Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
Prospective
Article 34
Commencement Information
I1Sch. 7 in force at 9.10.2024 (as amended by S.I. 2024/1020, Sch.), see art. 1
(1) Plot Reference Number shown on land plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development |
---|---|---|
Land Plans – Sheet 4 | ||
4/1a | Land required temporarily for temporary traffic management purposes. | Ancillary works |
4/1b | Required to facilitate and provide a working space and temporary access for works associated with the diversion of power cables. | Work No. 35 |
4/1c | Required to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane. | Work No. 9 |
4/1d | Land required temporarily for temporary traffic management purposes. | Ancillary works |
4/2a | Required to facilitate and provide a working space and temporary access for works associated with the diversion of 50 metres in length of power cables. | Work No. 35 |
4/2b | Required to facilitate and provide a working space and temporary access for works associated with the diversion of power cables. | Work No. 35 |
4/2c | Land required temporarily for temporary traffic management purposes. | Ancillary works |
Land Plans – Sheet 5 | ||
5/5a | Requirement to facilitate and provide a working space and temporary access for works associated with the construction of a drainage outfall into the River Itchen. | Work No. 43 |
5/2d | Land required temporarily for temporary traffic management purposes. | Ancillary Works |
5/2e | Required to facilitate and provide a working space and temporary access for works associated with: 1. the improvement and construction of the realignment of the northbound and southbound carriageways of the A33 between B3047 (London Road) / A33 junction and proposed A33 / M3 northbound onslip roundabout; 1(g). the construction of the extension of the existing central reserve with associated vehicle restraint system; 1(h). the construction of carriageway realignment on the existing River Itchen bridge (including possible remediation works); 3. the construction improvements and realignment of the southbound carriageway of the A34; 42. the construction of a drainage outfall into the River Itchen. | Work No. 1, 1(g), 1(h), 3, 42 |
5/3c | Required temporarily to facilitate construction generally and to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane. | Work No. 9 |
5/4 | Required temporarily to facilitate construction of surface water drainage outfall. | Work No. 42 |
Land Plans – Sheet 6 | ||
6/1f | Required to facilitate and provide a working space and temporary access for works associated with: 9. the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk and Easton Lane; 9(a). the construction of an attenuation basin maintenance track; 20. the diversion of a low-pressure gas main pipeline; 26. the diversion of telecommunication equipment; 33. the realignment of the National Cycle Route 23 and associated earthworks and landscaping. | Work No. 9, 9(a), 20, 26, 33 |
6/1g | Required to construct a temporary construction site compound. | Work No. 38 |
6/4d | Required to facilitate and provide a working space and temporary access for works associated with the construction of a new bridleway and associated drainage and landscaping features to connect Long Walk to Easton Lane. | Work No. 9 |
6/6a | Required to facilitate and provide a working space and temporary access for works associated with the diversion of a low-pressure gas main pipeline. | Work No. 20 |
6/6b | Required to facilitate and provide a working space and temporary access for works associated with: 20. the diversion of a low-pressure gas main pipeline; 38: the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory. | Work Nos. 20, 38 |
Land Plans – Sheet 7 | ||
7/1a | Required to facilitate and provide a working space and temporary access for works associated with the construction of a temporary construction site compound situated on land to the east of the M3 Junction 9 gyratory. | Work No. 38 |
7/2c | Land required temporarily for temporary traffic management purposes. | Ancillary works |
7/4g | Land required temporarily for temporary traffic management purposes. | Ancillary works |
7/5 | Land required temporarily for temporary traffic management purposes. | Ancillary works |
7/6 | Land required temporarily for temporary traffic management purposes | Ancillary works |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: