SCHEDULES

SCHEDULE 6LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN

Article 29

(1)

Area

(2)

Plot Reference Number(s) shown on land plans

(3)

Purpose for which temporary possession may be taken

(4)

Relevant part of the authorised development

SCHEME 0102 – M6 J40 TO KEMPLAY BANK

Scheme 0102 – The land plans – sheet 1

In the administrative area of Westmorland and Furness Council

0102-01-01

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to the existing A66 on the western approach to M6 Junction 40 and the provision of landscaping and reprofiling.

Work No. 0102-1A

0102-01-08

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to the existing A66 on the western approach to M6 Junction 40 and the provision of new private means of access, landscaping and reprofiling.

Work No. 0102-1A

0102-01-33

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to sections of the existing A66 and the provision of landscaping and reprofiling.

Work No. 0102-1C

0102-01-46

Required for the provision of working space and to facilitate the improvement of the existing M6 southbound merge slip road, the construction of an additional auxiliary lane at the M6 Junction 40 and the provision of construction compound and storage area.

Work No. 0102-5

Scheme 0102 – The land plans – sheet 2

In the administrative area of Westmorland and Furness Council

0102-02-21

0102-02-55

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to sections of the existing A66 and the provision of landscaping and reprofiling.

Work No. 0102-1D

0102-02-35

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to sections of the existing A686 and its tie-in to the new Kemplay Bank Junction and the provision of environmental mitigation, landscaping and reprofiling.

Work Nos. 0102-1D and 0102-8

0102-02-49

Required for the provision of working space and to facilitate the improvement of the existing Kemplay Bank Roundabout, to comprise a new grade-separated Junction (“the new Kemplay Bank Junction”), and the construction of additional carriageway and improvements to sections of the existing A6 and the provision of environmental mitigation, landscaping and reprofiling.

Work Nos. 0102-1D; 0102-7B; and 0102-7C

0102-02-51

Required for the provision of working space and to facilitate the improvement of the existing Kemplay Bank Roundabout, to comprise a new grade-separated Junction (“the new Kemplay Bank Junction”), and the construction of additional carriageway and improvements to sections of the existing A6.

Work Nos. 0102-1D; 0102-7B; and 0102-7C

0102-02-59

0102-02-63

0102-02-65

0102-02-82

0102-02-86

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to sections of the existing A66.

Work Nos. 0102-1D; 0102-7B; and 0102-7C

0102-02-64

0102-02-69

Required for the provision of working space and to facilitate the construction of additional carriageway and improvements to sections of the existing A66 and the provision of landscaping and reprofiling, construction of surface water drainage infrastructure.

Work Nos. 0102-1D; 0102-7B and 0102-7C

SCHEME 03 – PENRITH TO TEMPLE SOWERBY

Scheme 03 – The land plans – sheet 1

In the administrative area of Westmorland and Furness Council

03-01-30

Required for the provision of working space and to facilitate the construction of a new footpath connecting to the site of the countess pillar on the south side of the improved A66 and the provision of landscaping and reprofiling.

Work Nos. 03-9A and 03-9B

03-01-70

Required for the provision of working space and to facilitate the construction of a new all-purpose dual carriageway (“the new A66”) and of improvements to the existing A66 (“the improved A66”) between Penrith and Temple Sowerby and related works and the provision of landscaping and reprofiling, construction of surface water drainage infrastructure.

Work No. 03-1B

Scheme 03 – The land plans – sheet 3

In the administrative area of Westmorland and Furness Council

03-03-09

Required for the provision of working space and to facilitate part of the new “Junction at Center Parcs”, to include the improvement of the existing junction on the westbound carriageway of the improved A66, the construction of a new road to connect between the westbound carriageway of the improved A66, the new connector road and an existing private means of access to “Center Parcs” and the provision of landscaping and reprofiling.

Work No. 03-4B

03-03-21

Required for the provision of working space and to facilitate the construction of a new all-purpose dual carriageway (“the new A66”) and of improvements to the existing A66 (“the improved A66”) between Penrith and Temple Sowerby and related works and part of the new “Junction at Center Parcs”, to include the improvement of the existing junction on the westbound carriageway of the improved A66, the construction of a new road to connect between the westbound carriageway of the improved A66, the new connector road and an existing private means of access to “Center Parcs” and the provision of landscaping and reprofiling.

Work Nos. 03-1B and 03-4B

SCHEME 0405 – TEMPLE SOWERBY TO APPLEBY

Scheme 0405 – The land plans – sheet 1

In the administrative area of Westmorland and Furness Council

0405-01-20

Required for the provision of working space and to facilitate the improvement of the existing slip road and Morland Road including new roundabout and the provision of landscaping and reprofiling.

