1,52° 14 39.654N,02° 11 21.656E,
2,52° 15 04.022N,02° 13 12.152E,
3,52° 02 57.281N,02° 19 46.696E,
4,52° 02 52.969N,02° 08 40.302E,
5,52° 03 53.133N,02° 07 14.881E,
6,52° 08 38.942N,02° 07 41.310E,
7,52° 13 29.526N,02° 08 08.272E,
8,52° 17 42.613N,02° 08 31.830E,
9,52° 18 44.262N,02° 06 49.319E,
10,52° 18 39.650N,01° 57 24.848E,
11,52° 17 25.858N,01° 54 09.969E,
12,52° 17 24.663N,01° 52 03.374E,
13,52° 15 14.373N,01° 45 57.606E,
14,52° 15 04.711N,01° 49 39.684E,
15,52° 15 01.611N,01° 49 53.749E,
16,52° 14 55.768N,01° 50 02.126E,
17,52° 11 16.087N,01° 53 12.972E,
18,52° 11 06.257N,01° 53 33.515E,
19,52° 10 49.579N,01° 55 24.050E,
20,52° 10 56.146N,01° 59 23.916E,
21,52° 11 39.569N,02° 01 58.824E,
22,52° 11 52.131N,02° 03 14.901E,
23,52° 11 21.410N,02° 03 41.116E,
24,52° 11 06.526N,02° 02 15.690E,
25,52° 09 40.842N,01° 57 07.198E,
26,52° 09 39.286N,01° 55 07.950E,
27,52° 10 54.492N,01° 52 29.501E,
28,52° 14 31.482N,01° 49 20.497E,
29,52° 14 40.142N,01° 45 33.942E,
30,52° 14 29.510N,01° 45 06.050E,
31,52° 10 51.365N,01° 42 32.460E,
32,52° 09 56.713N,01° 39 52.443E,
33,52° 09 53.117N,01° 38 40.253E,
34,52° 10 06.702N,01° 37 38.597E,
35,52° 10 44.466N,01° 37 04.551E,
36,52° 11 01.504N,01° 37 17.750E,
37,52° 11 02.378N,01° 37 15.833E,
38,52° 11 11.451N,01° 37 20.545E,
39,52° 11 22.030N,01° 37 22.233E,
40,52° 11 30.678N,01° 37 21.417E,
41,52° 11 31.210N,01° 37 24.534E,
42,52° 11 33.421N,01° 37 24.505E,
43,52° 11 53.663N,01° 37 50.246E,
44,52° 12 26.106N,01° 40 17.584E,
45,52° 13 37.194N,01° 41 04.014E,
46,52° 15 54.943N,01° 45 03.442E,
47,52° 18 25.193N,01° 52 05.276E,
48,52° 20 19.496N,01° 56 37.327E,
49,52° 20 25.400N,02° 08 48.429E,
50,52° 20 02.196N,02° 08 47.461E,
51,52° 20 02.235N,02° 10 29.142E,
52,52° 19 10.459N,02° 10 57.491E,
53,52° 19 10.435N,02° 09 35.567E,
54,52° 16 21.190N,02° 09 19.730E,

Work Nos. 7 and 8 (combined),7,040 m 2,
Work No. 11,7,040 m 2,
Work No. 16,7,040 m 2,
Work No. 18,3,000 m 2,
Work No. 22,3,000 m 2,
Work No. 27,16,500 m 2,
Work No. 31,17,100 m 2,
Work No. 42,23,350 m 2,


District of East Suffolk,Public right of way footpath E-106/020/0 between reference points 1a and 1b on sheet 1 of 12 of the works plans.,
District of East Suffolk,Private track / public right of way footpath E-106/025/0 between reference points 2a and 2b on sheet 2 of 12 of the works plans.,
District of East Suffolk,SIZEWELL GAP between reference points 3a and 3b on sheet 3 of 12 of the works plans.,
District of East Suffolk,SIZEWELL GAP between reference points 3c and 3d on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way bridleway E-363/026/0 between reference points 3e and 3f and between points 3g and 3h on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-363/029/0 between reference points 3i and 3j on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-363/024/0 between reference points 3k and 3l on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-363/023/0 between reference points 3m and 3n on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-363/022/0 between reference points 3o and 3p on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way bridleway E-363/027/0 between reference points 3q and 3r on sheet 3 of 12 of the works plans.,
District of East Suffolk,Public right of way bridleway E-363/015/0 between reference points 4a and 4b on sheet 4 of 12 of the works plans.,
District of East Suffolk,Public rights of way footpath E-363/014/0 between reference points 4a and 4c on sheet 4 of 12 of the works plans.,
District of East Suffolk,Public rights of way footpath E-363/014/A between reference points 4d and 4e on sheet 4 of 12 of the works plans.,
District of East Suffolk,THORPE ROAD between reference points 5a and 5b on sheet 5 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-106/065/0 between reference points 5c and 5d on sheet 5 of 12 of the works plans.,
District of East Suffolk,ALDEBURGH ROAD between reference points 5e and 5f on sheet 5 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-260/030/0 between reference points 5g and 5h on sheet 5 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-260/007/0 between reference points 5i and 5j on sheet 5 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-260/009/0 between reference points 5k and 5l on sheet 5 of 12 of the works plans.,
District of East Suffolk,SLOE LANE between reference points 6a and 6b on sheet 6 of 12 of the works plans.,
District of East Suffolk,B1069 (SNAPE ROAD) between reference points 6c and 6d on sheet 6 of 12 on the works plans.,
District of East Suffolk,Public right of way bridleway E-354/020/0 between reference points 6e and 6f on sheet 6 of 12 of the works plans.,
District of East Suffolk,Public right of way bridleway E-354/036/0 between reference points 6g and 6h on sheet 6 of 12 of the works plans.,
District of East Suffolk,Public right of way bridleway E-354/001/0 between reference points 6i and 6j on sheet 6 of 12 of the works plans; and between reference points 8g and 8h on sheet 8 of 12 of the works plans.,
District of East Suffolk,Public right of way footpath E-354/003/0 between reference points 6k and 6l on sheet 6 of 12 of the works plans.,
District of East Suffolk,GROVE ROAD between reference points 7a and 7b on sheet 7 of 12 on the works plans.,
District of East Suffolk,CHURCH ROAD between reference points 7f and 7j on sheet 7 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-354/007/0 between reference points 7c and 7d on sheet 7 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-354/006/0 between reference points 7e and 8a on sheet 7 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-260/017/0 between reference points 7f and 7g on sheet 7 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-260/017/0 between reference points 7h and 7i on sheet 7 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-354/008/0 between reference points 8a and 8b on sheet 8 of 12 on the works plans.,
District of East Suffolk,GROVE ROAD between reference points 8c and 8d on sheet 8 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-354/007/A between reference points 8e and 8f on sheet 8 of 12 on the works plans.,
District of East Suffolk,B1121 (SAXMUNDHAM ROAD) between reference points 9a and 9b on sheet 9 of 12 on the works plans.,
District of East Suffolk,B1121 (SAXMUNDHAM ROAD) between reference points 9b and 9c on sheet 9 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-260/016/0 between reference points 9d and 9e on sheet 9 of 12 on the works plans.,
District of East Suffolk,A1094 (FARNHAM ROAD) between reference points 10a and 10d on sheet 10 of 12 on the works plans.,
District of East Suffolk,A1094 (ALDEBURGH ROAD) between reference points 10b and 10d on sheet 10 of 12 on the works plans.,
District of East Suffolk,B1121 (ALDEBURGH ROAD) between reference points 10c and 10d on sheet 10 of 12 on the works plans.,
District of East Suffolk,B1069 (SNAPE ROAD) between reference points 10e and 10f on sheet 10 of 12 on the works plans.,
District of East Suffolk,A12 (MAIN ROAD) between reference points 11a and 11b on sheet 11 of 12 on the works plans.,
District of East Suffolk,A1094 (FRIDAY STREET) between reference points 11c and 11d on sheet 11 of 12 on the works plans.,
District of East Suffolk,A12 (MAIN ROAD) between reference points 12a and 12b on sheet 12 of 12 on the works plans.,
District of East Suffolk,Public right of way footpath E-387/009/0 between reference points 12c and 12d on sheet 12 of 12 on the works plans.,


