exercise the powers conferred by sections 271 (extinguishment of rights of statutory undertakers: preliminary notices) or 272 (extinguishment of rights of telecommunications code system operators: preliminary notices) of the 1990 Act, [F9article 29A (power to override easements and other rights),] article 31 (private rights of way) or article 40 (statutory undertakers), in relation to any right of access of Network Rail to railway property, but such right of access may be diverted with the consent of Network Rail.

(4) The undertaker must not under the powers of this Order acquire or use or acquire new rights over, or seek to impose any restrictive covenants over, any railway property, or extinguish any existing rights of Network Rail in respect of any third party property, except with the consent of Network Rail.

(5) The undertaker must not under the powers of this Order do anything which would result in railway property being incapable of being used or maintained or which would affect the safe running of trains on the railway.

(6) Where Network Rail is asked to give its consent pursuant to this paragraph, such consent must not be unreasonably withheld or delayed but may be given subject to reasonable conditions but it shall never be unreasonable to withhold consent for reasons of operational or railway safety (such matters to be in Network Rail’s absolute discretion).

(7) The undertaker must enter into an asset protection agreement, and where required prior to the carrying out of any specified work (including but not limited to any works referred to in paragraphs (a) – (o) in the definition of “commence” in article 2 (interpretation) forming part, or carried out for the purposes, of any specified work).

44.—(1) The undertaker must before commencing construction of any specified work supply to Network Rail proper and sufficient plans of that work for the reasonable approval of the engineer and the specified work must not be commenced except in accordance with such plans as have been approved in writing by the engineer or settled by arbitration in accordance with article 52 (arbitration) of this Order.E+W

(2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld, and if by the end of the period of 28 days beginning with the date on which such plans have been supplied to Network Rail the engineer has not intimated their disapproval of those plans and the grounds of such disapproval the undertaker may serve upon the engineer written notice requiring the engineer to intimate approval or disapproval within a further period of 28 days beginning with the date upon which the engineer receives written notice from the undertaker. If by the expiry of the further 28 days the engineer has not intimated approval or disapproval, the engineer shall be deemed to have approved the plans as submitted.

(3) If by the end of the period of 28 days beginning with the date on which written notice was served upon the engineer under sub-paragraph (2), Network Rail gives notice to the undertaker that Network Rail desires itself to construct any part of a specified work which in the opinion of the engineer will or may affect the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertaker desires such part of the specified work to be constructed, Network Rail must construct it without unnecessary delay on behalf of and to the reasonable satisfaction of the undertaker in accordance with the plans approved or deemed to be approved or settled under this paragraph, and under the supervision (where appropriate and if given) of the undertaker.

(4) When signifying their approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in the engineer’s opinion should be carried out before the commencement of the construction of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of the railways of Network Rail or the services of operators using the same (including any relocation de-commissioning and removal of works, apparatus and equipment necessitated by a specified work and the comfort and safety of passengers who may be affected by the specified works), and such protective works as may be reasonably necessary for those purposes must be constructed by Network Rail or by the undertaker, if Network Rail so desires, and such protective works must be carried out at the expense of the undertaker in either case without unnecessary delay and the undertaker must not commence the construction of the specified works until the engineer has notified the undertaker that the protective works have been completed to their reasonable satisfaction.

Commencement Information

I42Sch. 9 para. 44 in force at 12.10.2025, see art. 1

45.—(1) Any specified work and any protective works to be constructed by virtue of paragraph 5(4) must, when commenced, be constructed—E+W

(a)without unnecessary delay in accordance with the plans approved or deemed to have been approved or settled under paragraph 44;

(b)under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer;

(c)in such manner as to cause as little damage as is possible to railway property; and

(d)so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway of Network Rail or the traffic thereon and the use by passengers of railway property.

(2) If any damage to railway property or any such interference or obstruction is caused by the carrying out of, or in consequence of the construction of a specified work, the undertaker must, notwithstanding any such approval, make good such damage and must pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.

(3) Nothing in this Part of this Schedule imposes any liability on the undertaker with respect to any damage, costs, expenses or loss attributable to the negligence of Network Rail or its servants, contractors or agents or any liability on Network Rail with respect to any damage, costs, expenses or loss attributable to the negligence of the undertaker or its servants, contractors or agents.

Commencement Information

I43Sch. 9 para. 45 in force at 12.10.2025, see art. 1

46.  The undertaker must—E+W

(a)at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and

(b)supply the engineer with all such information as they may reasonably require with regard to a specified work or the method of constructing it.

Commencement Information

I44Sch. 9 para. 46 in force at 12.10.2025, see art. 1

47.  Network Rail must at all times afford reasonable facilities to the undertaker and its agents for access to any works carried out by Network Rail under this Part of this Schedule during their construction and must supply the undertaker with such information as it may reasonably require with regard to such works or the method of constructing them.E+W

Commencement Information

I45Sch. 9 para. 47 in force at 12.10.2025, see art. 1

48.—(1) If any permanent or temporary alterations or additions to railway property are reasonably necessary in consequence of the construction or completion of a specified work in order to ensure the safety of railway property or the continued safe operation of the railway of Network Rail, such alterations and additions may be carried out by Network Rail and if Network Rail gives to the undertaker 56 days’ notice (or in the event of an emergency or safety critical issue such notice as is reasonable in the circumstances) of its intention to carry out such alterations or additions (which must be specified in the notice), the undertaker must pay to Network Rail the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations or additions.E+W

(2) If during the construction of a specified work by the undertaker, Network Rail gives notice to the undertaker that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertaker decides that part of the specified work is to be constructed, Network Rail must assume construction of that part of the specified work and the undertaker must, notwithstanding any such approval of a specified work under paragraph 44(3), pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work.

(3) The engineer must, in respect of the capitalised sums referred to in this paragraph and paragraph 49(a) provide such details of the formula by which those sums have been calculated as the undertaker may reasonably require.

(4) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the undertaker to Network Rail under this paragraph.

Commencement Information

I46Sch. 9 para. 48 in force at 12.10.2025, see art. 1

49.  The undertaker must repay to Network Rail all reasonable fees, costs, charges and expenses reasonably incurred by Network Rail—E+W

(a)in constructing any part of a specified work on behalf of the undertaker as provided by paragraph 44(3) or in constructing any protective works under the provisions of paragraph 44(4) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;

(b)in respect of the approval by the engineer of plans submitted by the undertaker and the supervision by the engineer of the construction of a specified work;

(c)in respect of the employment or procurement of the services of any inspectors, signallers, watch-persons and other persons whom it is reasonably necessary to appoint for inspecting, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work;

(d)in respect of any special traffic working resulting from any speed restrictions which may in the opinion of the engineer require to be imposed by reason or in consequence of the construction or failure of a specified work or from the substitution or diversion of services which may be reasonably necessary for the same reason; and

(e)in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or in consequence of the construction or failure of a specified work.

Commencement Information

I47Sch. 9 para. 49 in force at 12.10.2025, see art. 1

50.—(1) In this paragraph-E+W

(a)“EMI” means, subject to sub-paragraph (2), electromagnetic interference with Network Rail apparatus generated by the operation of the authorised development where such interference is of a level which adversely affects the safe operation of Network Rail’s apparatus; and

(b)“Network Rail’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised development) which are owned or used by Network Rail for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.

(2) This paragraph applies to EMI only to the extent that such EMI is not attributable to any change to Network Rail’s apparatus carried out after approval of plans under paragraph 44(1) for the relevant part of the authorised development giving rise to EMI (unless the undertaker has been given notice in writing before the approval of those plans of the intention to make such change).

(3) Subject to sub-paragraph (5), the undertaker must in the design and construction of the authorised development take all measures necessary to prevent EMI and must establish with Network Rail (both parties acting reasonably) appropriate arrangements to verify their effectiveness.

