M25 eastbound,Improved M25 eastbound carriageway, as shown between points 10/1 and 10/2 on Sheet 10 of the streets, rights of way and access plans, comprising 40 metres and between point 10/3 on Sheet 10 and point 18/2 on Sheet 18 of the streets, rights of way and access plans, comprising 5,580 metres.,
M25 eastbound on-slip at M25 junction 10,Altered slip road, as shown between point 5/20 on Sheet 5 and point 14/2 on Sheet 14 of the streets, rights of way and access plans, comprising 955 metres.,
M25 eastbound off-slip at M25 junction 10,Improved slip road, as shown between point 11/2 on Sheet 11 and point 5/12 on Sheet 5 of the streets, rights of way and access plans, comprising 900 metres.,
M25 westbound,Improved M25 westbound carriageway, as shown between point 18/1 on Sheet 18 and point 10/4 on Sheet 10 of the streets, rights of way and access plans, comprising 6,050 metres.,
M25 westbound on-slip at M25 junction 10,Improved slip road, as shown between point 5/9 on Sheet 5 and point 11/1 on Sheet 11 of the streets, rights of way and access plans, comprising 1,225 metres.,
M25 westbound off-slip at M25 junction 10,Altered slip road, as shown between point 14/1 on Sheet 14 and point 5/21 on Sheet 5 of the streets, rights of way and access plans, comprising 800 metres.,
A3 northbound to M25 westbound dedicated free-flow slip lane at M25 junction 10,New slip lane, as shown between point 5/3 on Sheet 5 and point 12/5 on Sheet 12 of the streets, rights of way and access plans, comprising 205 metres.,
M25 eastbound to A3 northbound dedicated free-flow slip lane at M25 junction 10,New slip lane, as shown between point 12/4 on Sheet 12 and point 5/15 on Sheet 5 of the streets, rights of way and access plans, comprising 225 metres.,
A3 southbound to M25 eastbound dedicated free-flow slip lane at M25 junction 10,New slip lane, as shown between point 5/18 on Sheet 5 and point 13/1 on Sheet 13 of the streets, rights of way and access plans, comprising 210 metres.,
M25 westbound to A3 southbound dedicated free-flow slip lane at M25 junction 10,New slip lane, as shown between point 13/2 on Sheet 13 and point 5/4 on Sheet 5 of the streets, rights of way and access plans, comprising 250 metres.,

M25 junction 10, circulatory carriageway,For the entire extent of the altered M25 junction 10 circulatory carriageway, as shown between points 5/6 and 5/7 on Sheet 5 of the streets, rights of way and access plans, comprising 725 metres.,
A3 northbound,Improved A3 northbound carriageway, as shown between point 1/1 on Sheet 1 and point 8/12 on Sheet 8 of the streets, rights of way and access plans, comprising 5,325 metres.,
A3 northbound on-slip at the A3 Ockham Park junction,Improved slip road, as shown between points 1/15 and 1/16 on Sheet 1 of the streets, rights of way and access plans, comprising 90 metres and between point 1/16 on Sheet 1 and point 2/2 on Sheet 2 of the streets, rights of way and access plans, comprising 650 metres.,
A3 northbound off-slip at M25 junction 10,Improved slip road, as shown between point 4/11 on Sheet 4 and point 5/8 on Sheet 5 of the streets, rights of way and access plans, comprising 315 metres.,
A3 northbound on-slip at M25 junction 10,Improved slip road, as shown between point 5/14 on Sheet 5 and point 6/2 on Sheet 6 of the streets, rights of way and access plans, comprising 465 metres.,
A3 northbound off-slip at the A3 Painshill junction,Improved slip road, as shown between point 7/3 on Sheet 7 and point 8/5 on Sheet 8 of the streets, rights of way and access plans, comprising 685 metres.,
A3 northbound on-slip at the A3 Painshill junction,Improved slip road, as shown between points 8/10 and 8/11 on Sheet 8 of the streets, rights of way and access plans, comprising 120 metres.,
A3 southbound,Improved A3 southbound carriageway, as shown between point 8/13 on Sheet 8 and point 1/2 on Sheet 1 of the streets, rights of way and access plans, comprising 5,530 metres.,
A3 southbound off-slip at the A3 Painshill junction,Improved slip road, as shown between points 8/14 and 8/15 on Sheet 8 of the streets, rights of way and access plans, comprising 245 metres.,
A3 southbound on-slip at the A3 Painshill junction,Improved slip road, as shown between point 8/19 on Sheet 8 and point 7/2 on Sheet 7 of the streets, rights of way and access plans, comprising 785 metres.,
A3 southbound off-slip at M25 junction 10,Altered slip road, as shown between point 6/1 on Sheet 6 and point 5/19 on Sheet 5 of the streets, rights of way and access plans, comprising 305 metres.,
A3 southbound on-slip at M25 junction 10,Altered slip road, as shown between point 5/5 on Sheet 5 and point 4/1 on Sheet 4 of the streets, rights of way and access plans, comprising 870 metres.,
A3 southbound off-slip at the A3 Ockham Park junction,Improved slip road, as shown between point 2/1 on Sheet 2 and point 1/22 on Sheet 1 of the streets, rights of way and access plans, comprising 380 metres.,


A3 Painshill junction (A245),For the entire extent of the improved Painshill junction, as shown between points 8/3 and 8/4 on Sheet 8 of the streets, rights of way and access plans, comprising 430 metres.,
A3 northbound to A245 westbound dedicated slip road at the A3 Painshill junction,New slip road, as shown between points 8/1 and 8/2 on Sheet 8 of the streets, rights of way and access plans, comprising 180 metres.,
A245 Byfleet Road westbound,Improved A245 westbound carriageway, as shown between point 8/6 on Sheet 8 and point 9/1 on Sheet 9 of the streets, rights of way and access plans, comprising 540 metres.,
A245 Byfleet Road eastbound,Improved A245 eastbound carriageway, as shown between point 9/2 and 9/4 on Sheet 9 and between point 8/27 and 8/9 on Sheet 8 of the streets, rights of way and access plans, comprising 190 metres.,
A245 Portsmouth Road (eastbound),A245 eastbound carriageway at the tie-in with the improved Painshill junction, as shown between points 8/16 and 8/17 on Sheet 8 of the streets, rights of way and access plans, comprising 170 metres.,
A245 Portsmouth Road (westbound),A245 westbound carriageway at the tie-in with the improved Painshill junction, as shown between points 8/17 and 8/18 on Sheet 8 of the streets, rights of way and access plans, comprising 170 metres.,

A3 Ockham Park junction (B2039),For the entire extent of the improved A3 Ockham Park junction circulatory carriageway forming part of the B2039, as shown between points 1/20 and 1/21 on Sheet 1 of the streets, rights of way and access plans, comprising 420 metres.,
B2115 Portsmouth Road,At the tie-in with the A3 Ockham Park junction, as shown between points 1/6 and 1/7 on Sheet 1 of the streets, rights of way and access plans, comprising 235 metres.,
B2039 Ockham Road North,At the tie-in with the A3 Ockham Park junction, as shown between points 1/27 and 1/28 on Sheet 1 of the streets, rights of way and access plans, comprising 60 metres.,
B2039,At the tie-in between the A3 Ockham Park junction circulatory carriageway and the Mill Lane junction, as shown between points 1/16 and 1/17 on Sheet 1 of the streets, rights of way and access plans, comprising 75 metres.,
B365 Seven Hills Road (north of the A245 Byfleet Road junction),Improved B365 Seven Hills Road at the tie-in with the A245 Byfleet Road junction, as shown between points 9/9 and 9/10 on Sheet 9 of the streets, rights of way and access plans, comprising 110 metres.,

Old Lane,At the tie-in, as shown between points 4/2 and 4/3 on Sheet 4 of the streets, rights of way and access plans, comprising 145 metres and as shown between points 24/3 and 24/4 on Sheet 24 of the streets, rights of way and access plans, comprising 145 metres.,

Mill Lane,At the tie-in with the improved B2039 Ockham Park junction, as shown between points 1/18 and 1/19 on Sheet 1 of the streets, rights of way and access plans, comprising 55 metres.,
Wisley Lane,New and improved road, as shown between point 1/25 on Sheet 1 and point 20/3 on Inset A of Sheet 20 of the streets, rights of way and access plans, comprising 1,905 metres.,
Seven Hills Road (south of the A245 Byfleet Road junction and currently classified as B365),Improved road and road to be declassified, as shown between point 7/1 on Sheet 7 and point 9/8 on Sheet 9 of the streets, rights of way and access plans, comprising 190 metres.,
A245 Byfleet Road westbound to Seven Hills Road dedicated slip-road,New road, as shown between points 9/6 and 9/7 on Sheet 9 of the streets, rights of way and access plans, comprising 40 metres.,
Elm Lane,Improved unclassified road, as shown between point 23/1 on Sheet 23 and point 24/1 on Sheet 24 of the streets, rights of way and access plans, comprising 240 metres.,
Byway Open to All Traffic – Byway 525 (Elm Lane),Improved Byway Open to All Traffic, as shown between points 24/1 and 24/2 on Sheet 24 of the streets, rights of way and access plans, comprising 565 metres.,


M25 junction 10 circulatory carriageway,The whole length of the altered circulatory carriageway at M25 junction 10, for a total distance of 725 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,

M25 eastbound,Along the length of the improved M25 eastbound carriageway, for a total distance of 5,580 metres, as shown on Sheets 3, 5, 7 and 9 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
M25 eastbound on-slip at M25 junction 10,Along the length of the altered slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the M25 eastbound carriageway, for a total distance of 955 metres, as shown on Sheets 3 and 7 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
M25 eastbound off-slip at M25 junction 10,Along the length of the improved slip road, from its diverge from the M25 eastbound carriageway to its merge with the M25 junction 10 circulatory carriageway, for a total distance of 900 metres, as shown on Sheets 3 and 5 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
M25 westbound,Along the length of the improved M25 westbound carriageway, for a total distance of 6,050 metres, as shown on Sheets 3, 5, 7 and 9 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
M25 westbound on-slip at M25 junction 10,Along the length of the improved slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the M25 westbound carriageway, for a total distance of 1,225 metres, as shown on Sheets 3 and 5 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
M25 westbound off-slip at M25 junction 10,Along the length of the improved slip road, from its diverge from the M25 westbound carriageway to its merge with the M25 junction 10 circulatory carriageway, for a total distance of 800 metres, as shown on Sheets 3 and 7 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,

A3 northbound to M25 westbound dedicated free-flow slip lane at M25 junction 10,Along the length of the new slip road, from its diverge from the A3 northbound off-slip to its merge with the M25 westbound on-slip, for a total distance of 205 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour) ,
M25 eastbound to A3 northbound dedicated free-flow slip lane at M25 junction 10,Along the length of the new slip road, from its diverge from the M25 eastbound off-slip to its merge with the A3 northbound on-slip, for a total distance of 225 metres as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour) ,
A3 southbound to M25 eastbound dedicated free-flow slip lane at M25 junction 10,Along the length of the new slip road, from its diverge from the A3 southbound off-slip to its merge with the M25 eastbound on-slip, for a total distance of 210 metres as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour) ,
M25 westbound to A3 southbound dedicated free-flow slip lane at M25 junction 10,Along the length of the new slip road, from its diverge from the M25 westbound off-slip to its merge with the A3 southbound on-slip, for a total distance of 250 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour) ,

A3 northbound,Along the length of the improved A3 northbound carriageway for a total distance of 5,325 metres, as shown on Sheets 1, 2, 3 and 4 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 northbound on-slip at A3 Ockham Park junction (south of Mill Lane junction),Along the length of the improved slip road from its diverge from the Ockham Park junction circulatory carriageway to the Mill Lane junction, for a total distance of 90 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,40 miles per hour,
A3 northbound on-slip at A3 Ockham Park junction (north of Mill Lane junction),Along the length of the improved slip road, north of the Mill Lane junction to its merge with the A3 northbound carriageway, for a total distance of 650 metres, as shown on Sheets 1 and 2 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 northbound off-slip at M25 junction 10,Along the length of the improved slip road, from its diverge from the A3 northbound carriageway to its merge with the M25 junction 10 circulatory carriageway, for a total distance of 315 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 northbound on-slip at M25 junction 10,Along the length of the improved slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the A3 northbound carriageway, for a total distance of 465 metres as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 northbound off-slip at A3 Painshill junction,Along the length of the improved slip road from its diverge from the A3 northbound carriageway to point E, for a total distance of 500 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 northbound off-slip at A3 Painshill junction,Along the length of the improved slip road, from point E to its merge with the Painshill junction circulatory carriageway, for a total distance of 185 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A3 northbound on-slip at A3 Painshill junction,Along the length of the improved slip road, from its diverge from the A3 Painshill junction circulatory carriageway to point F, for a total distance of 60 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A3 northbound on-slip at A3 Painshill junction,Along the length of the improved slip road, from point F to the DCO boundary, for a total distance of 60 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound,Along the length of the improved A3 southbound carriageway for a total distance of 5,530 metres, as shown on Sheets 1, 2, 3 and 4 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound off-slip at A3 Painshill junction,Along the length of the improved slip road from its diverge from the A3 southbound carriageway to point G, for a total distance of 115 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound off-slip at A3 Painshill junction,Along the length of the improved slip road, from point G to its merge with the A3 Painshill junction circulatory carriageway, for a total distance of 130 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A3 southbound on-slip at A3 Painshill junction,Along the length of the improved slip road from its diverge from the A3 Painshill junction circulatory carriageway to point H, for a total distance of 350 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A3 southbound on-slip at A3 Painshill junction,Along the length of the improved slip road, from point H to its merge with the A3 southbound carriageway, for a total distance of 435 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound off-slip at M25 junction 10,Along the length of the altered slip road, from its diverge from the A3 southbound carriageway to its merge with the M25 junction 10 circulatory carriageway, for a total distance of 305 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound on-slip at M25 Junction 10,Along the length of the altered slip road, from its diverge from the M25 junction 10 circulatory carriageway to its merge with the A3 southbound carriageway, for a total distance of 870 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound off-slip at A3 Ockham Park junction,Along the length of the improved slip road, from its diverge from the A3 southbound carriageway to point A, for a total distance of 270 metres, as shown on Sheets 1and 2 of the speed limits and traffic regulations plans.,National speed limit  (70 miles per hour, as existing limit) ,
A3 southbound off-slip at A3 Ockham Park junction,Along the length of the improved slip road, from point A to its merge with the Ockham Park junction circulatory carriageway, for a total distance of 110 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,40 miles per hour,

A3 Painshill junction,The whole length of the improved circulatory carriageway at the Painshill junction, for a total distance of 430 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A3 northbound to A245 westbound dedicated slip lane at the A3 Painshill junction,Along the length of the new slip road, from its diverge from the A3 northbound off-slip to its merge with the A245 westbound carriageway, for a total distance of 180 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A245 Byfleet Road westbound,Along the length of the improved A245 Byfleet Road westbound carriageway from its diverge from the A3 Painshill junction circulatory carriageway to point J, for a total distance of 540 metres, as shown on Sheet4 of the speed limits and traffic regulations plans.,40 miles per hour,
A245 Byfleet Road eastbound,Along the length of the improved A245 Byfleet Road eastbound carriageway, from point J to its merge with the Painshill junction circulatory carriageway, for a total distance of 545 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A245 Portsmouth Road eastbound,The A245 Portsmouth Road eastbound carriageway at the tie-in with the improved Painshill junction, for a total distance of 170 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,
A245 Portsmouth Road westbound,A245 Portsmouth Road westbound carriageway at the tie-in with the improved Painshill junction, for a total distance of 170 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour,

Ockham Park junction (B2039),The whole length of the improved circulatory carriageway at the Ockham Park junction, for a total distance of 420 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,40 miles per hour (as existing limit),
B2115 Portsmouth Road,Along the length of the improved B2115 at its tie-in with the A3 Ockham Park junction, for a total distance of 235 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,40 miles per hour (as existing limit),
B2039 Ockham Road North,Along the length of the improved B2039 Ockham Road North at its tie-in with the A3 Ockham Park junction, for a total distance of 60 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,40 miles per hour (as existing limit),
B2039 (A3 Ockham Park junction to Mill Lane junction),Along the length of the improved B2039 between its junction with Mill Lane and the A3 Ockham Park junction circulatory carriageway, for a total distance of 90 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,40 miles per hour,
B365 Seven Hills Road  (north of the A245 Byfleet Road junction)  See also entry for Seven Hills Road below. ,At the tie-in with the A245 Byfleet Road junction, for a total distance of 40 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,40 miles per hour (as existing limit),

Old Lane,At the tie-in with the A3 southbound on-slip at M25 junction 10, for a total distance of 130 metres, as shown on Sheet 3 of the speed limits and traffic regulations plans; and at the tie-in with improved Byway Open to All Traffic 525 (Elm Lane), for a total distance of 80 metres, as shown on Sheet 24 of the speed limits and traffic regulations plans.,40 miles per hour (as existing limit),

Mill Lane,At the tie-in with the improved B2039 Ockham Park junction and the A3 northbound on-slip, for a total distance of 55 metres, as shown on Sheet 1 of the speed limits and traffic regulations plans.,National Speed Limit (60 miles per hour, as existing limit),
Wisley Lane diversion,Along the length of the new Wisley Lane diversion, from its diverge from the A3 Ockham Park junction circulatory carriageway to point B, for a total distance of 770 metres, as shown on Sheets 1 and 2 of the speed limits and traffic regulations plans.,40 miles per hour,
Wisley Lane Diversion/realignment,Along the length of the diverted, realigned and improved Wisley Lane from point B to point C, for a total distance of 1,140 metres, as shown on Sheet 2 of the speed limits and traffic regulations plans.,30 miles per hour,
Elm Lane (and including Byway 525 – Byway Open to All Traffic),Along the length of Elm Lane from point D to point E, to include that part of Elm Lane which is classified as a Byway Open to All Traffic (Byway 525), for a total distance of 785 metres, as shown on Sheets 2 and 8 of the speed limits and traffic regulations plans.,20 miles per hour,
A245 Byfleet Road westbound to Seven Hills Road (south) dedicated slip road,Along the length of the new slip road from its diverge from the A245 westbound carriageway to its merge with Seven Hills Road, for a total distance of 40 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,20 miles per hour,
Seven Hills Road (south of the A245 Byfleet Road junction and currently classified as B365),Along the length of Seven Hills Road from its junction with the A245 Byfleet Road southwards to point I, for a total distance of 170 metres, as shown on Sheet 4 of the speed limits and traffic regulations plans.,20 miles per hour,


A3 northbound carriageway,From a point 220m south of the Ockham Park South Underbridge, as shown by point 1/1 on Sheet 1 of the speed limits and traffic regulations plans, north for a distance of 5200 metres, to the junction with the on-slip from the A245 (Painshill Junction), as shown by point 4/5 on Sheet 4 of the speed limits and traffic regulations plans.,Prohibition of pedestrians.  Prohibition of cyclists.  Prohibition of ridden or accompanied horses. ,
A3 northbound on-slip at the A3 Ockham Park junction,From the junction with Mill Lane, as shown by point 1/2 on Sheet 1 of the speed limits and traffic regulations plans, north for a distance of 645 metres, to the junction with the A3 northbound mainline, as shown by point 2/1 on Sheet 2 of the speed limits and traffic regulations plans.,Prohibition of pedestrians.  Prohibition of cyclists.  Prohibition of ridden or accompanied horses. ,
A3 southbound carriageway,From the junction with the off-slip to the A245 (Painshill Junction), as shown by point 4/6 on Sheet 4 of the speed limits and traffic regulations plans, south for a distance of 5405 metres, to a point 220m south of the Ockham Park South Underbridge, as shown by point 1/3 on Sheet 1 of the speed limits and traffic regulations plans.,Prohibition of pedestrians.  Prohibition of cyclists.  Prohibition of ridden or accompanied horses. ,
A3 southbound on-slip at the A3 Painshill junction,From the junction with Heyswood Camp Site access road, as shown by point 4/7 on Sheet 4 of the speed limits and traffic regulations plans, south for a distance of 605 metres, to the junction with the A3 southbound mainline, as shown by point 4/8 on Sheet 4 of the speed limits and traffic regulations plans.,Prohibition of pedestrians.  Prohibition of cyclists.  Prohibition of ridden or accompanied horses. ,

A245 Byfleet Road,From its junction with the A3 roundabout circulatory, as shown by point 4/1 on Sheet 4 of the speed limits and traffic regulations plans, northwest for a distance of 495 metres, to its junction with B365 Seven Hills Road, as shown by point 4/2 on Sheet 4 of the speed limits and traffic regulations plans.,Clearway (to include verge and hard strips).,

B365 Seven Hills Road,At the junction with the A245 Byfleet Road Only left turns are permitted for southbound traffic from B365 Seven Hills Road, as shown by point 4/4 on Sheet 4 of the speed limits and traffic regulations plans.,Prohibition of Entry (Left turn only).,

Wisley Lane,The whole length of both kerb lines from Ockham Park junction (B2039) to a point 125 metres north of the access to RHS Garden Wisley, as shown between points 1/4 and 2/4 on Sheets 1 and 2 of the speed limits and traffic regulations plans.,Prohibition of waiting (at any time).,
Elm Lane (Byway Open to All Traffic),Improved section of the Byway Open to All Traffic from its junction with Old Lane, west for a distance of 555 metres, as shown between points 2/10 on Sheet 2 and 8/1 on Sheet 8 of the speed limits and traffic regulations plans.,Prohibition of waiting (at any time).,

A3 layby north of Wisley Lane,The A3 Trunk Road (Wisley) (Prohibition of Waiting) Order 2003,Order to be revoked in its entirety. For location, refer to point 2/8 on Sheet 2 of the speed limits and traffic regulations plans.,
A3 Ockham Common Lay-by,The A3 Trunk Road (Ockham Common Lay-By) (Waiting Restrictions) Order 2004,Order to be revoked in its entirety. For location, refer to point 2/9 on Sheet 2 of the speed limits and traffic regulations plans.,
A245 Byfleet Road eastbound and westbound,The Borough of Elmbridge (Portsmouth Road/Byfleet Road) (Speed Limit) Order 1993,Order to be varied from National Speed Limit to 40 miles per hour between the junction of A245 Byfleet Road with Seven Hills Road, and a point 95 metres west of Convent Lane, including the Painshill junction circulatory carriageway, as shown between points 4/3 and 4/9 on Sheet 4 of the speed limits and traffic regulations plans.,
Wisley Road,The Surrey County Council, Various Roads in the Parished Areas Within The Borough of Guildford (Consolidation of Waiting Restrictions and Street Parking Places) Order 2004,Order to be revoked between the junction of Wisley Lane and the northbound A3, and the tie-in with the Wisley Lane diversion, as shown between points 2/2 and 2/3 on Sheet 2 of the speed limits and traffic regulations plans.,
Elm Lane,The Surrey County Council, Various Roads in the Parished Areas Within The Borough of Guildford (Consolidation of Waiting Restrictions and Street Parking Places) Order 2004,Order to be revoked between the junction of Elm Lane and the southbound A3, and the point just west of Orchard Cottage access, between points 2/5 and 2/6 and inclusive of point 2/7 on Sheet 2 of the speed limits and traffic regulations plans.,

Cycle track,65 metres of cycle track connecting the A3 northbound with the B2115 Portsmouth Road, as shown between points 1/3 and 1/4 on Sheet 1 of the streets, rights of way and access plans.,
Footway,15 metres of footway in verge of the B2115 Portsmouth Road, as shown between points 1/5 and 1/33 on Sheet 1 of the streets, rights of way and access plans.,
Non-segregated footway/cycle track,310 metres of non-segregated footway/cycle track in verge of the B2215 Portsmouth Road and B2039 Ockham Park junction, as shown between points 1/5 and 1/8 on Sheet 1 of the streets, rights of way and access plans, with a signal controlled toucan crossing facility at point 1/e as shown on Sheet 1.,
Non-segregated footway/cycle track,25 metres of non-segregated footway/cycle track at the tie-in between the B2115 Portsmouth Road and the A3 Ockham Park junction circulatory carriageway, as shown between points 1/9 and 1/10 on Sheet 1 of the streets, rights of way and access plans, with a signal controlled toucan crossing facility located at point 1/a as shown on Sheet 1.,
Non-segregated footway/cycle track,370 metres of non-segregated footway/cycle track in verge of the B2215 Portsmouth Road and B2039 Ockham Park junction, as shown between points 1/11 and 1/12 on Sheet 1 of the streets, rights of way and access plans, with signal controlled toucan crossing facilities located at points 1/b, 1/c and 1/d as shown on Sheet 1.,
Footway,70 metres of footway in the verge of the A3 Ockham Park junction and the A3 northbound on-slip, as shown between points 1/13 and 1/14 on Sheet 1 of the streets, rights of way and access plans.,
Bridleway,50 metres of bridleway in verge of the A3 Ockham Park junction and the B2039 Ockham Road North, as shown between points 1/12 and 1/26 on Sheet 1 of the streets, rights of way and access plans.,
Footway,75 metres of footway in verge of the A3 southbound off-slip at the Ockham Park junction, as shown between points 1/23 and 1/24 on Sheet 1 of the streets, rights of way and access plans.,
Bridleway,1,340 metres of bridleway in verge, as shown between point 1/12 on Sheet 1 and point 20/5 on Sheet 20 of the streets, rights of way and access plans.,
Footpath,105 metres of footpath, as shown between points 1/29 and 1/31 on Sheet 1 of the streets, rights of way and access plans.,
Bridleway,320 metres of bridleway, as shown between point 2/3 on Sheet 2 and point 23/1 on Sheet 23 of the streets, rights of way and access plans, to include reclassification of 175 metres of unclassified road (Elm Lane) to bridleway, as shown between point 2/11 on Sheet 2 and point 23/1 on Sheet 23 of the streets, rights of way and access plans.,
Footpath,130 metres of footpath, as shown between points 2/4 and 2/7 on Sheet 2 of the streets, rights of way and access plans, comprising the reclassification of 130 metres of an existing unclassified road (Elm Lane) as footpath.,
Footpath,30 metres of footpath, as shown between points 2/5 and 2/7 on Sheet 2 of the streets, rights of way and access plans.,
Footpath,5,855 metres of footpath, as shown between point 2/7 on Sheet 2 and point 3/2 on Sheet 3 of the streets, rights of way and access plans.,
Footpath,105 metres of footpath, as shown between point 2/10 on Sheet 2 and point 3/1 on Sheet 3 of the streets, rights of way and access plans.,
Bridleway,845 metres of bridleway, as shown between point 4/4 on Sheet 4 and point 12/6 on Sheet 12 of the streets, rights of way and access plans.,
Bridleway,20 metres of bridleway, as shown between points 4/4 and 4/6, as shown on Sheet 4 of the streets, rights of way and access plans.,
Bridleway,180 metres of bridleway, as shown between points 4/7 and 4/8 on Sheet 4 of the streets, rights of way and access plans.,
Footpath,75 metres of footpath, as shown between points 4/8 and 4/9 on Sheet 4 of the streets, rights of way and access plans.,
Bridleway,1,100 metres of bridleway, as shown between point 5/22 on Sheet 5 and point 14/3 on Sheet 14 of the streets, rights of way and access plans.,
Bridleway,815 metres of bridleway, as shown between point 5/35 on Sheet 5 and point 13/6 on Sheet 13 of the streets, rights of way and access plans, comprising the reclassification of 775 metres of unclassified road (Pointers Road) to bridleway.,
Footpath,370 metres of footpath, as shown between point 6/3 on Sheet 6 and point 28/1 on Sheet 28 of the streets, rights of way and access plans.,
Bridleway,1,300 metres of bridleway, as shown between point 6/5 on Sheet 6 and point 12/1 on Sheet 12 of the streets, rights of way and access plans.,
Bridleway,860 metres of bridleway, as shown between point 6/6 on Sheet 6 and point 13/5 on Sheet 13 of the streets, rights of way and access plans.,
Bridleway,4,265 metres of bridleway, as shown between point 7/1 on Sheet 7 and point 20/5 on Sheet 20 of the streets, rights of way and access plans, to include the reclassification of 140 metres of Seven Hills Road from B365 to bridleway.,
Non-segregated footway/cycle track,140 metres of non-segregated footway/cycle track in the verge of the A3 Painshill junction roundabout, as shown between points 8/24 and 8/26 on Sheet 8 of the streets, rights of way and access plans.,
Non-segregated footway/cycle track,550 metres of non-segregated footway/cycle track in the verge of the A245 Byfleet Road westbound carriageway westbound carriageway, as shown between point 8/24 on Sheet 8 and point 9/11 on Sheet 9 of the streets, rights of way and access plans.,
Footpath,175 metres of footpath adjacent to the A3 southbound on-slip at the A3 Painshill junction, as shown between points 8/20 and 8/23 on Sheet 8 of the streets, rights of way and access plans.,
Footway,12 metres of footway between the new dedicated slip road connecting the A245 Byfleet Road (westbound) with Seven Hills Road (south) and the A245 Byfleet Road/Seven Hills Road junction, as shown between points 9/12 and 9/13 on Sheet 9 of the streets, rights of way and access plans.,
Footway,130 metres of footway in verge of A245 Byfleet Road (eastbound), as shown between points 9/3 and 9/4 on Sheet 9 of the streets, rights of way and access plans.,
Bridleway,445 metres of bridleway, as shown between points 11/3 and 11/4 on Sheet 11 of the streets, rights of way and access plans.,
Footpath,135 metres of footpath, as shown between points 20/1 and 20/2 on Sheet 20 of the streets, rights of way and access plans.,
Byway 525 (Byway Open to All Traffic) improvement,565 metres of Byway Open to All Traffic, as shown between points 24/1 and 24/2 on Sheet 24 of the streets, rights of way and access plans.,
Footpath,558 metres of footpath, as shown between points 26/1 and 26/2 on Sheet 26 of the streets, rights of way and access plans.,
Footpath,12 metres of footpath, as shown between points 26/3 and 26/4 on Sheet 26 of the streets, rights of way and access plans.,
Bridleway,855 metres of bridleway, as shown between point 27/1 on Sheet 27 and point 28/2 on Sheet 28 of the streets, rights of way and access plans.,