District of East Suffolk,Byway open to all traffic reference 1 (E-106/020/0),Approximately 120m of the existing byway open to all traffic reference 1 (E-106/020/0) between the points marked L-1 and L-2 on sheet 1 of 12 of the temporary stopping up of public rights of way plan shown with a dashed pink line.,Approximately 646m of proposed byway open to all traffic reference TEMP1 between the points marked L-1 and L-2 on sheet 1 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Byway open to all traffic reference 2 (E-106/025/0),Approximately 66m of the existing byway open to all traffic reference 2 (E-106/025/0) between the points marked CS1-1 and CS1-2 on sheet 2 of 12 of the temporary stopping up of public rights of way plan shown with a dashed pink line.,Approximately 236m of proposed byway open to all traffic reference TEMP2a, or approximately 360m of proposed byway open to all traffic reference TEMP2b between the points CS1-1 and CS1-2 on sheet 2 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 3 (E-363/026/0),Approximately 73m of the existing bridleway reference 3 (E-363/026/0) between the points marked CS1-3 and CS1-4 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed green line.,Approximately 339m of proposed bridleway reference TEMP3 between the points marked CS1-3 and CS1-4 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 4 (E-363/026/0),Approximately 345m of the existing bridleway reference 4 (E-363/026/0) between the points marked CS2-1 and CS2-2 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed blue line.,Approximately 578m of proposed bridleway reference TEMP4a between the points marked CS2-1 and CS2-2 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.  Approximately 780m of proposed bridleway reference TEMP4b between the points marked CS2-1 to CS2-7 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority. ,
District of East Suffolk,Footpath reference 5 (E-363/024/0),Approximately 739m of the existing footpath reference 5 (E-363/024/0) between the points marked CS2-3 and CS2-4 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 806m of proposed footpath reference TEMP5 between the points marked CS2-3 and CS2-4 or approximately 1146m of proposed footpath reference TEMP6b, TEMP6a, TEMP8 and TEMP7 between the points marked CS2-3 and CS2-4 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 6 (E-363/029/0),Approximately 88m of the existing footpath reference 6 (E-363/029/0) between the points marked CS2-5 and CS2-6 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 531m of proposed footpath reference TEMP4b and TEMP6b between the points marked CS2-5 and CS2-6 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 7 (E-363/023/0),Approximately 298m of the existing footpath reference 7 (E-363/023/0) between the points marked CS2-7 and CS2-8 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 497m of proposed footpath reference TEMP7 between the points marked CS2-7 and CS2-8 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 8 (E-363/022/0),Approximately 684m of the existing footpath reference 8 (E-363/022/0) between the points marked CS2-9 and CS2-12 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 537m of proposed footpath reference TEMP8 and TEMP7 between the points marked CS2-9 and CS2-12 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 9 (E-363/027/0),Approximately 31m of the existing bridleway reference 9 (E-363/027/0) between the points marked CS2-10 and CS2-11 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a dashed green line.,Approximately 98m of proposed footpath reference TEMP9 between the points marked CS2-10 and CS2-11 on sheet 3 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 10 (E-363/015/0),Approximately 199m of the existing bridleway reference 10 (E-363/015/0) between the points marked CS2-13 and CS2-14 on sheet 4 of 12 of the temporary stopping up of public rights of way plan shown with a dashed green line.,Approximately 216m of proposed bridleway reference TEMP10a or approximately 359m of proposed bridleway reference TEMP10b between the points marked CS2-13 and CS2-14 on sheet 4 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 11 (E-363/014/0),Approximately 66m of the existing footpath reference 11 (E-363/014/0) between the points marked CS2-15 and CS2-16 on sheet 4 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 288m of proposed footpath reference TEMP11 between the points marked CS2-15 and CS2-16 on sheet 4 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 12 (E-363/014/A),Approximately 106m of the existing footpath reference 12 (E-363/014/A) between the points marked CS2-17 and CS2-18 on sheet 4 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed yellow line.,Approximately 347m of proposed footpath reference TEMP12a or approximately 409m of proposed footpath reference TEMP12b between the points marked CS2-17 and CS2-18 on sheet 4 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 13 (E-106/065/0),Approximately 70m of the existing footpath reference 13 (E-106/065/0) between the points marked CS2-19 and CS2-20 on sheet 5 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed yellow line.,Approximately 270m of proposed footpath reference TEMP13a or approximately 266m of proposed footpath reference TEMP13b between the points marked CS2-19 and CS2-20 on sheet 5 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 14 (E-260/030/0),Approximately 61m of the existing footpath reference 14 (E-260/030/0) between the points marked CS3-1 and CS3-2 on sheet 5 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed yellow line.,Approximately 321m of proposed footpath reference TEMP14 between the points marked CS3-1 and CS3-2 on sheet 5 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 15 (E-260/007/0),Approximately 239m of the existing footpath reference 15 (E-260/007/0) between the points marked CS3-3 and CS3-4 on sheet 5 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed yellow line.,Approximately 654m of proposed footpath reference TEMP15 between the points marked CS3-3 and CS3-4 on sheet 5 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 16 (E-260/009/0),Approximately 156m of the existing footpath reference 16 (E-260/009/0) between the points marked CS3-5 and CS3-6 on sheet 5 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed yellow line.,Approximately 577m of proposed footpath reference TEMP16a or approximately 418m of proposed footpath reference TEMP16b between the points marked CS3-5 and CS3-6 on sheet 5 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 17 (E-354/020/0),Approximately 220m of the existing bridleway reference 17 (E-354/020/0) between the points marked CS4-1 and CS4-2 on sheet 6 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed green line.,Approximately 637m of proposed bridleway reference TEMP17/18 between the points marked CS4-5 and CS4-2 on sheet 6 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 18 (E-354/036/0),Approximately 225m of the existing bridleway reference 18 (E-354/036/0) between the points marked CS4-3 and CS4-4 on sheet 6 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed green line.,Approximately 637m of proposed bridleway reference TEMP17/18 between the points marked CS4-5 and CS4-4 on sheet 6 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 19 (E-354/001/0),Approximately 270m of the existing bridleway reference 19 (E-354/001/0) between the points marked CS4-6 and CS4-7 on sheet 6 of 12 of the temporary stopping up of public rights of way plan. shown with a dashed green line.,Approximately 538m of proposed bridleway reference TEMP19a between the points marked CS4-6 and CS4-3 or approximately 337m of proposed bridleway reference TEMP19b between the points marked CS4-7 and CS4-10 on sheet 6 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 20 (E-354/003/0),Approximately 96m of the existing footpath reference 20 (E-354/003/0) between the points marked CS4-8 and CS4-9 on sheet 6 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 363m of proposed footpath reference TEMP20a or approximately 347m of proposed footpath reference TEMP20b between the points marked CS4-8 and CS4-9 on sheet 6 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 21 (E-354/007/0),Approximately 316m of the existing footpath reference 21 (E-354/007/0) between the points marked S-1 and S-2 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 395m of proposed footpath reference TEMP21 between the points marked S-1 and S-2 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 22 (E-354/006/0),Approximately 283m of the existing footpath reference 22 (E-354/006/0) between the points marked S-4 and S-22 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 337m of proposed footpath reference TEMP22 between the points marked S-22 and S-14 and approximately 559m of proposed footpath reference TEMP22 between the points marked S-15 and S-5 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 23 (E-354/006/0),Approximately 206m of the existing footpath reference 23 (E-354/006/0) between the points marked S-4 and S-5 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 421m of proposed footpath reference TEMP23a or approximately 691m of proposed footpath reference TEMP23b between points marked S-4 and S-5 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 24 (E-354/006/0),Approximately 208m of the existing footpath reference 24 (E-354/006/0) between the points marked S-22 and S-24 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 324m of proposed footpath reference TEMP22 between the points marked S-22 and S-14 and approximately 157m of proposed footpath reference TEMP24 between points marked S-24 and S-25 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 25 (E-354/006/0),Approximately 294m of the existing footpath reference 25 (E-354/006/0) between the points marked S-24 and S-3 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 442m of proposed footpath reference TEMP25 and TEMP21 between the points S-24 and S-3 on sheet 7 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 26 (E-354/007/A),Approximately 465m of the existing footpath reference 26 (E-354/007/A) between the points marked S-10 and S-11 on sheet 8 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 571m of proposed footpath reference TEMP26 between the points marked S-10 and S-11 on sheet 8 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Bridleway reference 27 (E-354/001/0),Approximately 207m of the existing bridleway reference 27 (E-354/001/0) between the points marked S-12 and S-13 on sheet 8 of 12 of the temporary stopping up of public rights of way plan shown with a dashed green line.,Approximately 491m of proposed bridleway reference TEMP27 between the points marked S-12 and S-13 on sheet 8 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 28 (E-260/017/0),Approximately 169m of the existing footpath reference 28 (E-260/017/0) between the points marked S-20 and S-21 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 524m of proposed footpath reference TEMP28a between the points S-20 and S-21 or approximately 413m of proposed footpath reference TEMP28b between points S-20 and S-21 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 29 (E-260/017/0),Approximately 769m of the existing footpath reference 29 (E-260/017/0) between the points marked S-14 and S-15 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 1136m of proposed footpath reference TEMP22, TEMP28b and TEMP22/34 between the points marked S-14 and S-15 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 30 (E-354/008/0),Approximately 429m of the existing footpath reference 30 (E-354/008/0) between the points marked S-6 and S-7 on sheet 8 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 393m of proposed footpath reference TEMP30 between the points marked S-6 and S-7 on sheet 8 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 31 (E-260/016/0),Approximately 53m of the existing footpath reference 31 (E-260/016/0) between the points marked S-16 and S-17 on sheet 9 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 265m of proposed footpath reference TEMP31a or approximately 273m of proposed footpath reference TEMP31b between the points marked S-16 and S-17 on sheet 9 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 32 (E-260/017/0),Approximately 548m of the existing footpath reference 32 (E-260/017/0) between the points marked S-8 and S-14 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 937m of proposed footpath reference TEMP35 and TEMP22 between the points marked S-8 and S-14 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 33 (E-387/009/0),Approximately 45m of the existing footpath reference 33 (E-387/009/0) between the points marked HW-1 and HW-2 on sheet 12 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 56m of proposed footpath reference TEMP33 between the points marked HW-1 and HW-2 on sheet 12 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,
District of East Suffolk,Footpath reference 34  (E/260/017/0) ,Approximately 294m of the existing footpath reference 34 (E-260/017/0) between the points marked S-15 and S-21 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a dashed yellow line.,Temporary diversion of approximately 295m of proposed footpath reference TEMP22/34 between the points marked S-15 and S-21 on sheet 7 of 12 of the temporary stopping up of public rights of way plan shown with a black and white dashed line or as otherwise agreed with the relevant highway authority.,