(4) In order to facilitate the undertaker’s compliance with sub-paragraph (3)—

(a)the undertaker must consult with Network Rail as early as reasonably practicable to identify all Network Rail’s apparatus which may be at risk of EMI, and thereafter must continue to consult with Network Rail (both before and after formal submission of plans under paragraph 44(1)) in order to identify all potential causes of EMI and the measures required to eliminate them;

(b)Network Rail must make available to the undertaker all information in the possession of Network Rail reasonably requested by the undertaker in respect of Network Rail’s apparatus identified pursuant to sub-paragraph (a); and

(c)Network Rail must allow the undertaker reasonable facilities for the inspection of Network Rail’s apparatus identified pursuant to sub-paragraph (a).

(5) In any case where it is established that EMI can only reasonably be prevented by modifications to Network Rail’s apparatus, Network Rail must not withhold its consent unreasonably to modifications of Network Rail’s apparatus, but the means of prevention and the method of their execution must be selected in the reasonable discretion of Network Rail, and in relation to such modifications paragraph 44(1) has effect subject to this sub-paragraph.

(6) Prior to the commencement of operation of the authorised development the undertaker shall test the use of the authorised development in a manner that shall first have been agreed with Network Rail and if, notwithstanding any measures adopted pursuant to sub-paragraph (3), the testing of the authorised development causes EMI then the undertaker must immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) the undertaker’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5)) to Network Rail’s apparatus.

(7) In the event of EMI having occurred—

(a)the undertaker must afford reasonable facilities to Network Rail for access to the undertaker’s apparatus in the investigation of such EMI;

(b)Network Rail must afford reasonable facilities to the undertaker for access to Network Rail’s apparatus in the investigation of such EMI;

(c)Network Rail must make available to the undertaker any additional material information in its possession reasonably requested by the undertaker in respect of Network Rail’s apparatus or such EMI; and

(d)the undertaker shall not allow the use or operation of the authorised development in a manner that has caused or will cause EMI until measures have been taken in accordance with this paragraph to prevent EMI occurring.

(8) Where Network Rail approves modifications to Network Rail’s apparatus pursuant to sub- paragraphs (5) or (6)—

(a)Network Rail must allow the undertaker reasonable facilities for the inspection of the relevant part of Network Rail’s apparatus; and

(b)any modifications to Network Rail’s apparatus approved pursuant to those sub-paragraphs must be carried out and completed by the undertaker in accordance with paragraph 45.

(9) To the extent that it would not otherwise do so, the indemnity in paragraph 54(1) applies to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail’s apparatus) or in consequence of any EMI to which sub- paragraph (6) applies.

(10) For the purpose of paragraph 49(a) any modifications to Network Rail’s apparatus under this paragraph is deemed to be protective works referred to in that paragraph.

(11) In relation to any dispute arising under this paragraph the reference in article 52 (arbitration) to the Institution of Civil Engineers shall be read as a reference to the Institution of Engineering and Technology.

Commencement Information

I48Sch. 9 para. 50 in force at 12.10.2025, see art. 1

51.  If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the undertaker informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the undertaker must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.E+W

Commencement Information

I49Sch. 9 para. 51 in force at 12.10.2025, see art. 1

52.  The undertaker must not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it has first consulted Network Rail and it must comply with Network Rail’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.E+W

Commencement Information

I50Sch. 9 para. 52 in force at 12.10.2025, see art. 1

53.  Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the undertaker, be repaid by the undertaker to Network Rail.E+W

Commencement Information

I51Sch. 9 para. 53 in force at 12.10.2025, see art. 1

54.—(1) The undertaker must pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Part of this Schedule (subject to article 48 (no double recovery)) which may be occasioned to or reasonably incurred by Network Rail—E+W

(a)by reason of the construction, maintenance or operation of a specified work or the failure thereof; or

(b)by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon a specified work;

(c)by reason of any act or omission of the undertaker or any person in its employ or of its contractors or others whilst accessing to or egressing from the authorised development;

(d)in respect of any damage caused to or additional maintenance required to, railway property or any such interference or obstruction or delay to the operation of the railway as a result of access to or egress from the authorised development by the undertaker or any person in its employ or of its contractors or others; or

(e)in respect of costs incurred by Network Rail in complying with any railway operational procedures or obtaining any regulatory consents which procedures are required to be followed or consents obtained to facilitate the carrying out or operation of the authorised development;

and the undertaker must indemnify and keep indemnified Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission; and the fact that any act or thing may have been done by Network Rail on behalf of the undertaker or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision shall not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the undertaker from any liability under the provisions of this sub-paragraph.

(2) Network Rail must—

(a)give the undertaker reasonable written notice of any such claims or demands;

(b)not make any settlement or compromise of such a claim or demand without the prior consent of the undertaker; and

(c)take such steps as are within its control and are reasonable in the circumstances to mitigate any liabilities relating to such claims or demands.

(3) The sums payable by the undertaker under sub-paragraph (1) shall if relevant include a sum equivalent to the relevant costs.

(4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail must promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (3) which relates to the relevant costs of that train operator.

(5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs shall, in the event of default, be enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub-paragraph (4).

(6) In this paragraph—

(a)“the relevant costs” means the costs, losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any specified work including but not limited to any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in sub-paragraph (1); and

(b)“train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 (licences) of the Railways Act 1993(16)

Commencement Information

I52Sch. 9 para. 54 in force at 12.10.2025, see art. 1

55.  Network Rail must, on receipt of a request from the undertaker, from time to time provide the undertaker free of charge with written estimates of the costs, charges, expenses and other liabilities for which the undertaker is or will become liable under this Part of this Schedule (including the amount of the relevant costs mentioned in paragraph 54) and with such information as may reasonably enable the undertaker to assess the reasonableness of any such estimate or claim made or to be made pursuant to this Part of this Schedule (including any claim relating to those relevant costs).E+W

Commencement Information

I53Sch. 9 para. 55 in force at 12.10.2025, see art. 1

56.  In the assessment of any sums payable to Network Rail under this Part of this Schedule there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the undertaker under this Part of this Schedule or increasing the sums so payable.E+W

Commencement Information

I54Sch. 9 para. 56 in force at 12.10.2025, see art. 1

57.  The undertaker and Network Rail may, subject in the case of Network Rail to compliance with the terms of its network licence, enter into, and carry into effect, agreements for the transfer to the undertaker of—E+W

(a)any railway property shown on the works and land plans and described in the book of reference;

(b)any lands, works or other property held in connection with any such railway property; and

(c)any rights and obligations (whether or not statutory) of Network Rail relating to any railway property or any lands, works or other property referred to in this paragraph.

Commencement Information

I55Sch. 9 para. 57 in force at 12.10.2025, see art. 1

58.  Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part I (the provision of railway services) of the Railways Act 1993.E+W

Commencement Information

I56Sch. 9 para. 58 in force at 12.10.2025, see art. 1

59.  The undertaker must give written notice to Network Rail if any application is proposed to be made by the undertaker for the Secretary of State’s consent, under article 8 (consent to transfer benefit of Order) of this Order and any such notice must be given no later than 28 days before any such application is made and must describe or give (as appropriate)—E+W

(a)the nature of the application to be made;

(b)the extent of the geographical area to which the application relates; and

(c)the name and address of the person acting for the Secretary of State to whom the application is to be made.

Commencement Information

I57Sch. 9 para. 59 in force at 12.10.2025, see art. 1

60.  The undertaker must no later than 28 days from the date that the plans submitted to and certified by the Secretary of State in accordance with article 50 (certification of documents etc.) are certified by the Secretary of State, provide a set of those plans to Network Rail in a format specified by Network Rail.E+W

Commencement Information

I58Sch. 9 para. 60 in force at 12.10.2025, see art. 1

PART 5E+WFOR THE PROTECTION OF SOUTHERN GAS NETWORKS PLC AS GAS UNDERTAKER

ApplicationE+W

61.  For the protection of SGN the following provisions will, unless otherwise agreed in writing between the undertaker and SGN, have effect.