Work No. 0405-3B

0405-01-22

Required for the provision of working space and to facilitate the improvement of the existing slip road and Morland Road including new roundabout and the provision of environmental mitigation, landscaping and reprofiling.

Work No. 0405-3B

0405-01-26

Required for the provision of working space and to facilitate the improvement of the existing slip road and Morland Road including new roundabout and the provision of environmental mitigation, landscaping and reprofiling, construction compound and storage area.

Work No. 0405-3B

0405-01-68

Required for the provision of working space and to facilitate the construction of a new local road between Temple Sowerby and Low Moor Caravan Park, cycle track and private means of access and the provision of environmental mitigation, landscaping and reprofiling, haul route.

Work No. 0405-4A

0405-01-114

Required for the provision of working space and to facilitate the construction of the new A66 eastbound and improvements to sections of the existing A66 eastbound and de-trunking and reclassification of the existing A66, the construction of a new compact grade separated junction, re-alignment of Fell Lane and construction of an overbridge, and provision of public rights of way and private means of access and the provision of landscaping and reprofiling, haul route.

Work No. 0405-1A

0405-01-132

Required for the provision of working space and to facilitate the construction of the new A66 eastbound and improvements to sections of the existing A66 eastbound and de-trunking and reclassification of the existing A66, the construction of a new compact grade separated junction, re-alignment of Fell Lane and construction of an overbridge, and provision of public rights of way and private means of access and the provision of landscaping and reprofiling.

Work No. 0405-1A

Scheme 0405 – The land plans – sheet 2

In the administrative area of Westmorland and Furness Council

0405-02-31

0405-02-34

Required for the provision of working space and to facilitate the improvement of the existing A66, once de-trunked and the provision of non-motorised users’ facilities, landscaping and reprofiling.

Work No. 0405-4B

0405-02-36

Required for the provision of working space and to facilitate the improvement of the existing A66, once de-trunked and the provision of non-motorised users’ facilities, landscaping and reprofiling, construction compound and storage area.

Work No. 0405-4B

0405-02-39

0405-02-45

0405-02-49

Required for the provision of working space and to facilitate the improvement of the existing A66, once de-trunked and the provision of non-motorised users’ facilities, landscaping and reprofiling, permanent diversion of third party apparatus.

Work No. 0405-4B

Scheme 0405 – The land plans – sheet 3

In the administrative area of Westmorland and Furness Council

0405-03-01

Required for the provision of working space and to facilitate the construction of a length of new footpath, between the realigned Cross Street on the south side of the new A66, and the realigned Fell Lane on the north side of the new A66; the provision of new private means of access; and works to effect the stopping up of a length of existing Footpath 336/017 and of existing private means of access.

Work No. 0405-9

0405-03-05

0405-03-06

0405-03-07

Required for the provision of working space and to facilitate the construction of a length of new footpath, between the realigned Cross Street on the south side of the new A66, and the realigned Fell Lane on the north side of the new A66; the provision of new private means of access; and works to effect the stopping up of a length of existing Footpath 336/017 and of existing private means of access and the provision of landscaping and reprofiling.

Work No. 0405-9

0405-03-68

Required for the provision of working space and to facilitate the improvement and re-alignment of the existing Sleastonhow Lane, the stopping up of part of the existing Sleastonhow Lane and the construction of new private means of access.

Work No. 0405-13

0405-03-70

0405-03-77

0405-03-78

Required for the provision of working space and to facilitate the improvement and re-alignment of the existing Sleastonhow Lane, the stopping up of part of the existing Sleastonhow Lane and the construction of new private means of access and the provision of landscaping and reprofiling.

Work No. 0405-13

0405-03-82

Required for the provision of working space and to facilitate the realignment and improvements to the existing Fell Lane, works to effect the stopping up of existing private means of access and the construction of a new and replacement private means of access and the construction of a length of new footpath, between the realigned Cross Street on the south side of the new A66, and the realigned Fell Lane on the north side of the new A66; the provision of new private means of access; and works to effect the stopping up of a length of existing Footpath 336/017 and of existing private means of access and the provision of landscaping and reprofiling.

Work Nos. 0405-11A and 0405-9

0405-03-85

Required for the provision of working space and to facilitate the construction of a new road connecting the realigned Fell Lane with the realigned Main Street, new private means of access and works to effect the stopping up of a length of the existing Main Street and the provision of landscaping and reprofiling, construction compound and storage area.