District of East Suffolk,Footpath reference 35 (E-354/007/0),Approximately 87m of the existing footpath reference 35 (E-354/007/0) between the points marked S-1 and S-3; and approximately 38m of the existing footpath reference 35 (E-354/007/0) between the points marked S-4 and S-5 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 89m of proposed footpath reference PERM35a between the points marked S-1 and S-3 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.  Approximately 24m of proposed footpath reference PERM35b between the points marked S-4 and S-5 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority. ,
District of East Suffolk,Footpath reference 36 (E-354/006/0),Approximately 693m of the existing footpath reference 36 (E-354/006/0) between points marked S-6 and S-8 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 584m of proposed footpath reference PERM36a between the points marked S-1 and S-13 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.  Approximately 761m of proposed footpath reference PERM36b between the points marked S-13 and S-8 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.  Approximately 569m of proposed footpath reference PERM36c between the points marked S-8 and S-2 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.  Approximately 157m of proposed footpath reference PERM36d between the points marked S-6 and S-7 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.  Approximately 188m of proposed footpath reference PERM36e between the points marked S-9 and S-10 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise agreed with the relevant highway authority. ,
District of East Suffolk,Footpath reference 37 (E-260/017/0),Approximately 194m of the existing footpath reference 37 (E-260/017/0) between points marked S-11 and S-2 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a dashed yellow line.,Approximately 198m of proposed footpath reference PERM37 between the points marked S-11 and S-12 on sheet 7 of 12 of the permanent stopping up of public rights of way plan shown with a black and white dashed line or as otherwise approved by the relevant highway authority.,