Commencement Information

I59Sch. 9 para. 61 in force at 12.10.2025, see art. 1

InterpretationE+W

62.  In this Part of this Schedule—

“alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of SGN to enable SGN to fulfil its statutory functions in a manner no less efficient than previously;

“apparatus” means any gas mains, pipes, pressure governors, ventilators, cathodic protections, cables or other apparatus belonging to or maintained by SGN for the purposes of gas distribution together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of SGN for the purposes of transmission, distribution and/or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;

“authorised works” has the same meaning as is given to the term “authorised development” in article 2 (interpretation) of this Order and includes any associated development authorised by the Order and for the purposes of this Part of this Schedule includes the use and maintenance of the authorised works and construction of any works authorised by this Schedule;

“emergency works” means works whose execution at the time when they are executed is required in order to put an end to, or to prevent the occurrence of, circumstances then existing or imminent (or which the person responsible for the works believes on reasonable grounds to be existing or imminent) which are likely to cause danger to persons or property. Where works comprise items some of which fall within this definition, the expression “emergency works” shall be taken to include such of the items as do not fall within that definition as cannot reasonably be severed from those that do;

“functions” includes powers and duties;

“ground mitigation scheme” means a scheme approved by SGN (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;

“ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for SGN’s approval a ground mitigation scheme;

“ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;

“in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;

“maintain” and “maintenance” includes the ability and right to do any of the following in relation to any apparatus or alternative apparatus of SGN including retain, lay, construct, inspect, maintain, protect, use, access, replace, renew, decommission or render unusable or remove the apparatus;

“plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary to properly and sufficiently describe and assess the works to be executed;

“replacement rights” means rights conferred by way of a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary and/or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;

“rights” includes rights and restrictive covenants, and in relation to decommissioned apparatus the surrender of rights, release of liabilities and transfer of decommissioned apparatus;

“SGN” means Southern Gas Networks plc or its successors in title or successor bodies and/or any successor as a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986(17).

“specified works” means any of the authorised works or activities undertaken in association with the authorised works which—

(a)

will or may be situated over, or within 15 metres measured in any direction of, any apparatus the removal of which has not been required by the undertaker under paragraph 67(2) (removal of apparatus) or otherwise; and/or

(b)

may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 67(2) or otherwise;

“undertaker” means the undertaker as defined in article 2 (interpretation) of this Order.

Commencement Information

I60Sch. 9 para. 62 in force at 12.10.2025, see art. 1

On street apparatusE+W

63.—(1) This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and SGN are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act, except for—

(a)paragraphs 64 (apparatus of SGN in stopped up streets), 69 (retained apparatus: protection of SGN) and 70 (expenses) of this Part of this Schedule; and

(b)paragraphs 67 (removal of apparatus) and 68 (facilities and rights for alternative apparatus) of this Part of this Schedule in so far as sub-paragraph (2) applies,

which will apply in respect of the exercise of all or any powers under the Order affecting the rights and apparatus of SGN.

(2) Paragraphs 67 and 68 of this Part of this Schedule apply to diversions even where carried out under the 1991 Act, in circumstances where any apparatus is diverted from an alignment within the existing adopted public highway but not wholly replaced within the existing adopted public highway.

(3) Section 85 (sharing of cost of necessary measures) of the 1991 Act in relation to cost sharing and the regulations made thereunder is not to apply in relation to any diversion of apparatus of SGN under the 1991 Act.

Commencement Information

I61Sch. 9 para. 63 in force at 12.10.2025, see art. 1

Apparatus of SGN in stopped up streetsE+W

64.—(1) Without prejudice to the generality of any other protection afforded to SGN elsewhere in the Order, where any street is stopped up under article 13 (stopping up of streets), if SGN has any apparatus in the street or accessed via that street SGN will be entitled to the same rights in respect of such apparatus as it enjoyed immediately before the stopping up and the undertaker will grant to SGN, or will procure the granting to SGN of, legal easements reasonably satisfactory to SGN in respect of such apparatus and access to it prior to the stopping up of any such street or highway but nothing in this paragraph is to affect any right of the undertaker or of SGN to require the removal of that apparatus under paragraph 67 (removal of apparatus).

(2) Notwithstanding the temporary closure or diversion of any street under the powers of article 14 (temporary stopping up of streets), SGN will be at liberty at all times to take all necessary access across any such stopped up street and/or to execute and do all such works and things in, upon or under any such street as it would have been entitled to do immediately before such temporary stopping up or diversion in respect of any apparatus which at the time of the stopping up or diversion was in that street.

Commencement Information

I62Sch. 9 para. 64 in force at 12.10.2025, see art. 1

Protective works to buildingsE+W

65.  The undertaker, in the case of the powers conferred by article 23 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus without the written consent of SGN.

Commencement Information

I63Sch. 9 para. 65 in force at 12.10.2025, see art. 1

Acquisition of landE+W

66.—(1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not appropriate or acquire apparatus of SGN or appropriate, acquire, extinguish, interfere with or override any easement, other interest or right of SGN over land in which apparatus of SGN is placed otherwise than by agreement.

(2) Prior to the carrying out of any part of the authorised works (or in such other timeframe as may be agreed between SGN and the undertaker) that are subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement and/or other legal or land interest of SGN and/or affect the provisions of any enactment or agreement regulating the relations between SGN and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must provide replacement rights to SGN which must be no less favourable on the whole to SGN unless otherwise agreed by SGN and (to the extent necessary) it will be the responsibility of the undertaker to procure and/or secure the consent to and entering into of any deeds and variations required to be entered into by other third parties in connection with the provision of replacement rights.

(3) The undertaker and SGN agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation and/or removal of apparatus, including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by SGN and/or other enactments relied upon by SGN as of right or other use in relation to the apparatus, then the provisions in this Part of this Schedule shall prevail.

(4) Any agreement or consent granted by SGN under paragraph 69 (retained apparatus: protection of SGN) or any other paragraph of this Part of this Schedule shall not be taken to constitute agreement under sub-paragraph (1).

(5) As a condition of any agreement between the parties in sub-paragraph (1) that involves de-commissioned apparatus being left in situ in any land of the undertaker, the undertaker must accept a surrender of any existing easement and/or other interest of SGN in such decommissioned apparatus and consequently acquire title to such decommissioned apparatus and release SGN from all liabilities in respect of such de-commissioned apparatus from the date of such surrender.

(6) Where the undertaker acquires land which is subject to any SGN right or interest (including, without limitation, easements and agreements relating to rights or other interests) and the provisions of paragraph 67 (removal of apparatus) do not apply, the undertaker must (where the undertaker reasonably considers it compatible with the carrying out of the authorised works)—

(a)retain any notice of SGN’s easement, right or other interest on the title to the relevant land when registering the undertaker’s title to such acquired land; and

(b)where no such notice of SGN’s easement, right or other interest exists in relation to such acquired land or any such notice is registered only on the Land Charges Register) include (with its application to register title to the undertaker’s interest in such acquired land at the Land Registry) a notice of SGN’s easement, right or other interest in relation to such acquired land; and

(c)upon request from SGN, provide up to date official entry copies to SGN as soon as reasonably practicable.

(7) If the undertaker acquires land which is subject to any SGN right or interest and the undertaker reasonably considers that it cannot retain SGN’s easement, right or other interest, the undertaker must provide replacement rights to SGN.

Commencement Information

I64Sch. 9 para. 66 in force at 12.10.2025, see art. 1

Removal of apparatusE+W

67.—(1) If, in the exercise of an agreement reached in accordance with paragraph 66 (acquisition of land) or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be decommissioned or removed under this Part of this Schedule, and any right of SGN to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed, is in operation, and the rights and facilities referred to in sub-paragraph (2) have been provided, to the reasonable satisfaction of SGN and in accordance with sub-paragraphs (2) to (5) inclusive.