Non-segregated footway/cycle track in the verge of the A3 Ockham Park junction (to be extinguished),For a distance of 90 metres, as shown between points 1/23 and 1/32 on Sheet 1 of the streets, rights of way and access plans.,Work Nos. 31(g) and 31(h),
Non-segregated footway/cycle track in the verge of the A3 southbound carriageway, to include four crossings at M25 junction 10 (to be extinguished),For a distance of 4,550 metres, as shown between point 1/24 on Sheet 1 and point 8/22 on Sheet 8 of the streets, rights of way and access plans and for a distance of 65 metres as shown between points 8/20 and 8/21 Sheet 8 of the streets, rights of way and access plans.,Work Nos. 33, 35, 42(c) and 44(c),
Footpath 13A,For a distance of 130 metres, as shown between points 1/29 and 1/34 on Sheet 1 of the streets, rights of way and access plans.,Work Nos. 32 and 33,
Footpath 13,For a distance of 165 metres, as shown between points 1/30 and 1/34 on Sheet 1 of the streets, rights of way and access plans.,Work Nos. 32 and 33,
Elm Lane (unclassified public road),For a distance of 330 metres, as shown between point 2/6 on Sheet 2 and point 23/1 on Sheet 23 of the streets, rights of way and access plans and for a distance of 25 metres as shown between points 2/4 and 2/11 on Sheet 2 of the streets, rights of way and access plans.,Work No.50  Note: Existing highway to be reclassified in part as footpath and in part as bridleway. ,
Wisley Lane (classified unnumbered road),For a distance of 240 metres, as shown between point 2/8 on Sheet 2 and point 20/4 on Sheet 20 of the streets, rights of way and access plans.,Work No.33,
Footway over Wisley Footbridge (to be extinguished),For a distance of 140 metres, as shown between points 2/9 and 2/12 on Sheet 2 of the streets, rights of way and access plans.,Work No.33,
Footpath 7,For a distance of 195 metres, as shown between point 2/9 on Sheet 2 and point 20/1 on Sheet 20 of the streets, rights of way and access plans and including 10 metres of footpath between points 2/13 and 2/14 as shown on Sheet 2 of the streets, rights of way and access plans.,Work No.33(g),
Footpath 14,For a distance of 95 metres, as shown between points 3/2 and 3/3 on Sheet 3 of the streets, rights of way and access plans.,Work Nos. 34 and 36,
Footpath 17 (to include Footpath 17 Cockcrow Overbridge),For a distance of 160 metres, as shown between points 4/9 and 4/10 on Sheet 4 of the streets, rights of way and access plans.,Work No.35(b),
Non-segregated footway/cycle track in the verge of the A3 northbound off-slip at M25 junction 10 including crossing over slip road (to be extinguished),For a distance of 245 metres, as shown between points 5/1 and 5/2 on Sheet 5 of the streets, rights of way and access plans.,Work No.35,
A3 northbound off-slip at M25 junction 10,For a distance of 45 metres, as shown between points 5/10 and 5/11 on Sheet 5 of the streets, rights of way and access plans.,Work No.14,
M25 circulatory carriageway and associated footways/cycle tracks on west side of junction 10 roundabout, to include tie-ins to M25 westbound on-slip and M25 eastbound off-slip and three crossings,For a distance of 225 metres, as shown between points 5/23 and 5/24 on Sheet 5 of the streets, rights of way and access plans.,Work Nos. 7 and 35,
M25 circulatory carriageway and associated footways/cycle tracks on east side of junction 10 roundabout,For a distance of 225 metres, as shown between points 5/25 and 5/26 on Sheet 5 of the streets, rights of way and access plans.,Work Nos. 7 and 35,
Non-segregated footway/cycle track in the verge of the A3 northbound on-slip at M25 junction 10 (to be extinguished),For a distance of 560 metres, as shown between point 5/13 on Sheet 5 and point 6/5 on Sheet 6 of the streets, rights of way and access plans.,Work No.35,
A3 northbound on-slip at M25 junction 10,For a distance of 50 metres, as shown between points 5/27 and 5/28 on Sheet 5 of the streets, rights of way and access plans.,Work No.14,
A3 southbound off-slip at M25 junction 10,For a distance of 115 metres, as shown between points 5/29 and 5/30 on Sheet 5 of the streets, rights of way and access plans.,Work No.19,
M25 eastbound on-slip at M25 junction 10,For a distance of 280 metres, as shown between point 5/31 on Sheet 5 and point 13/3 on Sheet 13 on the streets, rights of way and access plans.,Work No.26,
M25 westbound off-slip at M25 junction 10,For a distance of 325 metres, as shown between point 5/32 on Sheet 5 and point 13/4 on Sheet 13 on the streets, rights of way and access plans.,Work No.28,
A3 southbound on-slip at M25 junction 10,For a distance of 90 metres, as shown between points 5/33 and 5/34 on Sheet 5 of the streets, rights of way and access plans.,Work No.4,
Bridleway 12,For a distance of 360 metres, as shown between points 5/16 and 5/17 on Sheet 5 of the streets, rights of way and access plans.,Work Nos. 35, 38 and 39,
Footpath 12,For a distance of 130 metres, as shown between point 5/16 on Sheet 5 and point 28/1 on Sheet 28 of the streets, rights of way and access plans.,Work Nos. 35 and 38 and the upgrade of an existing permissive path as shown between point 6/3 on Sheet 6 and point 28/1 on Sheet 28 of the streets, rights of way and access plans.,
Footway A245 Byfleet Road (westbound) (to be extinguished),For a distance of 30 metres, as shown between points 9/6 and 9/13 on Sheet 9 of the streets, rights of way and access plans.,Work Nos. 42(c) and 42(f),
Bridleway 8 at Clearmount Bridge,For a distance of 300 metres, as shown between point 11/4 on Sheet 11 and point 12/2 on Sheet 12 of the streets, rights of way and access plans and for a distance of 175 metres as shown between point 11/5 on Sheet 11 and point 12/1 on Sheet 12 on the streets, rights of way and access plans.,Work No.49,
Footpath 10 (at Clearmount Bridge),For a distance of 15 metres, as shown between points 12/7 and 12/8 on Sheet 12 of the streets, rights of way and access plans.,Work No.49,
Footpath 11 at Clearmount Bridge,For a distance of 125 metres, as shown between points 12/2 and 12/3 on Sheet 12 of the streets, rights of way and access plans.,Work No.49,
Bridleway 8 at Wisley Lane,For a distance of 55 metres, as shown between points 20/6 and 20/7 on Sheet 20 of the streets, rights of way and access plans.,Work No.35,

Footway (to be extinguished),For a distance of 20 metres, as shown between points 2/15 and 2/16 on Sheet 2 of the streets, rights of way and access plans.,This footway currently provides access to a bus stop on the A3 – this bus stop is to be relocated under Work No.33(f) and no substitute is therefore required.,
Footpath 9,For a distance of 30 metres, as shown between points 3/4 and 3/5 on Sheet 3 of the streets, rights of way and access plans.,This section of Footpath 9 terminates at the A3 boundary, as shown at point 3/5 on Sheet 3 of the streets, rights of way and access plans and currently has no connection with any other right of way at this point. Footpath 9 will now terminate at Work No.35, which will provide a connection to the Cockcrow Overbridge.,
Footpath 10 (near Cockcrow Bridge)  Also see entry for Footpath 10 at Clearmount Bridge in Part 1 above ,For a distance of 70 metres, as shown between points 4/4 and 4/5 on Sheet 4 of the streets, rights of way and access plans.,This section of Footpath 10 terminates at the A3 boundary, as shown at point 4/5 on Sheet 4 of the streets, rights of way and access plans and currently has no connection with any other right of way at this point. Footpath 10 will now terminate at Work No.35 which will provide a connection to the Cockcrow Overbridge.,
Pointers Road,For a distance of 815 metres, as shown between point 5/35 on Sheet 5 and point 13/6 on Sheet 13 of the streets, rights of way and access plans.,This section of unclassified public road is not currently accessible to vehicles. This section is to be reclassified as public bridleway – Work No.37.,
Old Byfleet Road (unclassified highway),For a distance of 300 metres, as shown between point 8/25 on Sheet 8 and point 9/5 on Sheet 9 of the streets, rights of way and access plans.,Old Byfleet Road is a cul de sac and provides access to Feltonfleet School only.  Work No.44(c) will provide a substitute route for non-motorised users. ,

Access to RHS Garden Wisley, Wisley Lane,At point A, as shown on Sheet 2 of the streets, rights of way and access plans.,Work No.33(f),
Access to Ockham Bites Café and Car Park, Old Lane, Cobham,At points B and C, as shown on Sheet 4 of the streets, rights of way and access plans.,Work No.35(d),
Access to Hut Hill Cottage, Pond Farm and the Birchmere Scout Camp, Wisley,At point D as shown on Sheet 4 of the streets, rights of way and access plans.,Work Nos. 35(b), 35(c) and 35(d),
Access to Court Close Farm,At point F as shown on Sheet 7 of the streets, rights of way and access plans.,Work No.40,
Access to the Heyswood Girl Guide Camp,At point F as shown on Sheet 7 of the streets, rights of way and access plans.,Work No.40,
Access to Long Orchard Farm, No. 1 Farm Cottage, No. 3 Farm Cottage, Long Orchard House, Fir Tree Cottage and The Coach House,At point G, as shown on Sheet 7 of the streets, rights of way and access plans.,Work Nos. 35, 35(h) and 35(i),
Access to the Starbucks Drive Thru Cafe,At point H, as shown on Sheet 7 of the streets, rights of way and access plans.,Work Nos. 35 and 35(j),
Access to New Farm,At point I, as shown on Sheet 7 of the streets, rights of way and access plans.,Work Nos. 40,

Painshill Park emergency access from A3 southbound carriageway,At point E, as shown on Sheet 6 of the streets, rights of way and access plans.,There is reasonably convenient access to the land otherwise than from the street or private means of access concerned.,

Private maintenance access to an electricity pylon from the A3 Painshill junction,As shown at point 8/i on Sheet 8 of the streets, rights of way and access plans – (see Work No.48).,
Private means of access from Elm Lane to residential property, ‘Orchard Cottage’.,As shown at point 23/i on Sheet 23 of the streets, rights of way and access plans – (see Work No.34).,


1/18a,To provide, construct, inspect, retain, access, maintain, renew and repair environmental mitigation works on land adjoining Stratford Brook.,Work No.54,
1/40,To construct, retain, inspect, operate, access maintain and repair a diverted gas pipeline and associated equipment.,Work No.63(a),