District of East Suffolk,Private track,Approximately 66m of private track as is within Work No.9 as shown between reference points 2a and 2b on sheet 2 of 12 of the works plans.,
District of East Suffolk,SIZEWELL GAP,Approximately 480m of Sizewell Gap as is within Work No.10 as shown between reference points 3a and 3b on sheet 3 of 12 of the works plans.,
District of East Suffolk,SIZEWELL GAP,Approximately 307m of Sizewell Gap as is within Work No.15 as shown between reference points 3c and 3d on sheet 3 of 12 of the works plans.,
District of East Suffolk,THORPE ROAD,Approximately 164m of Thorpe Road as is within Work No.17 as shown between reference points 5a and 5b on sheet 5 of 12 of the works plans.,
District of East Suffolk,ALDEBURGH ROAD,Approximately 93m of Aldeburgh Road as is within Work No.19 as shown between reference points 5e and 5f on sheet 5 of 12 of the works plans.,
District of East Suffolk,SLOE LANE,Approximately 73m of Sloe Lane as is within Work No.23 as shown between reference points 6a and 6b on sheet 6 of 12 of the works plans.,
District of East Suffolk,B1069 (SNAPE ROAD),Approximately 88m of the B1069 (Snape Road) as is within Work No.26 as shown between reference points 6c and 6d on sheet 6 of 12 of the works plans.,
District of East Suffolk,GROVE ROAD,Approximately 88m of Grove Road as is within Work No.26 as shown between reference points 7a and 7b on sheet 7 of 12 of the works plans.,
District of East Suffolk,CHURCH ROAD,Approximately 105m of Church Road as is within Work No.33 as shown between reference points 7f and 7j on sheet 7 of 12 of the works plans.,
District of East Suffolk,GROVE ROAD,Approximately 573m of Grove Road as is within Work No.43 as shown between reference points 8c and 8d on sheet 8 of 12 of the works plans.,
District of East Suffolk,B1121 (SAXMUNDHAM ROAD),Approximately 269m of the B1121 (Saxmundham Road) as is within Work No.43 as shown between reference points 9a and 9b on sheet 9 of 12 of the works plans.,
District of East Suffolk,B1121 (SAXMUNDHAM ROAD),Approximately 621m of the B1121 (Saxmundham Road) as is within Work No.34 as shown between reference points 9b and 9c on sheet 9 of 12 of the works plans.,
District of East Suffolk,A1094 (FARNHAM ROAD),Approximately 226m of the A1094 (Farnham Road) as is within Work No.35 as shown between reference points 10a and 10d on sheet 10 of 12 of the works plans.,
District of East Suffolk,A1094 (ALDEBURGH ROAD),Approximately 525m of the A1094 (Aldeburgh Road) as is within Work No.35 as shown between reference points 10b and 10d on sheet 10 of 12 of the works plans.,
District of East Suffolk,B1121 (ALDEBURGH ROAD),Approximately 84m of the B1121 (Aldeburgh Road) as is within Work No.35 as shown between reference points 10c and 10d on sheet 10 of 12 of the works plans.,
District of East Suffolk,B1069 (SNAPE ROAD),Approximately 197m of the B1069 (Snape Road) as is within Work No.35 as shown between reference points 10e and 10f on sheet 10 of 12 of the works plans.,
District of East Suffolk,A12 (MAIN ROAD),Approximately 680m of the A12 (Main Road) as is within Work No.36 as shown between reference points 11a and 11b on sheet 11 of 12 of the works plans.,
District of East Suffolk,A1094 (FRIDAY STREET),Approximately 469m of the A1094 (Friday Street) as is within Work No.36 as shown between reference points 11c and 11d on sheet 11 of 12 of the works plans.,
District of East Suffolk,A12 (MAIN ROAD),Approximately 84m of the A12 (Main Road) as is within Work No.37 as shown between reference points 12a and 12b on sheet 12 of 12 of the works plans.,


District of East Suffolk,Vehicular access to the south from Sizewell Gap and marked at point AC1 on sheet 3 of 12 of the access to works plan.,
District of East Suffolk,Vehicular access to the south from Sizewell Gap and marked at point AC2 on sheet 3 of 12 of the access to works plan.,
District of East Suffolk,Vehicular access to the east and west from Aldeburgh Road and marked at point AC3 on sheet 5 of 12 of the access to works plan.,
District of East Suffolk,Vehicular access to the west from Snape Road and marked at point AC4 on sheet 6 of 12 of the access to works plan.,
District of East Suffolk,Vehicular access to the northeast from Saxmundham Road and marked at point AC5 on sheet 9 of 12 of the access to works plan.,