(2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to SGN advance written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order SGN reasonably needs to move or remove any of its apparatus) the undertaker must afford to SGN to its reasonable satisfaction (taking into account paragraph 68(1) (facilities and rights for alternative apparatus)) the necessary facilities and rights—

(a)for the construction of alternative apparatus;

(b)subsequently for the maintenance of that apparatus; and

(c)to allow access to that apparatus,

in each case including appropriate working areas required to reasonably and safely undertake necessary works by SGN in respect of the apparatus.

(3) If the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, SGN must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to assist the undertaker in obtaining the necessary facilities and rights in the land in which the alternative apparatus is to be constructed, save that this obligation is not to extend to the requirement for SGN to use its compulsory purchase powers to this end unless it (in its absolute discretion) elects to do so.

(4) Any alternative apparatus to be constructed in land of, or land secured by, the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between SGN and the undertaker.

(5) SGN must, after the alternative apparatus to be provided or constructed has been agreed, and subject to the prior grant to SGN of such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to decommission or remove any apparatus required by the undertaker to be decommissioned or removed under the provisions of this Part of this Schedule.

Commencement Information

I65Sch. 9 para. 67 in force at 12.10.2025, see art. 1

Facilities and rights for alternative apparatusE+W

68.—(1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for SGN facilities and rights in land for the access to, and construction and maintenance of, alternative apparatus in substitution for apparatus to be decommissioned or removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and SGN (both acting reasonably), and must be no less favourable on the whole to SGN than the facilities and rights enjoyed by it in respect of the apparatus to be decommissioned or removed unless otherwise agreed by SGN.

(2) If the facilities and rights to be afforded by the undertaker and agreed with SGN under sub paragraph (1) in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to SGN than the facilities and rights enjoyed by SGN in respect of the apparatus to be decommissioned or removed (in SGN’s reasonable opinion), then the terms and conditions to which those facilities and rights are subject in the matter will be referred to arbitration in accordance with paragraph 74 (arbitration) of this Part of this Schedule and the arbitrator shall make such provision for the payment of compensation by the undertaker to SGN as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Commencement Information

I66Sch. 9 para. 68 in force at 12.10.2025, see art. 1

Retained apparatus: protection of SGNE+W

69.—(1) Not less than 56 days before the carrying out of any specified works the undertaker must submit to SGN a plan and, if reasonably required by SGN, a ground monitoring scheme in respect of those works.

(2) The plan to be submitted to SGN under sub-paragraph (1) must include a method statement and describe—

(a)the exact position of the works;

(b)the level at which these are proposed to be constructed or renewed;

(c)the manner of their construction or renewal including details of excavation, positioning of plant etc.;

(d)the position of all apparatus;

(e)by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and

(f)any intended maintenance regimes.

(3) The undertaker must not carry out any works to which sub-paragraphs (1) and (2) apply until SGN has given written approval of the plan so submitted.

(4) Any approval of SGN required under sub-paragraph (3)—

(a)may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (5) or (7); and

(b)must not be unreasonably withheld; and

(c)if by the end of the period of 56 days from the submission of the plans pursuant to paragraphs (1) and (2) SGN has not intimated their disapproval of those plans and the grounds of such disapproval the undertaker may serve upon SGN written notice requiring SGN to intimate approval or disapproval within a further period of 28 days beginning with the date upon which SGN receives written notice from the undertaker and if by the expiry of the further 28 days SGN has not intimated approval or disapproval, SGN shall be deemed to have approved the plans as submitted.

(5) In relation to any work to which sub-paragraphs (1) and (2) apply, SGN may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.

(6) Works to which this paragraph applies must only be executed in accordance with—

(a)the plan submitted under sub-paragraphs (1) and (2) (or as modified pursuant to sub-paragraphs (4) and (5)); and

(b)all conditions imposed under sub-paragraph (4)(a),

as approved or as amended from time to time by agreement between the undertaker and SGN, and SGN will be entitled to watch and inspect the execution of those works.

(7) Where SGN requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to SGN’s reasonable satisfaction prior to the carrying out of any specified works (or any relevant part thereof) for which protective works are required and SGN must notify the undertaker of any such requirements within 45 days of submission of a plan pursuant to sub-paragraphs (1) and (2).

(8) If SGN, in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 61 to 63 and 66 to 68 apply as if the removal of the apparatus had been required by the undertaker under sub-paragraph 67(2) (removal of apparatus).

(9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before carrying out the specified works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan.

(10) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works, but in that case it must give to SGN notice as soon as is reasonably practicable and a plan of those works and must comply with—

(a)the conditions imposed under sub-paragraph (4)(a) insofar as is reasonably practicable in the circumstances; and

(b)sub-paragraph (11) at all times.

(11) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development which SGN reasonably considers is likely to have adversely affected apparatus, the undertaker is to implement an appropriate ground mitigation scheme save that SGN retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 70 (expenses).

Commencement Information

I67Sch. 9 para. 69 in force at 12.10.2025, see art. 1

ExpensesE+W

70.—(1) Subject to the following provisions of this paragraph, the undertaker must pay to SGN on demand all charges, costs and expenses reasonably anticipated or incurred by SGN (on provision of evidence by SGN to justify their claim and which in all cases must be reasonable in amount) in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or rights or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised works as are referred to in this Part of this Schedule including without limitation—

(a)any costs reasonably incurred by or compensation properly paid by SGN in connection with the negotiation or acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all reasonable and properly incurred costs (including professional fees) incurred by SGN as a consequence of SGN—

(i)using its own compulsory purchase powers to acquire any necessary rights under paragraph 67(3) (removal of apparatus) if it elects to do so; and/or

(ii)exercising any compulsory purchase powers in the Order transferred to or benefitting SGN;

(b)in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;

(c)the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;

(d)the approval of plans;

(e)the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works (provided that the quantum of this sum must be agreed between the undertaker and SGN prior to the protective works being carried out (save in the case of emergency works));

(f)the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule; and

(g)any watching brief pursuant to paragraph 69(6) (retained apparatus: protection of SGN).

(2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule which is not re-used as part of the alternative apparatus, that value being calculated after removal.

(3) If in accordance with the provisions of this Part of this Schedule—

(a)apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to SGN by virtue of sub-paragraph (1) will be reduced by the amount of that excess save where it is not possible in the circumstances (including due to statutory or regulatory changes) to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.

(4) For the purposes of sub-paragraph (3)—

(a)an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.

(5) An amount which apart from this sub-paragraph would be payable to SGN in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on SGN any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.

Commencement Information

I68Sch. 9 para. 70 in force at 12.10.2025, see art. 1

Enactments and agreementsE+W

71.  Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between SGN and the undertaker, nothing in this Part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertaker and SGN in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Commencement Information

I69Sch. 9 para. 71 in force at 12.10.2025, see art. 1

Co-operationE+W

72.—(1) Where in consequence of the proposed construction of any of the authorised works, the undertaker or SGN requires the removal of apparatus under paragraph 67(2) (removal of apparatus) or SGN makes requirements for the protection or alteration of apparatus under paragraph 69 (retained apparatus: protection of SGN), the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of SGN’s undertaking and SGN must co-operate with the undertaker for that purpose.

(2) For the avoidance of doubt, whenever SGN’s consent, agreement or approval is required in relation to plans, documents or other information submitted by SGN or the taking of action by SGN, it must not be unreasonably withheld or delayed.

Commencement Information

I70Sch. 9 para. 72 in force at 12.10.2025, see art. 1

AccessE+W

73.  If in consequence of the agreement reached in accordance with paragraph 66(1) (acquisition of land) or the powers granted under this Order the access to any apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by SGN in respect of the apparatus) is materially obstructed, the undertaker must provide such alternative rights and means of access to such apparatus as will enable SGN to maintain or use the apparatus no less effectively than was possible before such obstruction.

Commencement Information

I71Sch. 9 para. 73 in force at 12.10.2025, see art. 1

ArbitrationE+W

74.—(1) Any difference or dispute arising between the undertaker and SGN under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and SGN, be determined by arbitration in accordance with article 52 (arbitration).