2/8,For use as a construction access route. To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.34,
2/9, 2/10, 2/14,For use as a construction access route. For use as a maintenance access for the authorised development.,Work No.23(b) Work No.33(c) Work No.33(d) Work No.36 Work No.52(c) Work No.63(a),
2/12,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment and a filter drain.,Work No.63(a),
2/12a,To construct, operate, access and maintain a carrier drain.,Work No.52(b),
2/13a,To construct, access and maintain a pre-earthworks ditch.,Work No.33,
2/14a,For use as a construction access route. To construct a footpath and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, operate, access and maintain a carrier drain. For use as a maintenance access for the authorised development.,Work No.33(c) Work No.52(b) Work No.63(a),
2/14b,For use as a construction access route. To construct a footpath and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, operate, access and maintain a carrier drain. For use as a maintenance access for the authorised development.,Work No.33(c) Work No.52(b) Work No.63(a),
2/28a,To construct the realignment of the access to RHS Garden Wisley, to include provision of a new bus stop facility. To construct, operate, access, and maintain the diversion of electric cables and associated apparatus and equipment.,Work No.33(f) Work No.62(c),
2/28c,To construct the realignment of the access to RHS Garden Wisley, to include provision of a new bus stop facility. To construct, operate, access, and maintain the diversion of electric cables and associated apparatus and equipment. To construct, operate, access, and maintain the diversion of telecommunication cables, media cables and equipment.,Work No.33(f) Work No.62(c) Work No.65(c),
2/36,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to a gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.63(a),

3/3a,To construct and use as a maintenance access for the authorised development.,Work No.1(a) Work No.1(c) Work No.64(a),
3/3b,To construct, operate, access and maintain a diversion to a gas pipeline and associated equipment, the width of the new right not to exceed 6 metres.,Work No.63(a),
3/3d,To construct and use as a maintenance access in relation to a gantry and utility diversion.,Work No.64(a) Work No.23(c),
3/9,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(b),
3/13,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(a),
3/16,To construct a footpath and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.36,
3/19,To construct, inspect, access and maintain a retaining wall and associated planting.,Work No.5(c),
3/19a,To undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation and enhancement works.,Work No.55,
3/25,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right not to exceed 6 metres. To construct, operate, access and maintain an extension of an existing culvert. For use as a maintenance access for the authorised development.,Work No.1(e) Work No.35 Work No.63(a),
3/26a,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, operate, access and maintain an extension of an existing culvert. To construct, operate, access and maintain a carrier drain. For use as a maintenance access for the authorised development.,Work No.1(e) Work No.35 Work No.52(d) Work No.63(a),
3/27,To construct, operate, access and maintain an extension of an existing culvert.,Work No.1(e),
3/31,Right of access for the purposes of environmental compensation works.,Work No.57 Work No.58,
3/32,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right not to exceed 6 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.63(a),
3/37,To construct, operate, access and maintain an extension of an existing culvert. To construct, operate, access and maintain a carrier drain. To undertake, retain, inspect, access, maintain, a highway fence.,Work No.1(e) Work No.52(d),

4/1,Right of access for the purposes of environmental compensation works.,Work No.57 Work No.58,
4/3c,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres. To construct, inspect, access and maintain a retaining wall and highway fence. For use as a maintenance access for the authorised development.,Work No.1(a) Work No.1(c) Work No.35 Work No.63(a),
4/3d,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, operate, access and maintain a diversion to existing electric lines, cables, equipment and apparatus. The width of the new right within the plot not to exceed 6 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.62(d) Work No.63(a),
4/4, 4/4a, 4/10,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres. To construct, inspect, access and maintain a retaining wall and highway fence. For use as a maintenance access for the authorised development.,Work No.35 Work No.63(a),
4/4b,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to existing electric lines, cables, equipment and apparatus, the width of the new right within the plot not to exceed 6 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.62(d) Work No.63(a),
4/15a,To undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation and enhancement works.,Work No.55,
4/20,To construct a bridleway and use as a substitute private means of access, and maintenance access. For use as a maintenance access for the authorised development.,Work No.35 Work No.35(b) Work No.35(d),
4/21,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(d),
4/22b,To construct and use an access to environmental compensation works.,Work No.58(d),
4/23,To construct a bridleway and associated drainage and for use as a substitute private means of access, maintenance access, and for the maintenance of Cockcrow overbridge. For use as a maintenance access for the authorised development.,Work No.35 Work No.35(b) Work No.35(d),
4/30,To construct an access and associated drainage and for use as a substitute private means of access. The width of the new rights within the plot not to exceed 3.5 metres.,Work No.35(c),
4/31, 4/34,To construct a bridleway and use as a maintenance access. The width of the new rights within the plot not to exceed 3 metres. For use as a maintenance access for the authorised development.,Work No.35,
4/37, 4/38,To construct, access and maintain a soakaway.,Work No.52(f),
4/41,To construct a bridleway and use as a maintenance access. To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10. To construct, access and maintain a soakaway and pre-earthwork ditch. The width of the new rights within the plot not to exceed 3 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.7,
4/43, 4/45a,To construct a bridleway and associated drainage, for use as a substitute private means of access, maintenance access and for the maintenance of Cockcrow overbridge. The width of the new rights within the plot not to exceed 4.1 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.35(b),
4/43a,To construct, access and maintain a soakaway.,Work No.35,
4/43b,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new rights within the plot not to exceed 6 metres. To construct, inspect, access and maintain a highway fence.,Work No.63(a),
4/43c,To construct a bridleway and use as a maintenance access. The width of the new rights within the plot not to exceed 3 metres. For use as a maintenance access for the authorised development.,Work No.35,
4/43d,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres. To construct, inspect, access and maintain a highway fence. For use as a maintenance access for the authorised development.,Work No.35 Work No.63(a),
4/46,To construct, maintain and use an access to a drainage attenuation pond.,Work No.52(e),
4/47,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, operate, access and maintain a filter drain. The width of the new rights within the plot not to exceed 6 metres.,Work No.63(a),
4/47a, 4/47b,To construct a bridleway and associated drainage and for use as a substitute private means of access and maintenance access. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment, the width of the new right within the plot not to exceed 6 metres. For use as a maintenance access for the authorised development.,Work No.35 Work No.63(a),
4/47d,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment and filter drain.,Work No.63(a),
4/48a, 4/49a,To construct an access and associated drainage and for use as a substitute private means of access. The width of the new right within the plot not to exceed 3.5 metres.,Work No.35(c),
4/51,To construct a bridleway and associated drainage and for use as a substitute private means of access and maintenance access. For use as a maintenance access for the authorised development.,Work No.35(c),
4/51a,To construct a bridleway and use as a maintenance access. The width of the new right within the plot not to exceed 3 metres. For use as a maintenance access for the authorised development.,Work No.35,
4/52, 4/54, 4/67,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(c),
4/61,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, operate, access and maintain a filter drain. The width of the new right within the plot not to exceed 6 metres.,Work No.63(a),
4/63,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. The width of the new right within the plot not to exceed 6 metres.,Work No.63(a),
4/72,To construct and use an access as a private means of access and maintenance access. To construct, maintain and use an access to a drainage attenuation pond. To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works. For use as a construction access route in connection with environmental compensation works. For use as a maintenance access for the authorised development.,Work No.52(e) Work No.58(c),
4/73, 4/75, 4/79a, 4/86a,To construct, maintain and use an access to a drainage attenuation pond.,Work No.52(e),
4/82,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. The width of the new right within the plot not to exceed 6 metres.,Work No.63(a),

5/1c,To construct, access and maintain a soakaway.,Work No.52(g),
5/1d,To construct a bridleway. To operate, access and maintain a pre-earthwork ditch, environmental barrier.,Work No.35 Work No.52(g) Work No.61(d),
5/7,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing watercourse. For use as a maintenance access for the authorised development.,Work No.35 Work No.53(e),
5/7a,To construct a bridleway and use as a maintenance access. To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10. For use as a maintenance access for the authorised development.,Work No.35 Work No.52(i) Work No.7,
,,,
5/7c,To construct, access and maintain a soakaway and pre-earthwork ditch.,Work No.35,
5/7d, 5/7e,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a carrier drain. To construct, operate, access and maintain a diversion to an existing watercourse. For use as a maintenance access for the authorised development.,Work No.35 Work No.37 Work No.52(i) Work No.53(e),
5/8,To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.37,
5/8a,To construct, operate, access and maintain a diversion to an existing watercourse. To construct, access and maintain a soakaway.,Work No.53(e),
5/8b,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a diversion to an existing watercourse. To construct, access and maintain a soakaway.,Work No.53(e),
5/12a, 5/12b,To construct, operate, access and maintain a diversion to existing electric cables and associated apparatus and equipment. To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.,Work No.62(g) Work No.7,
5/12c,To construct, operate, inspect, access and maintain an environmental barrier and soakaway. To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.,Work No.61(a) Work No.7,
5/13a, 5/13c,To construct, operate, inspect, access and maintain an environmental barrier. To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.,Work No.61(a) Work No.7,
5/13b,To construct, operate, access and maintain a diversion to existing electric cables and associated apparatus and equipment. To construct, operate, inspect, access and maintain an environmental barrier. To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10.,Work No.61(a) Work No.62(g) Work No.7,
5/21,To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10. To construct, access and maintain a pre-earthwork ditch. To construct, maintain and use an access to a drainage attenuation pond.,Work No.7 Work No.52(h),
5/21a,To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10. To construct, access and maintain a pre-earthwork ditch.,Work No.7,
5/24, 5/24a,To access land to be used for the construction of a temporary slip road in connection with improvements to the M25 junction 10. To construct, access and maintain a pre-earthwork ditch. To construct, operate, inspect, access and maintain an environmental barrier.,Work No.7 Work No.61(b),
5/30,To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.35,

6/1b, 6/3a,To construct, access and maintain a pre-earthwork ditch.,Work No.35,
6/2,To construct a bridleway and use as a maintenance access. To construct, operate, inspect, access and maintain an environmental barrier and filter drain. For use as a maintenance access for the authorised development.,Work No.35 Work No.35(f) Work No.61(c),
6/2b,To construct a bridleway and use as a maintenance access. To construct, operate, inspect, access and maintain an environmental barrier and filter drain. For use as a maintenance access for the authorised development.,Work No.35 Work No.61(c),
6/4,To construct, operate, inspect, access and maintain an environmental barrier and filter drain. To construct, operate, access and maintain the diversion of telecommunication cables, media cables and equipment,Work No.61(c) Work No.65(a),
6/4a, 6/4b,To construct, operate, inspect, access and maintain an environmental barrier and filter drain.,Work No.61(c),
6/9, 6/10,To construct a bridleway and use as a maintenance access. To construct, operate, inspect, access and maintain a retaining wall and filter drain. For use as a maintenance access for the authorised development.,Work No.35 Work No.39,
6/23a,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.,Work No.63(c),