1, 2,   the right to install the cables by the use of directional drilling or other trenchless techniques only;      the right to retain and use the cables and for the purposes of the transmission of electricity and telecommunications;      the right to benefit from continuous vertical and lateral support for the cables and jointing installations;      a restrictive covenant over the land for the benefit of the remainder of the Order land—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);      to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; and      to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables.       ,
4, 5, 6,   all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment;      the right to carry out terrestrial work activities;      the right to install the cables by the use of directional drilling or other trenchless techniques only;      the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);      the right to remove and discharge water from the land;      the right to retain and use the cables, for the purposes of the transmission of electricity and telecommunications;      the right to benefit from continuous vertical and lateral support for the cables, transition bays and jointing installations;      a restrictive covenant over the land for the benefit of the remainder of the Order land—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);      to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; and      to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables, transition bays and jointing installations.       ,
7,   all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment;      the right to carry out terrestrial work activities;      the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques;      the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping;      temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment);      cable marker posts to identify the location of the cables as required for routine integrity testing;      pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);      hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram;      temporary paths and bridleways for public use;      temporary access roads;      temporary haul roads;      temporary noise alleviation measures;      temporary barriers for the protection of fauna;      supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers);      temporary fencing, gates, walls, barriers or other means of enclosure.         the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities;      the right to remove and discharge water from the land;      the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works;      the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;      the right to erect temporary signage and provide measures for the benefit of public and personnel safety;      the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway;      the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers;      the right to remove, store and stockpile materials (including excavated material) within the land;      the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities;      the right to retain and use the cables, transition bays and jointing installations for the purposes of the transmission of electricity and telecommunications;      the right to benefit from continuous vertical and lateral support for the cables, transition bays and jointing installations;      a restrictive covenant over the land for the benefit of the remainder of the Order land—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);      to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land;      to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and      to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables, transition bays and jointing installations.       ,
11, 12, 13, 14, 15, 16, 25, 27, 28 , 30 , 39, 40, 41, 42, 47, 49, 50, 54, 55, 56, 58, 59, 60, 61, 63, 64, 65, 66, 67, 69, 70, 74, 80, 82, 83, 85, 92, 93,   all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment;      the right to carry out terrestrial work activities;      the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques;      the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping;      temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment);      cable marker posts to identify the location of the cables as required for routine integrity testing;      pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);      hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram;      temporary paths and bridleways for public use;      temporary access roads;      temporary haul roads;      temporary noise alleviation measures;      temporary barriers for the protection of fauna;      supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers);      temporary fencing, gates, walls, barriers or other means of enclosure.         the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities;      the right to remove and discharge water from the land;      the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works;      the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;      the right to erect temporary signage and provide measures for the benefit of public and personnel safety;      the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway;      the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers;      the right to remove, store and stockpile materials (including excavated material) within the land;      the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities;      the right to retain and use the cables and jointing installations for the purposes of the transmission of electricity and telecommunications;      the right to benefit from continuous vertical and lateral support for the cables and jointing installations;      a restrictive covenant over the land for the benefit of the remainder of the Order land—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);      to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land;      to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and      to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables and jointing installations.       ,
67, 69, 70, 80, 82, 83, 85, 86, 88, 93,   the right to pass and repass with or without plant, vehicles, machinery, materials, drilling fluids, apparatus and equipment to access adjoining land and highway;      the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway;      the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purposes of enabling rights to pass and repass;      the right to remove and discharge water from the land;      the right to erect temporary signage and provide measures for the benefit of public and personnel safety;      the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers.    ,
87,   the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     temporary barriers for the protection of fauna;      temporary paths and bridleways for public use;      temporary access roads;      temporary fencing, gates, walls, barriers or other means of enclosure.         the right to pass and repass with or without plant, vehicles, machinery, materials, apparatus and equipment to access adjoining land and highway;      the right to place and use plant, vehicles, machinery, materials, apparatus, equipment and temporary structures on and within the land;      the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges;      the right to remove and discharge water from the land;      the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works;      the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant trees, shrubs and landscaping;      the right to erect temporary signage and provide measures for the benefit of public and personnel safety;      the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities in respect of the authorised project is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers;      the right to remove, store and stockpile materials (including excavated material) within the land;      a restrictive covenant over the land for the benefit of the remainder of the Order land—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); and      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project).       ,
115,all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment, and to—     lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus (including but not limited to the use of scaffolding) and any other works as necessary;      public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping;      temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment);      pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);      temporary noise alleviation measures;      temporary barriers for the protection of fauna;      supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers);      hard standing and other material (including but not limited to matting, aggregate, trackway, stone, tarmacadam, terram);      temporary access roads;      temporary haul roads;      temporary paths and bridleways for public use;      fencing, gates, walls, barriers or other means of enclosure.         retain and use electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and all ancillary equipment and apparatus for the purposes of the transmission of electricity and telecommunications and for any other purpose ancillary to the authorised project;      pass and repass with or without plant, vehicles, machinery, materials, drilling fluids, apparatus and equipment to access adjoining land and highway;      place and use plant, vehicles, machinery, materials, drilling fluids, apparatus, equipment and temporary structures on and within the land;      fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass;      fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges and remove roots of trees, shrubs and hedges which may obstruct or interfere with electricity poles, electricity pylons, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus (including but not limited to scaffolding);      carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples;      remove and discharge water from the land;      install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works;      install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;      benefit from continuous vertical and lateral support for the electricity poles, electricity pylons, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus (including but not limited to scaffolding);      erect temporary signage and provide measures for the benefit of public and personnel safety;      retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway;      remove fences, hedges, gates or other barriers during any period during which terrestrial work activities in respect of the authorised project is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers;      remove, store and stockpile materials (including excavated material) within the land;      remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities;      a restrictive covenant over the land for the benefit of the remainder of the Order land to—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);      to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land;      to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and      to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables, transition bays and jointing installations.       ,
100, 101, 102, 103, 104, 104A, 104B, 104C,   all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping;      temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment);      pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);         the right to remove, store and stockpile materials (including excavated material) within the land;      the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges;      the right to benefit from continuous vertical and lateral support for the pipes, cables, conduits, service media and apparatus installed in, under, or over the land.    ,
43, 46, 57, 72, 77, 95, 96, 97,   all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment;      the right to carry out terrestrial work activities;      the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques;      the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping;      pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);      hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram;      temporary noise alleviation measures;      temporary barriers for the protection of fauna;      supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers);      temporary fencing, gates, walls, barriers or other means of enclosure.         the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities;      the right to remove and discharge water from the land;      the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works;      the right to erect temporary signage and provide measures for the benefit of public and personnel safety;      the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities;      the right to retain and use the cables, and jointing installations, for the purposes of the transmission of electricity and telecommunications;      the right to benefit from continuous vertical and lateral support for the cables and jointing installations.    ,
22, 23, 24,   all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment;      the right to carry out terrestrial work activities;      the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques;      the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove—     public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping;      cable marker posts to identify the location of the cables as required for routine integrity testing;      pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers);      temporary paths and bridleways for public use;      temporary access roads;      temporary haul roads;      temporary noise alleviation measures;      temporary barriers for the protection of fauna;      supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers);      temporary fencing, gates, walls, barriers or other means of enclosure.         the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities;      the right to remove and discharge water from the land;      the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works;      the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;      the right to erect temporary signage and provide measures for the benefit of public and personnel safety;      the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway;      the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers;      the right to remove, store and stockpile materials (including excavated material) within the land;      the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities;      the right to retain and use the cables for the purposes of the transmission of electricity and telecommunications;      the right to benefit from continuous vertical and lateral support for the cables;      a restrictive covenant over the land for the benefit of the remainder of the Order land—     to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto);      to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project);      to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land;      to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and      to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables.       ,


District of East Suffolk,1, 2, 4 to 9, 11 to 131, 133 to 136, 144, 146 to 160, 163 to 182,Construction and carrying out of the authorised project,Work Nos. 6 to 43,
District of East Suffolk,7, 11 to 13, 15, 16, 25, 27, 28, 30, 31, 39 to 43, 47, 49, 50, 54 to 56, 65 to 67, 69, 70, 74, 80, 82, 83, 85, 92, 93, 99, 104, 104A, 104B, 104C, 107 to 116, 119 to 121, 127 to 131, 133 to 135, 144, 146, 147, 152, 153 and 182,Worksites for construction and the carrying out of the authorised project,Work Nos. 8, 9, 11, 13, 15 to 19, 22, 23, 26, 30 to 35 and 37 to 43,
District of East Suffolk,8, 9, 16, 29, 31, 34 to 38, 42 to 45, 47, 48, 51 to 54, 56, 58 to 60, 62, 69 to 71, 73, 74, 80, 89 to 93, 95, 96, 108 and 127,Access for carrying out the authorised project,Work Nos. 7, 11, 15, 17, 18, 19, 20, 23, 26 and 34,
District of East Suffolk,7, 8, 16, 39, 47, 65, 66, 84, 108 to 113,Construction consolidation sites,Work Nos. 7, 8, 11, 16, 18, 22, 27, 31 and 42,
District of East Suffolk,7, 8, 11 to 16, 22 to 25, 27, 28, 30, 31, 39 to 43, 46, 47, 49, 50, 54 to 61, 63 to 67, 69, 70, 72, 74, 75, 77, 80, 82, 83, 85, 92, 93, 95, 96, 97 107 to 116, 117, 123, 127 to 131, 133, 135, 136, 144, 146, 147, 152, 153, 177 to 180 and 182,Laying of temporary vehicular access tracks, haul roads, hard standings and improvements to tracks,Work Nos. 7, 8, 9, 11, 12, 13, 14, 15 to 23, 26, 30, 31 32, 34, 35 and 37 to 43,
District of East Suffolk,7, 8, 11 to 16, 22 to 27, 28, 30, 39 to 43, 47, 49, 50, 58 to 61, 63 to 67, 69, 78, 79, 80 to 84, 85, 92, 98, 99, 104, 104C, 105 to 116, 127 to 131, 133, 135, 144, 146, 147 and 182,Temporary diversion of public rights of way,Work Nos. 7, 8, 9, 11, 12, 13, 16 to 23, 25, 26, 27, 33 and 37 to 43,
District of East Suffolk,26,Creation of habitat for flora and fauna and other ecological measures,Work No. 14,
District of East Suffolk,50, 54 and 55,Temporary bridge arrangements over the Hundred River,Work No. 19,
District of East Suffolk,17 to 21, 32, 33, 76, 117, 122 to 126, 148 to 160, 163 to 180,Clear vegetation to increase the visibility swathes,Work Nos. 10, 15, 23 and 34 to 37,
District of East Suffolk,8, 8A,Temporary water supply,Work No. 7,