(2) In determining any difference or dispute to which sub-paragraph (1) applies, the arbitrator must give full weight to the position expressed by SGN in relation to a dispute or difference as to the safe and efficient operation of its network.

Commencement Information

I72Sch. 9 para. 74 in force at 12.10.2025, see art. 1

NoticesE+W

75.  The plans submitted to SGN by the undertaker pursuant to paragraph 69(1) (retained apparatus: protection of SGN) must be sent to SGN at 1 Forbury Place, 43 Forbury Road, Reading, Berkshire RG1 3JH or such other address as SGN may from time to time appoint instead for that purpose and notify to the undertaker.

Commencement Information

I73Sch. 9 para. 75 in force at 12.10.2025, see art. 1

PART 6E+WFOR THE PROTECTION OF THAMES WATER UTILITIES LIMITED

ApplicationE+W

76.  For the protection of Thames Water Utilities Limited (hereinafter referred to as “TWUL”) (Company Registration No. 02366661) whose registered office address is at Clearwater Court, Vastern Road, Reading, Berkshire, RG1 8DB the following provisions have effect, unless otherwise agreed in writing between the undertaker and TWUL.

Commencement Information

I74Sch. 9 para. 76 in force at 12.10.2025, see art. 1

InterpretationE+W

77.  In this Part of this Schedule—

“alternative apparatus” means alternative apparatus adequate to enable TWUL to fulfil its statutory functions in a manner no less efficient and effective than previously;

“apparatus” means—

(a)

any sewer, drain or disposal works vested in TWUL under the Water Industry Act 1991(18); and

(b)

any sewer, drain or disposal works which are the subject of a notice of intention to adopt given under section 102(4)(19) (adoption of sewers and disposal of works) of that Act or an agreement to adopt made under section 104(20) (agreements to adopt sewer, drain or sewage disposal works, at a future date) of that Act,

and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps, inspection chambers or other accessories (as defined in section 219(1) (general interpretation) of that Act) forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;

“functions” includes powers and duties;

“in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and

“plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed.

Commencement Information

I75Sch. 9 para. 77 in force at 12.10.2025, see art. 1

On street apparatusE+W

78.  This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and TWUL are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

Commencement Information

I76Sch. 9 para. 78 in force at 12.10.2025, see art. 1

Apparatus in stopped up streets and public rights of wayE+W

79.—(1) Where any street is stopped up under article 13 (stopping up of streets) or any public right of way is stopped up under article 15 (public rights of way – creation, diversion and stopping up), TWUL has the same powers and rights in respect of any apparatus in the land in which the street or public right of way subsists as it enjoyed immediately before the stopping up and the undertaker must grant to TWUL legal easements reasonably satisfactory to TWUL in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of TWUL to require the removal of that apparatus under paragraph 82 (removal of apparatus) or the power of the undertaker to carry out works under paragraph 84 (retained apparatus).

(2) Regardless of the temporary alteration, diversion or restriction of any street under the powers conferred by article 14 (temporary stopping up of streets), TWUL is at liberty at all times to take all necessary access across any such stopped up street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that street.

Commencement Information

I77Sch. 9 para. 79 in force at 12.10.2025, see art. 1

Protective works to buildingsE+W

80.  The undertaker, in the case of the powers conferred by article 23 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.

Commencement Information

I78Sch. 9 para. 80 in force at 12.10.2025, see art. 1

Acquisition of land or interestsE+W

81.  Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not:

(a)acquire any apparatus of TWUL otherwise than by agreement;

(b)appropriate, acquire, extinguish, interfere with or override any interest in land, easement or other interest or right of TWUL so as to prevent access to the Crawley Sewage Treatment Works otherwise than by agreement; or

(c)appropriate, acquire, extinguish, interfere with or override any interest in land, easement, other interest or right of TWUL that would:

(i)prevent access to any TWUL apparatus (that is not to be removed pursuant to paragraph 82 (removal of apparatus)); or

(ii)impair TWUL’s ability to carry out its statutory function in connection with any of that apparatus,

without having first provided such alternative means of access to that apparatus or alternative rights in connection with that apparatus as will enable TWUL to maintain or use the apparatus or carry out its statutory functions in connection with the apparatus no less effectively than was possible before the undertaker’s exercise of powers.

Commencement Information

I79Sch. 9 para. 81 in force at 12.10.2025, see art. 1

Removal of apparatusE+W

82.—(1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that TWUL’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of TWUL to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of TWUL in accordance with sub-paragraphs (2) to (6).

(2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to TWUL 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed for approval by TWUL in accordance with sub-paragraph (4) and in that case (or if in consequence of the exercise of any of the powers conferred by this Order TWUL reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to TWUL the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.

(3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed TWUL must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for TWUL to use its compulsory purchase powers to this end unless it elects (in its absolute discretion) to so do.

(4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between TWUL and the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).

(5) TWUL must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 52 (arbitration), and after the grant to TWUL of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.

(6) Regardless of anything in sub-paragraph (5), and subject to sub-paragraph (7), if the undertaker gives notice in writing to TWUL that the undertaker desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, and TWUL gives its consent in writing (which is not to be unreasonably withheld or delayed and is to be subject to the provisions of sub-paragraph (7)), that work, instead of being executed by TWUL, may be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of TWUL.

(7) If by the end of the period of 56 days from the submission of the details relating to required removal works under sub-paragraphs (2) and (4) or the carrying out of works pursuant to sub-paragraph (6) TWUL has not intimated their disapproval of those details and the grounds of such disapproval, the undertaker may give TWUL written notice requiring TWUL to intimate approval or disapproval within a further period of 28 days beginning with the date upon which TWUL receives written notice from the undertaker and if by the expiry of the further 28 days TWUL has not intimated approval or disapproval, TWUL is deemed to have approved the details as submitted provided that such notification has been made in accordance with paragraph 94 (notices and applications).

(8) Any deemed approval under sub-paragraph (7) does not extend to the actual undertaking of the removal works, which remains the sole responsibility of TWUL or its contractors.

Commencement Information

I80Sch. 9 para. 82 in force at 12.10.2025, see art. 1

Facilities and rights for alternative apparatusE+W

83.—(1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to TWUL facilities and rights for the construction and maintenance of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and TWUL or in default of agreement settled by arbitration in accordance with article 52 (arbitration).

(2) In settling those terms and conditions in respect of alternative apparatus to be constructed in the land of the undertaker, the arbitrator will—

(a)give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptions of the alternative apparatus which may be required to prevent interference with the proposed works of the undertaker;

(b)so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or on the land for which the alternative apparatus is to be substituted; and

(c)give effect to the statutory obligations of TWUL and the undertaker.

(3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to TWUL than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to TWUL as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Commencement Information

I81Sch. 9 para. 83 in force at 12.10.2025, see art. 1

Retained apparatusE+W

84.—(1) Not less than 56 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are within 5 metres of the outside face of any apparatus the removal of which has not been required by the undertaker under paragraph 82(2) (removal of apparatus), the undertaker must submit to TWUL a plan of the works to be executed.

(2) The undertaker must not commence any works to which sub-paragraph (1) applies until TWUL has given written approval of the plan so submitted and such approval may be given subject to reasonable requirements for the purposes mentioned in sub-paragraph (3).

(3) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements or modifications as may be made in accordance with sub-paragraph (4) by TWUL for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and TWUL is entitled to watch and inspect the execution of those works.

(4) Any requirements made by TWUL as a condition of the approval under sub-paragraph (2) must be notified to the undertaker within a period of 35 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.

(5) If by the end of the period of 35 days from the submission of the details relating to required works under sub-paragraph (1) TWUL has not intimated their disapproval of those details and the grounds of such disapproval, the undertaker may give TWUL written notice requiring TWUL to intimate approval or disapproval within a further period of 21 days beginning with the date upon which TWUL receives written notice from the undertaker and if by the expiry of the further 21 days TWUL has not intimated approval or disapproval, TWUL is deemed to have approved the details as submitted provided that such notification has been made in accordance with paragraph 94 (notices and applications).