7/9, 7/10,To construct, operate, access and maintain modifications to access to gas valve compound.,Work No.17(c) Work No.40,
7/15, 7/15a, 7/16,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.,Work No.63(c),
7/17,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To undertake, access and maintain tree and shrub planting.,Work No.63(a),
7/23,To construct a bridleway and for use as a private means of access and for use as a maintenance access. To construct, operate, access and maintain diversions to existing utility connections and associated apparatus and equipment. For use as a construction access route. For use as a maintenance access for the authorised development.,Work No.35 Work No.35(k),

8/5b, 8/5c,To construct, access and maintain the authorised development. To construct, operate, access and maintain a diversion to electric cables and associated apparatus and equipment. To access and maintain utility apparatus and equipment.,Work No.18 Work No.18(b) Work No.40 Work No.65(a),
8/7,To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment. To construct, inspect, access and maintain a highway fence.,Work No.63(c),
8/11,To access, inspect and maintain a retaining wall.,Work. No.16,
8/12,To construct an access and use as a private means of access. To construct, operate, access and maintain a diversion to electric cables and associated apparatus and equipment. To access, inspect and maintain a retaining wall.,Work No.46 Work No.16 Work No.62(o),
8/12a,To access, inspect and maintain a retaining wall.,Work. No.16,

9/3,To construct an access and use as a private means of access. To access, inspect and maintain a retaining wall.,Work No.46 Work No.16,
9/13,To construct, operate, inspect, access and maintain a carrier drain.,Work No.52(l),

11/2,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.57(a),
11/3,To undertake, access and maintain tree and shrub planting.,Work No.29,
11/4,To undertake, retain, inspect, access, maintain, monitor and renew environmental mitigation works.,Work No 60,
11/6,To construct, a bridleway, and filter drain.,Work No.49,
11/14,To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development. To construct, operate, access and maintain a soakaway and environmental barrier.,Work No.49 Work No.61(b),
11/14a,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b),
11/18, 11/18b,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. To construct, inspect, access and maintain a retaining wall. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b),
11/19,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a soakaway, pre-earthwork ditch and environmental barrier. The width of the new rights within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b),
,,,
11/19a,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. To construct, inspect, access and maintain a retaining wall. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b),
11/20,To construct, operate, access and maintain a soakaway.,Work No.49,
11/21,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a pre-earthwork ditch. For use as a maintenance access for the authorised development.,Work No.49,
11/22, 11/22a,To construct, operate, access and maintain a soakaway and environmental barrier.,Work No.49 Work No.61(a),
11/23, 11/24a,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a soakaway and an environmental barrier. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a),
11/24,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain a soakaway and an environmental barrier. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a),
11/25,To construct a bridleway and use as a maintenance access. The width of the new right within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49,
11/25a,To construct a bridleway and use as a maintenance access.,Work No.49,
11/29,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(e),

12/1c,To construct, operate, access and maintain an environmental barrier.,Work No.49,
12/4,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. The width of the new right within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a) Work No.52(m),
12/4a, 12/5a, 12/5c, 12/5d, 12/5e, 12/7, 12/12, 12/17,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a) Work No.52(m),
12/5b,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. The width of the new right within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a) Work No.52(m),
12/6,To construct, operate, access and maintain an environmental barrier.,Work No.49 Work No.61(a) Work No.52(m),
12/11,To construct a bridleway and use as a maintenance access and for the maintenance of Clearmount overbridge. To construct, operate, access and maintain an environmental barrier. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a) Work No.52(m),
12/18,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. The width of the new right within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(a) Work No.52(m),
12/23,To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.49 Work No.52(m),
12/25,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. To undertake, access and maintain shrub planting. For use as a maintenance access for the authorised development. To construct, operate, access and maintain a diverted gas pipeline and associated equipment.,Work No.49 Work No.61(a) Work No.52(m) Work No.63(e),
12/25b,To construct, operate, access and maintain an environmental barrier. To undertake, access and maintain shrub planting. To construct, operate, access and maintain a diverted gas pipeline and associated equipment.,Work No.61(a)Work No.63(e),
12/25c,To construct, operate, access and maintain a soakaway and an environmental barrier.,Work No.61(a),
12/27,To construct a bridleway and use as a maintenance access. To construct, inspect, access and maintain a retaining wall. For use as a maintenance access for the authorised development.,Work No.49,
12/28,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. The width of the new rights within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b),
12/30,To construct a bridleway and use as a maintenance access. The width of the new rights within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49,
12/31,To construct a bridleway and use as a maintenance access. To construct, operate, access and maintain an environmental barrier. The width of the new rights within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b),
12/34,To construct a bridleway and use as a maintenance access. To construct, maintain and use an access to a drainage attenuation pond. To construct, operate, access and maintain an environmental barrier. The width of the new rights within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b) Work No.52(h),
12/34a,To construct, maintain and use an access to a drainage attenuation pond. To construct, operate, access and maintain an environmental barrier. To construct, operate, access and maintain a diversion to an existing gas pipeline and associated equipment.,Work No.52(h) Work No.61(b) Work No.63(e),
12/34b,To construct, maintain and use an access to a drainage attenuation pond. To construct, operate, access and maintain an environmental barrier. The width of the new rights within the plot not to exceed 3.5 metres.,Work No.52(h) Work No.61(b),
12/34c,To construct a bridleway and use as a maintenance access. To construct, maintain and use an access to a drainage attenuation pond. To construct, operate, access and maintain an environmental barrier. The width of the new rights within the plot not to exceed 3.5 metres. For use as a maintenance access for the authorised development.,Work No.49 Work No.61(b) Work No.52(h),

13/2, 13/2d,To construct, access and maintain a pre-earthworks ditch.,Work No.26 Work No.35(e),
13/2e,To construct, access and maintain a pre-earthworks ditch and environmental barrier.,Work No.26 Work No.35(e) Work No.61(c),
13/4c, 13/4d,To construct, access and maintain a pre-earthworks ditch and environmental barrier.,Work No.28 Work No.61(d),
13/4e, 13/4f, 13/4g,To construct, access and maintain a pre-earthworks ditch.,Work No.28,
 13/9b,To construct, access and maintain a pre earthworks ditch and environmental barrier.,Work No.26 Work No.35(e) Work No.61(c),
13/9c,To construct, access and maintain a filter drain and environmental barrier.,Work No.26 Work No.35(e) Work No.61(c),
13/10, 13/11, 13/11a,To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.37 Work No.51(i),
13/14, 13/15,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(d),

20/2, 20/3, 20/4,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(f),

21/1,Right of access for the purposes of environmental compensation works.,Work No.58(g),
21/1a,Right of access for the purposes of environmental compensation works.,Work No.57 Work No.58,
21/2,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(g),

23/1,To construct a bridleway and use as a maintenance access. For use as a maintenance access for the authorised development.,Work No.34,

25/1,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.58(h),

26/1,To undertake, retain, inspect, access, maintain, monitor and renew environmental compensation works.,Work No.57(b),
26/2,Right of access for the purposes of environmental compensation works. The width of the new rights within the plot not to exceed 3.5 metres.,Work No.57(b),


1/6,The main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials.,All works,
1/14,Required for works to tie in the B2039 Ockham Road North to the improved A3 Ockham Park junction.,Work No.31(c), Work No.31(h),
1/30, 1/31,For works relating to the improvement of Mill Lane at the tie-in with the A3 northbound on-slip and construction of a drainage attenuation pond.,Work No.31(e), Work No.31(d), Work No.52(a),

2/1,For the provision of a topsoil and materials storage and processing area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.,All Works Work No.34,
2/1a,To provide working space for the construction of a highway, a bridleway and a highway fence.,Work No.33, Work No.63(a),
2/1b,To provide working space for the construction of a highway, a bridleway and highway fence.,Work No.33,
2/2, 2/4,For the provision of a topsoil and materials storage area, structures worksite, traffic management area and welfare facilities.,All Works,
2/3,For the provision of a topsoil and materials storage and a structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.,All Works Work No.34,
2/5a,To provide working space for the construction of a highway and bridleway.,Work No.33,
2/5c,For the construction of a bridleway.,Work No.34,
2/6,For the provision of a topsoil and materials storage area, structures worksite, traffic management area, welfare facilities and for the construction of a bridleway.,Work No.34 All Works,
2/11,To provide working space for a utility diversion.,Work No.33, Work No.63(a),
2/13,For the construction of a highway and utilities diversion.,Work No.33, Work No.63(a),
2/21, 2/21a,For the improvement and widening of the A3 northbound and to provide working space for the construction of a retaining wall and utility diversion.,Work No.2, Work No.64(a),
2/26,To provide working space and access for the realignment of Wisley Lane and diversion of a footpath.,Work No.33(e), Work No.33(h),
2/27a,To provide working space and access for the realignment of Wisley Lane.,Work No.33(e),
2/28,To provide working space and access and to allow the construction of a temporary road.,Work No.33(e), Work No.33(f), Work No.33(g), Work No.65(c),
2/28b,To provide working space and access during modifications to the entrance to RHS Garden Wisley and utility diversions.,Work No.33(e), Work No.33(f), Work No.33(g), Work No.62(c), Work No.65(c),
2/30,To provide working space and access and remediation of redundant carriageway.,Work No.33(e),
2/31, 2/32,To provide sufficient working space and access for the realignment of Wisley Lane and diversion of a footpath.,Work No.33(e), Work No.33(h),
2/33,To provide working space and access for diversion of a footpath.,Work No.33(h),