Work No. 0405-12

0405-03-92

0405-03-98

0405-03-100

Required for the provision of working space and to facilitate the construction of a new road connecting the realigned Fell Lane with the realigned Main Street, new private means of access and works to effect the stopping up of a length of the existing Main Street and the provision of landscaping and reprofiling.

Work No. 0405-12

Scheme 0405 – The land plans – sheet 4

In the administrative area of Westmorland and Furness Council

0405-04-28

Required for the provision of working space and to facilitate the improvement and re-alignment of the existing Sleastonhow Lane, the stopping up of part of the existing Sleastonhow Lane and the construction of new private means of access and the provision of landscaping and reprofiling.

Work No. 0405-13

0405-04-54

Required for the provision of working space and to facilitate the improvement of the existing A66, once de-trunked and the provision of landscaping and reprofiling.

Work No. 0405-4B

Scheme 0405 – The land plans – sheet 5

In the administrative area of Westmorland and Furness Council

0405-05-17

Required for the provision of working space and to facilitate the improvement of a length of the existing A66 (to be de-trunked) to the south-west of Powis House and the construction of a new cycleway alongside the carriageway of the existing A66 and the provision of landscaping and reprofiling, construction compound and storage area.

Work No. 0405-18

0405-05-43

0405-05-46

Required for the provision of working space and to facilitate the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling.

Work No. 0405-2B

0405-05-51

Required for the provision of working space and to facilitate the construction of the new A66 eastbound and improvements to sections of the existing A66 eastbound and works related to the construction of a new compact grade separated junction, de-trunking and reclassification of the existing A66, provision of public rights of way (including overbridge) and new and replacement private means of access and the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the construction of the realigned Long Marton and the provision of landscaping and reprofiling, construction compound and storage area.

Work Nos. 0405-1B, 0405-2B and 0405-16

0405-05-66

Required for the provision of working space and to facilitate the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling, permanent diversion of third party apparatus.

Work No. 0405-2B

0405-05-76

Required for the provision of working space and to facilitate the construction of the realigned Long Marton. The construction of a new connector road connecting the new A66 eastbound carriageway with the realigned Long Marton and a new private means of access adjacent to the Long Marton eastbound compact connector road and the provision of landscaping and reprofiling, construction compound and storage area.

Work Nos. 0405-16 and 0405-17A

0405-05-81

Required for the provision of working space and to facilitate the construction of a new connector road connecting the new A66 eastbound carriageway with the realigned Long Marton and a new private means of access adjacent to the Long Marton eastbound compact connector road and the provision of landscaping and reprofiling.

Work No. 0405-17A

0405-05-82

Required for the provision of working space and to facilitate the construction of a new connector road connecting the new A66 eastbound carriageway with the realigned Long Marton and a new private means of access adjacent to the Long Marton eastbound compact connector road and the provision of environmental mitigation, landscaping and reprofiling, construction compound and storage area.

Work No. 0405-17A

0405-05-93

Required for the provision of working space and to facilitate the construction of the new A66 eastbound and improvements to sections of the existing A66 eastbound and de-trunking and reclassification of the existing A66, the construction of a new compact grade separated junction, realignment of Fell Lane and construction of an overbridge, and provision of public rights of way and private means of access and the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling.

Work Nos. 0405-1A and 0405-2B

0405-05-96

Required for the provision of working space and to facilitate the construction of the realigned Long Marton and the provision of landscaping and reprofiling.

Work No. 0405-16

0405-05-110

0405-05-111

Required for the provision of working space and to facilitate the construction of the realigned Long Marton.

Work No. 0405-16

Scheme 0405 – The land plans – sheet 6

In the administrative area of Westmorland and Furness Council

0405-06-29

0405-06-41

0405-06-58

Required for the provision of working space and to facilitate the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling, construction compound and storage area.

Work No. 0405-2B

Scheme 0405 – The land plans – sheet 7

In the administrative area of Westmorland and Furness Council

0405-07-06

Required for the provision of working space and to facilitate the improvement of a length of the existing A66 (to be de-trunked) between Powis House and Roger Head Farm and the construction of a new cycleway alongside the carriageway as part of improvements to the existing A66 and the improvement of a length of the existing A66 (to be de-trunked) to the south of Roger Head Farm, the construction of a new cycleway alongside the carriageway as part of improvements to the existing A66, the improvement and re-alignment of the existing B6542, the construction of a new cycleway adjacent to the carriageway of the improved B6542, improvements to a private road junction connecting to the improved B6542, and the construction of new and replacement private means of access and the provision of landscaping and reprofiling.

Work Nos. 0405-19C and 0405-19D

0405-07-18

Required for the provision of working space and to facilitate the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling, construction compound and storage area.