(6) If TWUL in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 77 to 79 and 82 to 84 apply as if the removal of the apparatus had been required by the undertaker under paragraph 82(2) (removal of apparatus).

(7) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any works (unless otherwise agreed with TWUL), a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.

(8) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency works but in that case must:

(a)give TWUL notice in accordance with paragraph 94 (notices and applications) as soon as is reasonably practicable;

(b)provide TWUL with a plan of those works as soon as reasonably practicable subsequently;

(c)carry out the works in accordance with industry best practice and guidelines on safe working near utilities;

(d)comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances; and

(e)keep the impact of those emergency works on TWUL’s apparatus to a minimum.

(9) In this Part of this Schedule “emergency works” means works whose execution at the time when they are executed is required in order to put an end to, or to prevent the occurrence of, circumstances then existing or imminent which are likely to cause danger to persons or serious damage to property. Where works comprise items some of which fall within this definition, the expression “emergency works” shall be taken to include such of the items as do not fall within that definition as cannot reasonably be severed from those that do.

Commencement Information

I82Sch. 9 para. 84 in force at 12.10.2025, see art. 1

Expenses and costsE+W

85.—(1) Subject to the following provisions of this paragraph, the undertaker must repay to TWUL all expenses reasonably incurred and any compensation properly paid by TWUL in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraphs 82(2) (removal of apparatus) or 84(2) or 84(3) (retained apparatus).

(2) There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.

(3) If in accordance with the provisions of this Part of this Schedule—

(a)apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to TWUL by virtue of sub-paragraph (1) must be reduced by the amount of that excess.

(4) For the purposes of sub-paragraph (3)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a pipe is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(5) An amount which apart from this sub-paragraph would be payable to TWUL in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on TWUL any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.

Commencement Information

I83Sch. 9 para. 85 in force at 12.10.2025, see art. 1

IndemnityE+W

86.—(1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction, maintenance or failure of any of the works referred to in paragraph 84(2) (retained property), any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or there is any interruption in the service provided by such apparatus or alternative apparatus, the undertaker must—

(a)bear and pay the cost reasonably and properly incurred by TWUL in making good such damage or restoring the service; and

(b)indemnify TWUL against all reasonable claims, penalties, demands, proceedings, costs, damages and expenses which are made or taken against or recovered from, or reasonably and properly incurred by, TWUL, by reason or in direct consequence of any such damage or interruption.

(2) The fact that any act or thing may have been done by TWUL on behalf of the undertaker or in accordance with a plan approved by TWUL or in accordance with any requirement of TWUL or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1) unless TWUL fails to carry out and execute the works properly with due care and attention and in a skilful and professional like manner or in a manner that does not accord with the approved plan.

(3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of TWUL, its officers, servants, contractors or agents.

(4) TWUL must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

(5) The undertaker must not commence any works of removal or diversion of TWUL’s apparatus carried out in accordance with paragraph 82 (removal of apparatus) or any works under paragraph 84 (retained property) unless and until TWUL is satisfied that the undertaker has first provided the bond and TWUL has confirmed the same to the undertaker in writing.

(6) The undertaker must maintain such bond for the construction period of such works from the proposed date of commencement of construction of those works.

(7) The total amount payable by the undertaker pursuant to this paragraph and paragraph 87 of this Part of this Schedule shall not exceed £20 million per event (and such cap will rise in line with the Consumer Prices Index rate of inflation).

Commencement Information

I84Sch. 9 para. 86 in force at 12.10.2025, see art. 1

Co-operationE+W

87.  Where in consequence of the proposed construction of any of the authorised development, the undertaker or TWUL requires the removal of apparatus under paragraph 82(2) (removal of apparatus) or TWUL makes requirements for the protection or alteration of apparatus under paragraph 84 (retained property), the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of TWUL’s undertaking and TWUL must use its best endeavours to co-operate with the undertaker for that purpose.

Commencement Information

I85Sch. 9 para. 87 in force at 12.10.2025, see art. 1

88.  Where, under this Part of this Schedule, TWUL is required to give its consent, approval or agreement in respect of any matter, that consent, approval or agreement must not be unreasonably withheld or delayed.E+W

Commencement Information

I86Sch. 9 para. 88 in force at 12.10.2025, see art. 1

89.  Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and TWUL in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.E+W

Commencement Information

I87Sch. 9 para. 89 in force at 12.10.2025, see art. 1

90.  At all times the undertaker shall procure that its employees, contractors and subcontractors take all reasonable and proper precautions in exercise of powers conferred by this Order to ensure that as little damage, obstruction or interference [F10is caused] to TWUL’s undertaking as is reasonably practicable save that this obligation is not to prevent the construction or operation of the authorised development.E+W

Textual Amendments

Commencement Information

I88Sch. 9 para. 90 in force at 12.10.2025, see art. 1

Use of statutory powersE+W

91.  In the event that TWUL carries out any works involving apparatus under its own statutory powers at the express written request of the undertaker then this Part of this Schedule is to apply to such works and TWUL covenants to observe and comply with this Part of this Schedule irrespective of whether it is carrying out the works under its own statutory powers or in reliance on the powers conferred by the Order.

Commencement Information

I89Sch. 9 para. 91 in force at 12.10.2025, see art. 1

Ground works and surveysE+W

92.  The undertaker must provide written notice to TWUL as soon as reasonably practicable in the event they determine to alter the ground level more than 300mm within 5 metres laterally of the outside face of any apparatus. Subsequently TWUL will determine if works under paragraphs 82(2) (removal of apparatus) or 84(2) (retained apparatus) are necessary.

Commencement Information

I90Sch. 9 para. 92 in force at 12.10.2025, see art. 1

Notices and applicationsE+W

94.  Notwithstanding any other provision of this Order, any—

(a)written notice to TWUL provided for in this Order; or

(b)application for the approval of TWUL made pursuant to article 22(3) (discharge of water),

must be made by email to [F11devcon.team@thameswater.co.uk] or developer.services@thameswater.co.uk or such other contact details as may be provided by TWUL to the undertaker from time to time. In the case of emergencies, notice must also be given via the Thames Water website or such other contact details as may be provided by TWUL to the undertaker from time to time.

Textual Amendments

Commencement Information

I91Sch. 9 para. 94 in force at 12.10.2025, see art. 1

PART 7E+WFOR THE PROTECTION OF ESSO PETROLEUM COMPANY, LIMITED

ApplicationE+W

95.  The provisions of this Part of this Schedule have effect for the protection of Esso unless otherwise agreed in writing between the undertaker and Esso.

Commencement Information

I92Sch. 9 para. 95 in force at 12.10.2025, see art. 1

InterpretationE+W

96.  In this Part of this Schedule—

“alternative apparatus” means alternative apparatus adequate to enable Esso to fulfil its functions as a pipe-line operator in a manner no less efficient than previously and having regard to Esso’s standards for the construction and operation of its pipelines;

“alternative rights” means new rights for the construction of and for access to and for the use, protection, inspection, maintenance, repair and renewal of apparatus or alternative apparatus including any restrictions on the landowner and occupiers for the protection of the apparatus or alternative apparatus and to allow Esso to perform its functions in a manner no less efficient than under the existing rights and having regard to Esso’s standards for the construction and operation of its pipelines;

“apparatus” means the pipeline and storage system owned by Esso within or adjacent to the Order limits and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus and includes any ancillary works and apparatus all protective wrappings, valves, sleeves and slabs, cathodic protection units, together with ancillary cables and markers and, where the context allows, includes alternative apparatus;

“Esso” means Esso Petroleum Company, Limited and any successor in title;

“existing rights” means the rights and benefits of covenants enjoyed by Esso in land within the Order limits;

“functions” includes powers and duties;

“in” in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;

“plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary to describe the works to be executed;

“specified work” means any works that are near to, or will or are likely to affect any apparatus or power supply to any apparatus including—

(a)

all intrusive or non-intrusive works within 15 metres of any apparatus,

(b)

the crossing of apparatus by other utilities,

(c)

the use of explosives within 400 metres of any apparatus (to an extent likely to affect any apparatus), and

(d)

piling, undertaking of a 3D seismic survey or the sinking of boreholes within 30 metres of any apparatus;

whether carried out by the undertaker or by any third party at the direction of the undertaker in connection with the authorised development; and

“works agreement” means an agreement containing sufficient detail as to responsibilities for the design, programming, supervision and carrying out of works under this Part of this Schedule or in connection with the authorised development which affect the apparatus.