3/3, 3/3c,To provide working space to construct a bridleway and utility diversion.,Work No.35, Work No.63(a),
3/7,To provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound.,Work No.1(c), Work No.23(c), Work No.35, Work No.63(a), Work No.64(a),
3/13a,To provide working space for utility diversion.,Work No.63(a),
3/19b,To provide working space for the improvement of A3 southbound, works to a watercourse and access for environmental mitigation and enhancement works.,Work No.5(c), Work No.5(d), Work No.36, Work No.53(b), Work No.55,
3/24,To provide working space to construct a bridleway, utility diversions, gantry, highways fence and for the improvement and widening of the A3 northbound.,Work No.1(c), Work No.23(c), Work No.35, Work No.63(a), Work No.64(a),
3/33,To provide working space to construct a bridleway, a utility diversion, and for environmental mitigation works.,Work No.35, Work No.63(a), Work No.56,
3/34,To provide working space to construct a bridleway, utility diversion and highway fence.,Work No.35, Work No.63(a),
3/37a,To provide working space to extend a culvert, construct a utility diversion and a highway fence.,Work No.1(e), Work No.63(a),

4/3, 4/3b,To provide working space to construct a bridleway, a utilities diversion and for environmental mitigation works.,Work No.35, Work No.56, Work No.63(a),
4/3a,To provide sufficient working space and access to construct a new maintenance access and bridleway, to divert a gas pipeline and associated equipment, to build a highway fence and to construct a filter drain.,Work No.35, Work No.63(a),
4/4c,To provide working space to construct a bridleway, a utility diversion, a highways fence and for the improvement and widening of the A3 northbound.,Work No.1(c), Work No.35, Work No.63(a),
4/15b,To provide working space for the alteration of the A3 southbound on-slip, improvement of junction of Old Lane, a utility diversion and construction of a highways fence.,Work No.4, Work No.65(a),
4/19,To provide working space for the construction of a bridleway, stopping up of existing accesses and improvement of junction of Old Lane.,Work No.4, Work No.35(d),
4/22,To provide working space to construct a bridleway and footpath.,Work No.35, Work No.35(b), Work No.35(d),
4/22a,To provide working space for the realignment of the access points to Ockham Common Car Park and to construct a bridleway and soakaway.,Work No.35(d),
4/24,To provide working space for the realignment of the access points to Ockham Bites Café and Ockham Common Car Park, the construction of a bridleway, the alteration and widening of the A3 southbound on-slip, the construction of an environmental barrier and highways fence and a utility diversion.,Work No.4, Work No.35(d), Work No.65(a), Work No.61(d),
4/25,To provide working space for the alteration and widening of the A3 southbound on-slip, improvement of junction of Old Lane and utility diversions,Work No.4, Work No.62(f), Work No.65(a),
4/27,To provide working space to construct a bridleway.,Work No.35(d),
4/30a,To provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utilities diversion.,Work No.4, Work No.35(b), Work No.35, Work No.61(d), Work No.65(a),
4/32, 4/33,To provide working space to construct a bridleway and footpath.,Work No.35, Work No.35(b),
4/35,To provide working space for the alteration and widening of the A3 southbound on-slip, demolition of the Cockcrow overbridge, the construction of bridleway, environmental barrier and utility diversion.,Work No.4, Work No.35, Work No.61(d), Work No.65(a),
4/40, 4/40a,To provide working space to construct a bridleway, a utility diversion, and to construct an access to a drainage attenuation pond.,Work No.35(b), Work No.35(c), Work No.63(a), Work No.52(e),
4/42,To provide working space to construct a bridleway, a drainage attenuation pond and a soakaway.,Work No.35, Work No.52(f),
4/45, 4/45a,To provide working space for the widening of the A3 northbound, construction of a gantry, bridleway, utility diversions and a highways fence.,Work No.1(c), Work No.23(d), Work No.35, Work No.62(e), Work No.63(a), Work No.64(b), Work No.65(d),
4/46a, 4/46b,To provide working space to construct a bridleway and utility diversion.,Work No.35, Work No.63(a),
4/48, 4/49, 4/49b,To provide working space to construct a bridleway and realignment to a private means of access.,Work No.35(c),
4/48b,To provide working space to construct a bridleway, realignment to a private means of access and soakaway.,Work No.35(c),
4/52a,For use as a construction access route.,All Works,
4/57,To provide working space to construct a bridleway and utilities diversion.,Work No.35(c), Work No.63(a),
4/58,To provide working space and access to construct a bridleway, utilities diversion, environmental barrier and improvement of the A3 northbound carriageway.,Work No.1(c), Work No.35(c), Work No.63(a), Work No.61(a),
4/62,To provide working space to construct utilities diversion, environmental barrier and improvement of the A3 northbound carriageway.,Work No.1(c), Work No.63(a), Work No.61(a),
4/64, 4/65, 4/66, 4/66a,To provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond.,Work No.63(a), Work No.52(e),
4/69,For the provision of a structures worksite.,Work No.35(b),
4/74, 4/76, 4/78, 4/78a, 4/79, 4/80,To provide working space to construct an access to a drainage attenuation pond.,Work No.52(e),
4/81, 4/81a,To provide working space to construct a utility diversion and to construct an access to a drainage attenuation pond.,Work No.63(a), Work No.52(e),
4/84,To provide working space to for the demolition of the Cockcrow overbridge, construction of a drainage attenuation pond, utilities diversions, environmental barrier and improvement of the A3 northbound carriageway.,Work No.1(c), Work No.63(a), Work No.61(a), Work No.35(b), Work No.52(e), Work No.61(a),
4/88,For the provision of a site compound and working space for the improvement of the A3 northbound off-slip and construction of a drainage attenuation pond.,All Works,

5/1,For the provision of topsoil storage and to provide working space for the construction of a free-flow slip lane, alteration and widening of the M25 westbound off-slip, a bridleway, utilities diversions and environmental barrier.,Work No.11, Work No.28, Work No.35, Work No.62(f), Work No.61(d), Work No.65(a),
5/2,To provide working space to construct a bridleway and a drainage attenuation pond and fencing.,Work No.35, Work No.52(g),
5/2a,To provide working space to construct a drainage attenuation pond and fencing.,Work No.52(g),
5/7b,To provide working space for the construction of a free-flow slip lane, for the alteration and widening of the M25 eastbound on-slip and the construction of a bridleway, environmental barrier and the diversion or realignment of a watercourse.,Work No.10, Work No.26, Work No.35, Work No.53(f), Work No.61(c),
5/9,To provide working space to construct a bridleway, a diversion or realignment of a watercourse and to construct a drainage attenuation pond and fencing.,Work No.35, Work No.53(f), Work No.52(i),
5/11,For use as a construction access route.,All Works,
5/12,To provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion, improvement of the M25 westbound on-slip and for the diversion and/or realignment of a watercourse.,Work No.29, Work No.8, Work No.53(d), Work No.62(g), Work No.61(a),
5/13,To provide working space for the construction of a temporary slip road, free-flow slip lane, environmental barrier, for a utility diversion and improvement of A3 northbound off-slip.,Work No.3, Work No.8, Work No.62(g), Work No.61(a),
5/22, 5/23,To provide working space for the construction of a temporary slip road, free-flow slip lane, the improvement, realignment and widening of the M25 eastbound off-slip, the improvement, realignment and widening of the A3 northbound on-slip and the construction of an environmental barrier.,Work No.9, Work No.14, Work No.25, Work No.61(b),
5/31,To provide working space to construct a gantry.,Work No.23(f),

6/2a, 6/12, 6/12a,,To provide working space to construct a bridleway.,Work No.35,
6/5, 6/5a,For use as a structures worksite.,Work No.35(f),
6/13, 6/13a, 6/13b, 6/14,To provide working space to construct a bridleway.,Work No.39,
6/18,To provide working space for the improvement of the A3 southbound carriageway, works associated with stopping up an access to Painshill Park, to construct a retaining wall, a utility diversion and a highway fence.,Work No.17(a), Work No.17(b), Work No.17(e), Work No.65(a),
6/21a, 6/21b,To provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence.,Work No.17(a), Work No.17(b), Work No.23(h), Work No.65(a),
6/22b,To provide working space for the improvement of the A3 southbound carriageway, to construct a retaining wall, a utility diversion and a highway fence.,Work No.17(a), Work No.17(b), Work No.65(a),

7/6,For the provision of a construction site compound.,All works,
7/12, 7/22,For the provision of topsoil and materials storage.,All works,
7/13, 7/13a, 7/14,To provide access and working space for a utility diversion.,Work No.63(c),
7/23a, 7/28,To provide working space for the improvement and widening of the A3 northbound off-slip, utility diversion and highway fence.,Work No.16, Work No.62(k),

8/7a, 8/7b,To provide working space to construct a footpath, utilities diversions and highways fence.,Work No.41, Work No.62(l), Work No.63(c), Work No.65(a),
8/27, 8/28, 8/29, 8/30,To provide working space to improve the A245 Portsmouth Road at the tie-in with the A3 Painshill junction.,Work No.42(a), Work No.42(b),
8/34,To provide working space to improve the A3 southbound carriageway, the A3 Painshill junction and the A245 Portsmouth Road at the tie-in with the A3 Painshill junction.,Work No.17(a), Work No.42(a), Work No.42(b),

9/4,To provide working space to construct improvements to the A245 Byfleet Road westbound and eastbound carriageways and B365 Seven Hills Road, a dedicated slip road, a utility diversion and a highway fence.,Work No.44(a), Work No.44(e), Work No.44(f), Work No.45, Work No.47(a), Work No.62(p),
9/4a,To provide working space to construct new private access to Feltonfleet School from B365 Seven Hills Road.,Work No.45, Work No.46,
9/7,To provide working space to construct improvements and widening to the A245 Byfleet Road westbound and eastbound carriageways, a dedicated slip road, stopping up of an access, utilities diversions and a highway fence.,Work No.44(a), Work No.44(b), Work No.44(c), Work No.44(d), Work No.44(e), Work No.44(f), Work No.47(a), Work No.47(b), Work No.62(p), Work No.62(o),
9/8, 9/9, 9/10,To provide working space and construct improvements to the A245 Byfleet Road eastbound carriageway.,Work No.47(a),
9/12,To provide working space for the improvement and widening of the A245 Byfleet Road eastbound carriageway and for the construction of a footway, utilities diversions and a highway fence.,Work No.47(a), Work No.47(b), Work No.47(e), Work No.62(q), Work No.64(k), Work No.65(h),