Work No. 0405-2B

0405-07-22

Required for the provision of working space and to facilitate the improvement of a length of the existing A66 (to be de-trunked) to the south of Roger Head Farm, the construction of a new cycleway alongside the carriageway as part of improvements to the existing A66, the improvement and re-alignment of the existing B6542, the construction of a new cycleway adjacent to the carriageway of the improved B6542, improvements to a private road junction connecting to the improved B6542, and the construction of new and replacement private means of access and the provision of new private means of access, landscaping and reprofiling.

Work No. 0405-19D

0405-07-33

0405-07-35

Required for the provision of working space and to facilitate the improvement of a length of the existing A66 (to be de-trunked) to the south of Roger Head Farm, the construction of a new cycleway alongside the carriageway as part of improvements to the existing A66, the improvement and re-alignment of the existing B6542, the construction of a new cycleway adjacent to the carriageway of the improved B6542, improvements to a private road junction connecting to the improved B6542, and the construction of new and replacement private means of access and the provision of landscaping and reprofiling.

Work No. 0405-19D

0405-07-40

Required for the provision of working space and to facilitate the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling.

Work No. 0405-2B

0405-07-41

0405-07-45

Required for the provision of working space and to facilitate the construction of the new A66 eastbound and improvements to sections of the existing A66 eastbound and works related to the construction of a new compact grade separated junction, de-trunking and reclassification of the existing A66, provision of public rights of way (including overbridge) and new and replacement private means of access and the construction of a new footpath crossing the new A66 via a new bridge (Roger Head Farm Bridge), works to effect the stopping up of a length of the existing Footpath 317/004 and private means of access north of the Proposed Roger Head Farm Bridge, and the construction of new private means of access between Roger Head Farm and Roger Head Farm Bridge and the provision of landscaping and reprofiling.

Work Nos. 0405-1B and 0405-21

0405-07-52

Required for the provision of working space and to facilitate the construction of the new A66 eastbound and improvements to sections of the existing A66 eastbound and works related to the construction of a new compact grade separated junction, de-trunking and reclassification of the existing A66, provision of public rights of way (including overbridge) and new and replacement private means of access and the provision of environmental mitigation, landscaping and reprofiling, construction compound and storage area, haul route.

Work No. 0405-1B

0405-07-63

0405-07-94

Required for the provision of working space and to facilitate the improvement of a length of the existing A66 (to be de-trunked) to the south of Roger Head Farm, the construction of a new cycleway alongside the carriageway as part of improvements to the existing A66, the improvement and re-alignment of the existing B6542, the construction of a new cycleway adjacent to the carriageway of the improved B6542, improvements to a private road junction connecting to the improved B6542, and the construction of new and replacement private means of access and the construction of the new A66 westbound and improvements to sections of the existing A66 westbound, including a compact grade separated junction, stopping up and new provision of public rights of way and the provision of landscaping and reprofiling.

Work Nos. 0405-19D and 0405-2B

SCHEME 06 – APPLEBY TO BROUGH

Scheme 06 – The land plans – sheet 1

In the administrative area of Westmorland and Furness Council

06-01-40

06-01-41

06-01-42

06-01-46

06-01-47

06-01-48

06-01-49

06-01-50

06-01-51

06-01-52

06-01-53

06-01-54

Required for the provision of working space and to facilitate works for the improvement of the existing A66 eastbound and westbound single lane carriageway and the construction of an additional carriageway to upgrade the A66 eastbound and westbound single carriageway to a dual carriageway.

Work No. 06-1A

Scheme 06 – The land plans – sheet 2

In the administrative area of Westmorland and Furness Council

06-02-14

Required for the provision of working space and to facilitate works for the improvement of the existing A66 eastbound and westbound single lane carriageway and the construction of an additional carriageway to upgrade the A66 eastbound and westbound single carriageway to a dual carriageway.

Work No. 06-1A

06-02-28

Required for the provision of working space and to facilitate works for the improvement of the existing A66 eastbound and westbound single lane carriageway and the construction of an additional carriageway to upgrade the A66 eastbound and westbound single carriageway to a dual carriageway.

Work No. 06-1A

06-02-23

06-02-27

06-02-34

Required for the provision of working space and to facilitate the construction of works for the improvement and upgrading of the A66, including for use as a haul route.

Work Nos. 06-1A and 06-1B

Scheme 06 – The land plans – sheet 3

In the administrative area of Westmorland and Furness Council

06-03-18

Required for the provision of working space and to facilitate works for the improvement of the existing A66 eastbound and westbound single lane carriageway (including the provision of new cycleway) and the construction of an additional carriageway to upgrade the A66 eastbound and westbound single carriageway to a dual carriageway and the provision of de-trunking works associated with the existing A66.