Commencement Information

I93Sch. 9 para. 96 in force at 12.10.2025, see art. 1

Acquisition of apparatusE+W

97.—(1) Despite any provision in this Order or anything shown on the land plans or if the Order covers any interest in any land in which any apparatus is placed or over which existing rights are enjoyed by Esso, the undertaker must not—

(a)acquire any apparatus otherwise than by agreement with Esso; or

(b)acquire, suspend or extinguish any of the existing rights so as to hinder Esso’s ability to access, maintain or repair its apparatus, otherwise than in accordance with this Part of this Schedule, by agreement with Esso or having first provided alternative rights.

(2) Where the undertaker acquires land which is subject to any existing rights and the provisions of paragraph 98 (removal of apparatus and rights for alternative apparatus) do not apply, the undertaker must retain any notice of the existing rights on the title to the relevant land when registering the undertaker’s title to such acquired land, provided that this does not hinder the delivery of the authorised development.

Commencement Information

I94Sch. 9 para. 97 in force at 12.10.2025, see art. 1

Removal of apparatus and rights for alternative apparatusE+W

98.—(1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that any apparatus is relocated or diverted, that apparatus must not be removed by the undertaker and any right of Esso to maintain and use that apparatus in that land and to gain access to it must not be extinguished until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of Esso.

(2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give Esso 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Esso reasonably needs to remove any apparatus) the undertaker must, subject to sub-paragraph (3), afford to Esso the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently grant alternative rights for the maintenance of that apparatus in accordance with paragraph 99 (facilities and rights for alternative apparatus).

(3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker must, to the extent reasonable, acquire for the benefit of Esso the necessary facilities and rights for the construction, maintenance and use of the alternative apparatus and access to it.

(4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Esso and the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).

(5) Esso must, after the alternative apparatus to be provided or constructed has been agreed or settled in accordance with article 52 (arbitration), and after the grant to Esso of any such facilities and rights as are referred to in sub-paragraph (2), proceed as soon as reasonably practicable using reasonable endeavours to construct and bring into operation the alternative apparatus and subsequently to remove (or if agreed between the parties allow the undertaker to remove) any redundant apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.

(6) Irrespective of sub-paragraph (5), if the undertaker gives notice in writing to Esso that it desires itself to execute any work, or part of any work in connection with the construction, removal or decommissioning of apparatus in the land of the undertaker or the construction of alternative apparatus, that work, instead of being executed by Esso, must be executed by the undertaker without unnecessary delay under the superintendence, if required, and to the reasonable satisfaction of Esso.

(7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 3000 millimetres of the apparatus without Esso’s consent unless that apparatus is redundant and disconnected from Esso’s remaining system and is more than 3000 millimetres from any live apparatus.

(8) If Esso fails either reasonably to approve, or to provide reasons for its failure to approve along with an indication of what would be required to make acceptable, any proposed details relating to required removal works under sub-paragraph (2) within 28 days of receiving notice of the required works from the undertaker, then such details are deemed to have been approved, provided the undertaker has first taken all reasonable steps to contact the relevant representatives of Esso in order to elicit such a response.

Commencement Information

I95Sch. 9 para. 98 in force at 12.10.2025, see art. 1

Facilities and rights for alternative apparatusE+W

99.—(1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to Esso facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and Esso in accordance with this paragraph or in default of agreement settled by arbitration in accordance with article 52 (arbitration).

(2) Alternative rights must be granted before any alternative apparatus is brought into use or any existing rights extinguished.

(3) Alternative rights shall where reasonably practicable be granted to Esso by way of a deed of grant of easement, substantially in the form of Esso’s precedent from time to time. If any third party is required to be involved for the grant of alternative rights, the undertaker must secure their agreement, at its own cost.

(4) In settling those terms and conditions for the alternative rights in respect of alternative apparatus the arbitrator—

(a)must give effect to all reasonable requirements of the undertaker and Esso for ensuring the safety and efficient operation of the authorised development and the apparatus respectively; and

(b)so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or on the land for which the alternative apparatus is to be substituted.

(5) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to Esso than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to Esso as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Commencement Information

I96Sch. 9 para. 99 in force at 12.10.2025, see art. 1

Retained apparatus: protectionE+W

100.—(1) Unless a shorter period is otherwise agreed in writing between the undertaker and Esso, not less than 35 days before commencing any specified work in relation to apparatus the removal of which has not been required by the undertaker under sub-paragraph 98(2) (removal of apparatus and rights for alternative apparatus) the undertaker must submit to Esso a plan of the works to be executed.

(2) The plan to be submitted to Esso under sub-paragraph (1) must include a method statement and describe—

(a)the exact position of the works;

(b)the level at which these are proposed to be constructed or renewed;

(c)the manner of their construction or renewal including details of excavation, positioning of plant etc.;

(d)the position of all apparatus;

(e)by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus;

(f)any intended maintenance regime; and

(g)and any other information reasonably required by Esso to assess the works.

(3) The specified work must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (4) by Esso for the alteration or otherwise for the protection of the apparatus, or for securing access to it; and Esso is entitled to watch and inspect the execution of the specified work and the undertaker must follow any reasonable instructions from Esso for the safety of the apparatus and those working nearby.

(4) Any reasonable requirements made by Esso under sub-paragraph (2) must be made within a period of 14 days (unless a shorter period is otherwise agreed in writing between the undertaker and Esso) beginning with the date on which a valid plan under sub-paragraph (1) is submitted to it.

(5) If Esso in accordance with sub-paragraph (2) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, this paragraph applies as if the removal of the apparatus had been required by the undertaker under paragraph 98(2) (removal of apparatus and rights for alternative apparatus) but for the avoidance of doubt the undertaker shall not be required to serve Esso with a new notice under paragraph 98.

(6) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time but (unless otherwise agreed in writing between the undertaker and Esso) in no case less than 28 days before commencing any specified work, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.

(7) The undertaker is not required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to Esso notice of the works it intends to carry out to remedy the emergency together with a plan as soon as is reasonably practicable and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

(8) In relation to any works which will or may be situated on, over, under or within 15 metres measured in any direction of apparatus, or (wherever situated) impose any load directly upon the apparatus or involve embankment works within 15 metres of the apparatus, the plan to be submitted to Esso under sub-paragraph (1) must include a material statement describing—

(a)the exact position of the work;

(b)the level at which the work is to be constructed or renewed;

(c)the manner of its construction or renewal;

(d)the position of the apparatus; and

(e)by way of detailed drawings, every alteration proposed to be made to the apparatus.

Commencement Information

I97Sch. 9 para. 100 in force at 12.10.2025, see art. 1

Cathodic protection testingE+W

101.  Where in the reasonable opinion of the undertaker or Esso—

(a)the authorised development might interfere with the existing cathodic protection forming part of any apparatus; or

(b)any apparatus might interfere with the proposed or existing cathodic protection forming part of the authorised development,

Esso and the undertaker must co-operate in undertaking the tests which the undertaker considers reasonably necessary for ascertaining the nature and extent of such interference and measures for providing or preserving cathodic protection.