District of East Suffolk,The important hedgerow marked 3 on sheet 1 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 10 on sheet 3 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 11 on sheet 3 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 12 on sheet 3 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 15 on sheet 4 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 17 on sheet 4 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 19 on sheet 5 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 21 on sheet 5 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 26 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 27 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 28 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 29 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 30 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 35 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 36 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 37 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 38 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 39 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 40 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 41 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 42 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 43 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 44 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 45 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 46 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 47 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 48 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 49 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 50 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 51 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 52 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 54 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 56 on sheet 8 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 57 on sheet 8 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 58 on sheet 8 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 60 on sheet 7 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 61 on sheet 9 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 62 on sheet 9 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 63 on sheet 9 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 64 on sheet 9 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 65 on sheet 9 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 66 on sheet 9 of 12 of the important hedgerows and tree preservation order plan.,


District of East Suffolk,The important hedgerow marked 1 on sheet 1 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 2 on sheet 1 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 4 on sheet 2 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 6 on sheet 2 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 7 on sheet 2 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 8 on sheet 3 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 9 on sheet 3 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 14 on sheet 4 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 16 on sheet 4 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 18 on sheet 4 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 20 on sheet 5 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 22 on sheet 5 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 23 on sheet 5 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 24 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 31 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,
District of East Suffolk,The important hedgerow marked 32 on sheet 6 of 12 of the important hedgerows and tree preservation order plan.,


District of East Suffolk,Several mixed deciduous and coniferous species consisting mainly of Silver Birch, Oak, Beech, Sycamore, Horse Chestnut, Cherry, Scots Pine, Corsican Pine, mixed Ornamental Conifers and Evergreen Oak.,Tree Preservation Order 1987, Area Number A1, TPO Number SCDC/87/00030 marked on sheet 5 of 12 of the important hedgerows and tree preservation order plan.,Removal, trimming, lopping and coppicing of trees within Tree Preservation Order 1987, Area Number A1, TPO Number SCDC/87/00030 to be carried out to facilitate the construction of the authorised development and to ensure its future operation.,

1,52° 14 39.654N,02° 11 21.656E,
2,52° 15 04.022N,02° 13 12.152E,
3,52° 02 57.281N,02° 19 46.696E,
4,52° 02 52.969N,02° 08 40.302E,
5,52° 03 53.133N,02° 07 14.881E,
6,52° 08 38.942N,02° 07 41.310E,
7,52° 13 29.526N,02° 08 08.272E,

Work No. 1(c) (inter-array cables),200 kilometres,204,000 m 2,229,440 m 3,
Work No. 4 (platform link cables),75 kilometres,104,550 m 2,117,588 m 3,

1,52° 14 39.654N,02° 11 21.656E,
2,52° 15 04.022N,02° 13 12.152E,
3,52° 02 57.281N,02° 19 46.696E,
4,52° 02 52.969N,02° 08 40.302E,
5,52° 03 53.133N,02° 07 14.881E,
6,52° 08 38.942N,02° 07 41.310E,
7,52° 13 29.526N,02° 08 08.272E,
8,52° 17 42.613N,02° 08 31.830E,
9,52° 18 44.262N,02° 06 49.319E,
10,52° 18 39.650N,01° 57 24.848E,
11,52° 17 25.858N,01° 54 09.969E,
12,52° 17 24.663N,01° 52 03.374E,
13,52° 15 14.373N,01° 45 57.606E,
14,52° 15 04.711N,01° 49 39.684E,
15,52° 15 01.611N,01° 49 53.749E,
16,52° 14 55.768N,01° 50 02.126E,
17,52° 11 16.087N,01° 53 12.972E,
18,52° 11 06.257N,01° 53 33.515E,
19,52° 10 49.579N,01° 55 24.050E,
20,52° 10 56.146N,01° 59 23.916E,
21,52° 11 39.569N,02° 01 58.824E,
22,52° 11 52.131N,02° 03 14.901E,
23,52° 11 21.410N,02° 03 41.116E,
24,52° 11 06.526N,02° 02 15.690E,
25,52° 09 40.842N,01° 57 07.198E,
26,52° 09 39.286N,01° 55 07.950E,
27,52° 10 54.492N,01° 52 29.501E,
28,52° 14 31.482N,01° 49 20.497E,
29,52° 14 40.142N,01° 45 33.942E,
30,52° 14 29.510N,01° 45 06.050E,
31,52° 10 51.365N,01° 42 32.460E,
32,52° 09 56.713N,01° 39 52.443E,
33,52° 09 53.117N,01° 38 40.253E,
34,52° 10 06.702N,01° 37 38.597E,
35,52° 10 44.466N,01° 37 04.551E,
36,52° 11 01.504N,01° 37 17.750E,
37,52° 11 02.378N,01° 37 15.833E,
38,52° 11 11.451N,01° 37 20.545E,
39,52° 11 22.030N,01° 37 22.233E,
40,52° 11 30.678N,01° 37 21.417E,
41,52° 11 31.210N,01° 37 24.534E,
42,52° 11 33.421N,01° 37 24.505E,
43,52° 11 53.663N,01° 37 50.246E,
44,52° 12 26.106N,01° 40 17.584E,
45,52° 13 37.194N,01° 41 04.014E,
46,52° 15 54.943N,01° 45 03.442E,
47,52° 18 25.193N,01° 52 05.276E,
48,52° 20 19.496N,01° 56 37.327E,
49,52° 20 25.400N,02° 08 48.429E,
50,52° 20 02.196N,02° 08 47.461E,
51,52° 20 02.235N,02° 10 29.142E,
52,52° 19 10.459N,02° 10 57.491E,
53,52° 19 10.435N,02° 09 35.567E,
54,52° 16 21.190N,02° 09 19.730E,