Work No. 06-1CA

06-03-34

Required for the provision of environmental mitigation.

All works

Scheme 06 – The land plans – sheet 4

In the administrative area of Westmorland and Furness Council

06-04-01

Required for the provision of working space and to facilitate the provision of facilities for use by and for the benefit of the Ministry of Defence (MoD) and the provision of landscaping and reprofiling.

Work No. 06-9

06-04-02

06-04-08

06-04-09

06-04-10

06-04-16

Required for the provision of working space and to facilitate the provision of facilities for use by and for the benefit of the Ministry of Defence (MoD).

Work No. 06-9

Scheme 06 – The land plans – sheet 5

In the administrative area of Westmorland and Furness Council

06-05-23

06-05-25

Required for the provision of working space and to facilitate the construction of part of a new single carriageway local access road connecting Flitholme Road with Langrigg Lane, via the new Flitholme – Langrigg Link, including the construction of a length of new equestrian track to connect to new cycleway, the construction of new private means of access to land and properties on the south side of the new A66, and works to effect the stopping up of a length of Langrigg Lane to the south of the existing A66.

Work No. 06-7

06-05-19

06-05-20

06-05-24

Required for the provision of working space and to facilitate the construction of works for the improvement and upgrading of the A66, including for use as a haul route.

Work No. 06-1D

Scheme 06 – The land plans – sheet 6

In the administrative area of Westmorland and Furness Council

06-06-10

Required for the provision of working space and to facilitate the construction of the new single carriageway local access road connecting the existing de-trunked A66 into Mains Street, Brough and the provision of landscaping and reprofiling, construction of surface water drainage infrastructure, construction compound and storage area.

Work No. 06-8

06-06-31

06-06-40

06-06-45

Required for the provision of working space and to facilitate the construction of the new single carriageway local access road connecting the existing de-trunked A66 into Mains Street, Brough and the provision of landscaping and reprofiling, construction compound and storage area.

Work No. 06-8

SCHEME 07 – BOWES BYPASS

Scheme 07 – The land plans – sheet 1

In the administrative area of Durham County Council

07-01-01

Required for the provision of working space and to facilitate the construction of the new eastbound carriageway of the new all-purpose A66 dual carriageway and the provision of landscaping and reprofiling.

Work No. 07-1A

Scheme 07 – The land plans – sheet 2

In the administrative area of Durham County Council

07-02-59

Required for the provision of working space and to facilitate the improvement of the existing A67 and the construction of new private means of access and the provision of environmental mitigation, landscaping and reprofiling, construction compound and storage area.

Work No. 07-5

SCHEME 08 – CROSS LANES TO ROKEBY

Scheme 08 – The land plans – sheet 2

In the administrative area of Durham County Council

08-02-39

Required for the provision of working space and to facilitate the construction of a new all-purpose dual carriageway (the new A66) and improvements to the existing A66 and the provision of environmental mitigation, landscaping and reprofiling, permanent diversion of third party apparatus, construction compound and storage area, haul route.

Work No. 08-1C

SCHEME 09 – STEPHEN BANK TO CARKIN MOOR

Scheme 09 – The land plans – sheet 2

In the administrative area of the North Yorkshire Council

09-02-09

Required for the provision of working space and to facilitate the construction of a shared equestrian track on the north side of the carriageway, the construction of new private means of access to land (including Browson Bank and an attenuation pond), and the improvement of the northernmost length of the existing Dick Scot Lane where it meets the de-trunked A66 and the new equestrian track and the construction of a new realigned section of the de-trunked A66, works to effect the stopping up of redundant lengths of the existing A66, public rights of way (including an equestrian track and a footway) and private means of access and the provision of landscaping and reprofiling, de-trunking works associated with the existing A66.

Work Nos. 09-3A and 09-3B

09-02-13

Required for the provision of working space and to facilitate the construction of a new realigned section of the de-trunked A66, works to effect the stopping up of redundant lengths of the existing A66, public rights of way (including an equestrian track and a footway) and private means of access and the provision of landscaping and reprofiling, de-trunking works associated with the existing A66.

Work No. 09-3B

Scheme 09 – The land plans – sheet 4

In the administrative area of the North Yorkshire Council

09-04-30

Required for the provision of working space and to facilitate the construction of new westbound carriageway of the A66 and the provision of environmental mitigation, landscaping and reprofiling, haul route.

Work No. 09-1E