11/1,To provide working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip and the construction of an environmental barrier.,Work No.27(a), Work No.29, Work No.61(a),
11/9, 11/9a,For the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier.,All Works,
11/10, 11/10a, 11/11,For the provision of topsoil and materials storage and working space for the improvement of the M25 westbound carriageway, the improvement and widening of the M25 westbound on-slip, the construction of a soakaway and an environmental barrier.,All Works,
11/26,To provide working space for the construction of a bridleway and drainage attenuation pond and fencing.,Work No.49, Work No.52(m),

12/1d,To provide working space for the construction of a bridleway and drainage attenuation pond and fencing.,Work No.49, Work No.52(m),
12/5,To provide working space for the construction of a bridleway and demolition and replacement of existing Clearmount overbridge.,Work No.49,
12/25a,To provide working space for the construction of a bridleway tie-in to an existing permissive signposted route.,Work No.49,
12/25d,To provide working space for the construction of a new gas main diversion under the M25.,Work No.63(e),

13/1,To provide working space to construct a bridleway, a diversion or realignment of a watercourse and drainage ditch.,Work No.35(e), Work No.53(f),
13/1a,To provide working space to construct a bridleway.,Work No.35(e),
 13/9,For use as a construction compound.,All works.,

20/1a, 20/5,For modifications to road signage.,Work No.33(i),

23/2,For modifications to the entrance to Orchard Cottage.,Work No.34,
23/3,To provide working space for the construction of a turning head on Elm Lane.,Work No.34,
23/5, 23/6,To provide access to construction of Work No.34.,Work No.34,
23/7,For modifications to the entrance to Orchard Cottage and to provide working space for the construction of a turning head on Elm Lane. To provide access to construction of Work No.34.,Work No.34,

24/1,To provide working space to tie-in Elm Lane to Elm Corner.,Work No.50(a),
24/2,For the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane.,Work No.50(a),
24/3,For the improvement of Byway 525 (Byway Open to All Traffic), between Elm Corner and Old Lane. To provide working space to tie-in Elm Lane to Hatch Lane.,Work No.50(a),
24/4, 24/4a, 24/4b,To provide working space to tie-in Elm Lane to Old Lane and to install two toad underpasses and associated reptilian fencing along Old Lane. To provide working space to clear trees and other vegetation to create a visibility splay including road traffic mitigation measures,Work No.50(a) Work No.50(b),

26/2a,To provide working space for the construction of a footpath.,Work No.51,

Group TPO  Multiple species woodland ,Potential disturbance to roots or lopping of branches to enable construction of a new bridleway and to ensure that any overhanging branches will not constitute a danger to the public or obstruct access once the bridleway is open for use.,Work No.39,Part of Tower Hill, Painshill Park Estate  TPO ref: P1/201/151 dated 15.06.1948 Guildford Borough Council ,
Group TPO  Mixed coniferous and deciduous woodland ,Potential requirement for some lopping of trees to ensure that none of the trees will constitute a danger to the public once the replacement land and proposed new bridleway are open for use and for some localised felling within the dense stand of birch to improve accessibility for use of the land as replacement common land/public open space.,Work No.59(a),Foxwarren Park Estate  TPO ref: P1/201/105 dated 25.10.1956 Guildford Borough Council ,
Group TPO comprising 2 Turkey Oaks and 2 Sweet Chestnut,Potential disturbance to the roots and a requirement for the lopping of one Turkey Oak within the G2 group TPO and for disturbance to the root protection area of a second Turkey Oak within the same TPO group, to enable construction of a new footpath and associated earthworks and the diversion of utilities.,Work Nos. 41, 62(l), 63(c), 64(j) and 65(a),Land at Painshill House and adjacent properties on the north side of Painshill Park, Cobham  TPO ref: EL:11/47  dated 08.06.2012 Group 2  Elmbridge Borough Council ,

Sheet 2,2/17, 2/17a, 2/17b, 2/20, 2/29,
Sheet 3,3/8, 3/11, 3/12, 3/17, 3/21, 3/22, 3/23,
Sheet 4,4/5, 4/5a, 4/6, 4/8, 4/9, 4/15, 4/17, 4/18, 4/26, 4/39, 4/59, 4/85, 4/87,
Sheet 5,5/1a, 5/5, 5/10, 5/14, 5/19, 5/20,
Sheet 6,6/3, 6/7, 6/8,
Sheet 11,11/3a, 11/4a, 11/8, 11/8a, 11/27/ 11/28,
Sheet 12,12/1, 12/1a, 12/1b, 12/3, 12/14, 12/16, 12/32, 12/33, 12/33a,
Sheet 13,13/1b, 13/2a, 13/2b, 13/2c, 13/4, 13/4a,
Sheet 28,28/2,

 (*)  In part: The remaining parts of each of these plots fall within Part 3. The parts of the plots in question are those parts of the plots in respect of which the rights required are for (a) earthworks to access tracks, (b) drainage ditches and infiltration ditches and (c) earthworks to access tracks that will be on the highways side of environmental barrier fencing.   ,
Sheet 2,2/36,
Sheet 3,3/32,
Sheet 4,4/3c , 4/3d , 4/4 , 4/4a , 4/23 , 4/31 , 4/34 , 4/41 , 4/43 , 4/51a , 4/72,
Sheet 5,5/1c, 5/1d, 5/7a , 5/7c, 5/8a, 5/21, 5/24a, 5/30,
Sheet 6,6/1b, 6/9 , 6/10,
Sheet 11,11/19 , 11/19a, 11/21,,
Sheet 12,12/1c, 12/4a, 12/5a, 12/5c, 12/5e, 12/6, 12/7, 12/25c, 12/31, 12/34 , 12/34b , 12/34c,
Sheet 13,13/2, 13/2e, 13/4c, 13/4d,

 (*)  In part: The remaining parts of each of these plots fall within Part 2. The parts of the plots in question are those parts of the plots in respect of which the rights required are for (a) access tracks, including access tracks which serve ditches (b) filter drains and associated access space and (c) soakaways and associated access space.   ,
Sheet 2,2/12, 2/12a, 2/13a, 2/36,
Sheet 3,3/3a, 3/3b, 3/3d, 3/9, 3/13, 3/16, 3/19, 3/19a, 3/25, 3/26a, 3/27, 3/31,3/32 , 3/37,
Sheet 4,4/1, 4/3c , 4/3d , 4/4 , 4/4a , 4/4b, 4/10, 4/15a, 4/21, 4/22b, 4/23 , 4/30, 4/31 , 4/34 , 4/37, 4/38, 4/41 , 4/43 , 4/43a, 4/43b, 4/43c, 4/43d, 4/45a, 4/46, 4/47, 4/47a, 4/47b, 4/47d, 4/48a, 4/49a, 4/51, 4/51a , 4/52, 4/54, 4/61, 4/63, 4/67, 4/72 , 4/73, 4/75, 4/79a, 4/82, 4/86a,
Sheet 5,5/7, 5/7a , 5/7d, 5/7e, 5/8, 5/8b, 5/12a, 5/12b, 5/12c, 5/13a, 5/13b, 5/13c, 5/21a, 5/24, 5/30,
Sheet 6,6/2, 6/2b, 6/3a, 6/4, 6/4a, 6/4b, 6/9 , 6/10,
Sheet 11,11/2, 11/3, 11/4, 11/6, 11/19 , 11/20, 11/22, 11/22a, 11/23, 11/24, 11/24a, 11/25, 11/25a, 11/29,
Sheet 12,12/4, 12/5b, 12/5d, 12/11, 12/12, 12/17, 12/18, 12/23, 12/25, 12/25b, 12/34 , 12/34a, 12/34b , 12/34c,
Sheet 13,13/2d, 13/4e, 13/4f, 13/4g, 13/11, 13/14, 13/15,
Sheet 20,20/2, 20/3, 20/4,
Sheet 21,21/1, 21/1a, 21/2,
Sheet 25,25/1,
Sheet 26,26/1, 26/2,

Sheet 11,11/16, 11/17g,
Sheet 12,11/17g,
Sheet 27,11/16, 11/17, 11/17a, 11/17b, 11/17c, 11/17d, 11/17e, 11/17f, 11/17g, 27/1,
Sheet 28,11/17d, 11/17e, 11/17f, 11/17h, 11/17i, 11/17j,
Sheet 29,11/17h,

 Applicant’s Submission of Tree Protection Plan for Royal Horticultural Society,TR010030/9.140,0,
Book of Reference – Regulation 5(2)(d),TR010030/APP/4.3,5,
Crown Land Plans – Regulation 5(2)(n),TR010030/APP/2.6,4,
Engineering Drawings and Sections – Regulation 5(2)(o), 5(4) and 6(2),TR010030/APP/2.9,2,
Environmental Statement – Main Report – Regulation 5(2)(a),TR010030/APP/6.3,1,
Environmental Statement – Figures – Regulation 5(2)(a),TR010030/APP/6.4,2,
Environmental Statement – Appendices– Regulation 5(2)(a),TR010030/APP/6.5,2,
Habitats Regulations Assessment – Regulation 5(2)(g),TR010030/APP/5.3,2,
Land Plans – Regulation 5(2)(i),TR010030/APP/2.2,5,
Location Plan – Regulation 5(2)(o),TR010030/APP/2.1,3,
Outline Construction Environmental Management Plan – Regulation 5(2)(q),TR010030/APP/7.2,5,
 Proposed carriageway surface course options – Regulation 5(2)(o) Sheet 1 of 1,TR010030/APP/9.22,0,
Register of Environmental Actions and Commitments – Regulation 5(2)(q),TR010030/APP/7.3,5,
 Report of Proposed Scheme Changes 7 to 9,Figure 5.1 in TR010030/APP/10.12 (Vol 10),0,
RHS Tree Protection Plan,TR010030/EXAM/9.140,0,
Scheme Layout Plans – Regulation 5(2)(o),TR010030/APP/2.8,5,
Special Category Land Plans – Regulation 5(2)(i)(iv),TR010030/APP/2.5,4,
Speed Limits and Traffic Regulations Plans – Regulation 5(2)(o),TR010030/APP/2.7,3,
Statutory Nuisance Statement – Regulation 5(2)(f),TR010030/APP/5.2,0,
Streets, Rights of Way and Access Plans – Regulation 5(2)(k),TR010030/APP/2.4,3,
Temporary Works Plans – Regulation 5(2)(o),TR010030/APP/2.10,3,
Water Framework Directive Assessment Report – Regulation 5(2)(q),TR010030/APP/5.4,1,
Works Plans – Regulation 5(2)(j),TR010030/APP/2.3,4,