Work No. 4 (platform link cables),75 kilometres,104,550 m 2,117,588 m 3,
Work Nos. 5 and 6 (export cables),160 kilometres,108,800 m 2,122,368 m 3,


6.1,APP-049 to APP-079,Environmental Statement,1,25th October 2019,
6.2,APP-080 to APP-441,Figures,1,25th October 2019,
6.3,APP-442 to APP-571,Technical Appendices,1,25th October 2019,
ExA.WQ-1.A10.D1.V1 (Chapter 6),REP1-099 (APP-054),Applicants’ Responses to WQ1 Appendix 10 Landfall Indicative HDD Working Area,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A11.D1.V1 (Chapter 6),REP1-100 (APP-054),Applicants’ Responses to WQ1 Appendix 11 Landfall HDD Cross Sections,1,Deadline 1 2nd November 2020,
ExA.AS-13.D6.V1 (Chapter 6),REP6-024 (APP-054),HDD Verification Clarification Note,1,Deadline 6 24th February 2021,
ExA.WQ-1.A6.D1.V1 (Chapter 6),REP1-090 (APP-054),Applicants’ Responses to WQ1 Appendix 6 Illustrative Open Trench and Trenchless Onshore Cable Route,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A7.D1.V1 (Chapter 6),REP1-091 (APP-054),Applicants’ Responses to WQ1 Appendix 7 Onshore Crossing Schedule,1,Deadline 1 2nd November 2020,
ExA.AS-10.D3.V1 (Chapter 6),REP3-056 (APP-054),Onshore Cable Route Works Programme Clarification Note,1,Deadline 3 15th December 2020,
ExA.AS-11.D3.V1 (Chapter 6) (Chapter 29),REP3-057 (APP-054) (APP-077),Onshore Substations Update Clarification Note,1,Deadline 3 15th December 2020,
ExA.AS-12.D3.V1 (Chapter 6),REP3-058 (APP-054),Construction in Proximity to Properties,1,Deadline 3 15th December 2020,
6.3.6.2 (Chapter 6),REP8-015 (APP-054),EA2 Environmental Statement Appendix 6.2 Relationship of Onshore Plans Secured by the DCO,5,Deadline 8 25th March 2021,
6.3.6.3 (Chapter 6),REP8-016 (APP-054),EA2 Environmental Statement Appendix 6.3 Relationship of Offshore Plans Secured by the DCO,5,Deadline 8 25th March 2021,
6.3.6.4 (Chapter 6),REP3-020 (APP-054),EA2 Environmental Statement Appendix 6.4 Cumulative Project Description,2,Deadline 3 15th December 2020,
ExA.RRA6.D0.V1 (Chapters 7 to 17),AS-043 (APP-055 to APP-065), Applicant’s Comments on Relevant Representations  ... Appendix 6 Disposal Site Locations (Windfarm Site),1,11th June 2020,
ExA.RRA2.D0.V1 (Chapter 7),AS-039 (APP-055),Applicant’s Comments on Relevant Representations  ... Appendix 2 Wave Climatology Clarification Note,1,11th June 2020,
ExA.AS-13.D3.V1 (Chapter 7) (Chapter 9) (Chapter 10) (Chapter 12),REP3-059 (APP-055) (APP-057) (APP-058) (APP-060),Effects on Supporting Habitats of Outer Thames Estuary SPA Clarification Note,1,Deadline 3 15th December 2020,
ExA.RRA3.D0.V1 (Chapter 10),AS-040 (APP-058), Applicant’s Comments on Relevant Representations  ... Appendix 3 Fish and Shellfish Ecology Clarification Note,1,11th June 2020,
ExA.AS-5.D11.V2 (Chapter 11),REP11-045  (APP-059),Underwater Noise Modelling Report Update,2,Deadline 11 7th June 2021,
ExA.AS-3.D2.V1 (Chapter 12),REP2-006 (APP-060),Cumulative Auk Displacement and Seabird Assemblage Assessment of FFC SPA and Gannet PVA,1,Deadline 2 17th November 2020,
ExA.AS-2.D11.V5 (Chapter 12),REP11-026 (APP-060),Displacement of red-throated divers in the Outer Thames Estuary SPA,5,Deadline 11 7th June 2021,
ExA.AS-20.D1.V1 (Chapter 19) (Chapter 26),REP1-040 (APP-067) (APP-074),Deadline 1 Air Quality Clarification Note,1,Deadline 1 2nd November 2020,
ExA.AS-16.D3.V1 (Chapter 19),REP3-061 (APP-067),Deadline 3 Air Quality Clarification Note,1,Deadline 3 15th December 2020,
ExA.WQ-1.A8.D1.V1 (Chapter 20),REP1-092 (APP-068),Applicants’ Responses to WQ1 Appendix 8 Environment Agency Flood Zones,1,Deadline 1 2nd November 2020,
ExA.AS-9.D4.V2 (Chapter 20),REP4-044 (APP-068), Clarification Note SuDS Infiltration Note,2,Deadline 4 13th January 2021,
ExA.AS-12.D6.V1 (Chapter 18) (Chapter 20),REP6-021 (APP-066) (APP-068),Landfall Hydrogeological Risk Assessment,1,Deadline 6 24th February 2021,
ExA.AS-13.D8.V1 (Chapter 20),REP8-038 (APP-068),Flood Risk and Drainage Clarification Note,1,Deadline 8 25th March 2021,
ExA.AS-11.D1.V1 (Chapter 21),REP1-022 (APP-069),Land Use Clarification Note,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A4.D1.V1 (Chapter 22),REP1-088 (APP-070),Applicants’ Responses to WQ1 Appendix 4 Ecological Mitigation Works,1,Deadline 1 2nd November 2020,
ExA.AS-12.D1.V1 (Chapter 22),REP1-023 (APP-070),Onshore Ecology Clarification Note,1,Deadline 1 2nd November 2020,
ExA.AS-16.D1.V1 (Chapter 22),REP1-035 (APP-070),Ecological Enhancement Clarification Note,1,Deadline 1 2nd November 2020,
ExA.AS-14.D3.V1 (Chapter 22),REP3-060 (APP-070),Deadline 3 Onshore Ecology Clarification Note,1,Deadline 3 15th December 2020,
ExA.AS-10.D4.V1 (Chapter 22),REP4-005 (APP-070),Deadline 4 Onshore Ecology Clarification Note,1,Deadline 4 13th January 2021,
ExA.AS-14.D6.V1 (Chapter 22),REP6-025 (APP-070),Deadline 6 Onshore Ecology Clarification Note,1,Deadline 6 24th February 2021,
ExA.AS-28.D6.V1 (Chapter 22),REP6-035 (APP-070),Ecology Survey Results: February 2021,1,Deadline 6 24th February 2021,
ExA.AS-16.D8.V1 (Chapter 22),REP8-041 (APP-070),Ecological Enhancement Clarification Note Addendum,1,Deadline 8 25th March 2021,