Commencement Information

I98Sch. 9 para. 101 in force at 12.10.2025, see art. 1

ExpensesE+W

102.—(1) Subject to the following provisions of this paragraph, the undertaker must pay to Esso the reasonable costs and expenses incurred by Esso in, or in connection with—

(a)the inspection, removal, making safe, abandonment, alteration or protection of any apparatus;

(b)the execution of any works required by this Part of this Schedule including the purchase, installation and commission of alternative apparatus and re-commissioning of existing apparatus;

(c)the review and assessment of plans;

(d)the watching and inspecting the execution of any specified work, any associated works and any works undertaken by third parties as a result of any specified work (including the assessment of plans); or

(e)imposing reasonable requirements for the protection or alteration of apparatus affected by the authorised development or works as a consequence of the authorised development,

which may reasonably be required in consequence of the execution of any such works as are required under this Part of this Schedule or are authorised by the Order.

(2) The scrap value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.

(3) Upon the submission of proper and reasonable estimates of costs and expenses to be incurred by Esso, the undertaker must pay Esso sufficiently in advance to enable Esso to undertake its obligations under this Part of this Schedule in a manner that is neutral to its cashflow provided that in the event that the costs incurred by Esso are less than the amount paid by the undertaker pursuant to this sub-paragraph then Esso shall promptly repay any overpayment to the undertaker.

(4) Where reasonably required by either party, in view of the complexity of any proposed works, timescales, phasing or costs, the parties must with due diligence and good faith negotiate a works agreement.

(5) If in accordance with the provisions of this Part of this Schedule—

(a)apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Esso by virtue of sub-paragraph (1) shall be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type of operations, capacity, dimensions or place at the existing depth in which case full costs will be borne by the undertaker.

(6) For the purposes of sub-paragraph (5)—

(a)an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole shall be treated as if it also had been agreed or had been so determined.

Commencement Information

I99Sch. 9 para. 102 in force at 12.10.2025, see art. 1

Damage to property and other lossesE+W

103.—(1) Subject to the following provisions of this paragraph, the undertaker must make reasonable compensation to Esso—

(a)for all loss, damage, liability, costs and expenses reasonably suffered or incurred by Esso for which Esso is legally liable as a result of legally sustainable claims brought against Esso by any third party solely arising out of the carrying out of any relevant works;

(b)for the cost reasonably incurred by Esso in making good any damage to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal or abandonment) arising from or caused by the carrying out of any relevant works and the authorised development; and

(c)for the cost reasonably incurred by Esso in stopping, suspending and restoring the supply through its pipe-line and make reasonable compensation to Esso for any other expenses, losses, damages, penalty or costs incurred by Esso by reason or in consequence of any such damage or interruption provided that the same arises in consequence of the carrying out of any relevant works and the authorised development.

(2) The fact that any act or thing may have been done by Esso on behalf of the undertaker or in accordance with a plan approved by Esso or in accordance with any requirement of Esso or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1).

(3) Irrespective of anything to the contrary elsewhere in this Part of this Schedule—

(a)the undertaker and Esso must at all times take reasonable steps to prevent and mitigate any loss, damage, liability, claim, cost or expense recoverable from the other under this Part of this Schedule; and

(b)neither the undertaker nor Esso are liable for any loss, damage, liability, claim, cost or expense suffered or incurred by the other to the extent that the same are incurred as a result of or in connection with the sole, partial or complete breach of this Part of this Schedule or negligence arising out of an act, omission, default or works of the other, its officers, servants, contractors or agents.

(4) Esso must give to the undertaker reasonable notice of any claim or demand to which this paragraph applies. If Esso agrees (such agreement not to be unreasonably withheld or delayed), the undertaker may at its own expense conduct all negotiations for the settlement of the same and any litigation that may arise therefrom. Esso must not compromise or settle any claim or demand make any admission which might be prejudicial to the claim or demand without the undertaker’s consent (such consent not to be unreasonably withheld). Esso must, at the request of the undertaker, afford all reasonable assistance for the purpose of contesting any such claim or action, and is entitled to be repaid all reasonable expenses incurred in so doing.

(5) Nothing in this Part of this Schedule excludes or limit the liability of the undertaker for death or personal injury resulting from the negligence of the undertaker or any of its officers, employees or agents.

(6) The total liability of the undertaker to Esso under this Part of this Schedule is not to exceed £15 million.

(7) In this paragraph “relevant works” means such of the authorised development as—

(a)does, will or is likely to affect any apparatus; or

(b)involves a physical connection or attachment to any apparatus.

Commencement Information

I100Sch. 9 para. 103 in force at 12.10.2025, see art. 1

Co-operationE+W

104.—(1) Where in consequence of the proposed construction of any of the authorised development, the undertaker requires the removal of apparatus under this Part of this Schedule or Esso makes requirements for the protection or alteration of apparatus under this Part of this Schedule, the undertaker must use reasonable endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of Esso’s undertaking and Esso must use its reasonable endeavours to co-operate with the undertaker for that purpose.

(2) The undertaker and Esso must act reasonably in respect of any given term of this Part of this Schedule and, in particular, (without prejudice to generality) where any consent or expression of satisfaction is required by this Part of this Schedule it must not be unreasonably withheld or delayed.

Commencement Information

I101Sch. 9 para. 104 in force at 12.10.2025, see art. 1

MiscellaneousE+W

105.  Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and Esso in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made provided that the terms of the relevant enactment or agreement are not inconsistent with the provisions of this Order, including this Part of this Schedule. In the case of any inconsistency, the provisions of this Order, including this Part of this Schedule, prevail.

Commencement Information

I102Sch. 9 para. 105 in force at 12.10.2025, see art. 1

(1)

1989 c. 29. The definition of “electrical plant” contained in section 64 was amended by section 108 of, and paragraphs 24 and 38(1) and (3) of Schedule 6 to, the Utilities Act 2000 (c. 27).

(2)

1986 c. 44. Section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000.

(4)

Section 102(4) was amended by section 96(1)(c) of the Water Act 2003 (c. 37) and section 56 of, and paragraph 90 of Schedule 7 to, the Water Act 2014 (c. 21).

(5)

Section 104 was amended by sections 11(2), 96(4) and 101(2) of, and Part 3 of Schedule 9 to, the Water Act 2003 and section 42(3) of the Flood and Water Management Act 2010 (c. 29).

(7)

Section 106 was amended by section 4(3) to (9) of the Digital Economy Act 2017 (c. 30); Schedule 3A to the Communications Act 2003 was inserted by section 4 of, and Schedule 1 to, the Digital Economy Act 2017.

(10)

1993 c. 43. Section 8 was amended by section 216 of, and Part 1 of Schedule 2, paragraph 4 of Schedule 17 and Part IV of Schedule 31 to, the Transport Act 2000 (c. 38), by section 16(5) of, and paragraph 5 of Schedule 2 to, the Railways and Transport Safety Act 2003 (c. 20), by sections 1 and 60 of, and paragraph 3 of Schedule 1 and Part 1 of Schedule 13 to, the Railways Act 2005 (c. 14) and S.I. 2015/1682.

(12)

Section 11(3) was amended by paragraph 6 of Schedule 14 to the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.

(13)

2016 c. 22. Section 203 was amended by section 37(2) of the Neighbourhood Planning Act 2017 (c. 20) and paragraph 5(2) and (3) of Schedule 20 to the Environment Act 2021 (c. 30).

(14)

Section 172 was amended by section 26(8)(b) of the Neighbourhood Planning Act 2017.

(16)

1993 c. 43. Section 8 was amended by Part I of Schedule 2 and paragraph 4(2), (33) and (4) of Schedule 17 to the Transport Act 2000 (c. 38), paragraph 5 of Schedule 2 to the Railways and Transport Safety Act 2003 (c. 20), paragraph 3(3) and (4) of Schedule 1 and Part 1 of Schedule 13 to the Railways Act 2005 (c. 14) and S.I. 2015/1682.

(19)

Section 102(4) was amended by section 96(1)(c) of the Water Act 2003 (c. 37) and paragraph 90 of Schedule 7 to the Water Act 2014 (c. 21).

(20)

Section 104 was amended by section 96(4) of, and Part 3 of Schedule 9 to, the Water Act 2003, section 42(3) of the Flood and Water Management Act 2010 (c. 29) and section 11(2) of the Water Act 2014.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources