xmlns:atom="http://www.w3.org/2005/Atom"
4. The exemption granted by article 3(a) of this Order is subject to compliance with the following conditions—
(a)Creag Riabhach Wind Farm is connected to the total system;
(b)Creag Riabhach Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Creag Riabhach Wind Farm Limited; and
(c)Creag Riabhach Wind Farm Limited is not a licensed generator in respect of Creag Riabhach Wind Farm.