ExA.AS-10.D1.V1 (Chapter 24) (Chapter 29),REP1-021 (APP-072) (APP-077),Archaeology and Cultural Heritage Clarification Note,1,Deadline 1 2nd November 2020,
ExA.AS-13.D1.V1 (Chapter 24),REP1-024 (APP-072),Pre-Construction Trial Trenching Report,1,Deadline 1 2nd November 2020,
ExA.AS-14.D1.V1 (Chapter 24),REP1-025 to REP1-033 (APP-072),Onshore Archaeology Geophysical Survey Report (Parts 1 to 9),1,Deadline 1 2nd November 2020,
ExA.AS-15.D1.V1 (Chapter 24),REP1-034 (APP-072),Onshore Archaeology Earthworks Report,1,Deadline 1 2nd November 2020,
ExA.AS-29.D8.V1 (Chapter 24),REP8-063 (APP-072),Cultural heritage Viewpoint 5 Additional Visualisation,1,Deadline 8 25th March 2021,
ExA.AS-16.D3.V1 (Chapter 24) (Chapter 29),REP3-062 to REP3-068 (APP-072) (APP-077),Updated Photomontages Clarification Note,1,Deadline 3 15th December 2020,
ExA.AS-11.D4.V1 (Chapter 24),REP4-006 (APP-072),Heritage Assessment Addendum,1,Deadline 4 13th January 2021,
ExA.AS-11.D4.V1_001 (Chapter 24),REP4-007 (APP-072),Heritage Assessment Addendum Appendix 1 CHVP2 –PRoW between Friston Hall and Friston (Appendix 24.7, Figure 7 Update), 1 ,Deadline 4 13th January 2021,
ExA.AS-11.D4.V1_002 (Chapter 24),REP4-008 (APP-072),Heritage Assessment Addendum Appendix 2 CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8 Update), 1 ,Deadline 4 13th January 2021,
ExA.AS-11.D4.V1_003 (Chapter 24),REP4-009 (APP-072),Heritage Assessment Addendum Appendix 3 CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9 Update), 1 ,Deadline 4 13th January 2021,
ExA.AS-11.D4.V1_004 (Chapter 24),REP4-010 (APP-072),Heritage Assessment Addendum Appendix 4 CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10 Update), 1 ,Deadline 4 13th January 2021,
ExA.AS-11.D4.V1_005 (Chapter 24),REP4-011 (APP-072),Heritage Assessment Addendum Appendix 5 CHVP7 – Friston House (b) (Appendix 24.7, Figure 12 Update), 1 ,Deadline 4 13th January 2021,
ExA.AS-11.D4.V1_006 (Chapter 24),REP4-012 (APP-072),Heritage Assessment Addendum Appendix 6 CHVP8 – Friston War Memorial (Appendix 24.7, Figure 13 Update), 1 ,Deadline 4 13th January 2021,
 ExA.AS-30.D11.V1 (Chapter 24),REP11-075,Heritage Assessment GIS Addendum,1,Deadline 11 7th June 2021,
 ExA.AS-30.D11.V1_01 (Chapter 24),REP11-076,Heritage Assessment GIS Addendum App 1 CHVP2 App 24.7 Fig 7 Update,1,Deadline 11 7th June 2021,
 ExA.AS-30.D11.V1_02 (Chapter 24),REP11-077,Heritage Assessment GIS Addendum App 2 CHVP3 App 24.7 Fig 8 Update,1,Deadline 11 7th June 2021,
 ExA.AS-30.D11.V1_03 (Chapter 24),REP11-078,Heritage Assessment GIS Addendum App 3 CHVP4 App 24.7 Fig 9 Update,1,Deadline 11 7th June 2021,
ExA.AS-30.D11.V1_04 (Chapter 24),REP11-054,Heritage Assessment GIS Addendum App 4 CHVP5 App 24.7 Fig 10 Update,1,Deadline 11 7th June 2021,
 ExA.AS-30.D11.V1_05 (Chapter 24),REP11-079,Heritage Assessment GIS Addendum App 5 CHVP7 App 24.7 Fig 12 Update,1,Deadline 11 7th June 2021,
 ExA.AS-30.D11.V1_06 (Chapter 24),REP11-080,Heritage Assessment GIS Addendum App 6 CHVP8 App 24.7 Fig 13,1,Deadline 11 7th June 2021,
ExA.AS-14.D8.V1 (Chapter 25),REP8-039 (APP-073),Applicants’ Position Statement on Noise,1,Deadline 8 25th March 2021,
ExA.AS-8.D2.V1 (Chapter 25),REP2-011 (APP-073),Noise and Vibration Assessment Clarification Note,1,Deadline 2 17th November 2020,
ExA.AS-8.D4.V1 (Chapter 25),REP4-043 (APP-073),Noise Modelling Clarification Note,1,Deadline 4 13th January 2021,
ExA.WQ-1.A14.D1.V1 (Chapter 26),REP1-103 (APP-074),Applicants’ Responses to WQ1 Appendix 14 Junction Locations,1,Deadline 1 2nd November 2020,
ExA.AS-8.D1.V1 (Chapter 26),REP1-048 (APP-074),Traffic and Transport Clarification Note for Deadline 1,1,Deadline 1 2nd November 2020,
ExA.AS-6.D6.V2 (Chapter 26),REP6-043 (APP-074),Sizewell C Cumulative Impact Assessment Note (Traffic and Transport),2,Deadline 6 24th February 2021,
ExA.AS-9.D3.V1 (Chapter 26),REP3-055 (APP-074),Traffic and Transport Clarification Note for Deadline 3,1,Deadline 3 15th December 2020,
ExA.AS-26.D4.V1 (Chapter 26),REP4-027 (APP-074),Traffic and Transport Deadline 4 Clarification Note,1,Deadline 4 13th January 2021,
ExA.AS-9.D1.V1 (Chapters 27 to 30),REP1-049 (APP-075 to APP-078),Public Rights of Way Clarification Note,1,Deadline 1 2nd November 2020,
ExA.AS-5.D2.V1 (Chapter 28) (Chapter 29),REP2-008 (APP-076) (APP-077),Effects with Regard to the Statutory Purposes of the Suffolk Coast and Heaths Area of Outstanding Natural Beauty and Accordance with NPS Policy,1,Deadline 2 17th November 2020,
ExA.AS-33.D8.V1 (Chapter 28),REP8-075 (APP-076),Landscape and Visual: Sizewell C Cumulative Impact Assessment,1,Deadline 8 25th March 2021,
ExA.WQ-1.A9.7.D1.V1 (Chapter 29),REP1-093 (APP-077),Applicants’ Responses to WQ1 Appendix 9.7 EA2 Annotated Viewpoint 1,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A9.8.D1.V1 (Chapter 29),REP1-094 (APP-077),Applicants’ Responses to WQ1 Appendix 9.8 EA2 Annotated Viewpoint 2,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A9.9.D1.V1 (Chapter 29),REP1-095 (APP-077),Applicants’ Responses to WQ1 Appendix 9.9 EA2 Annotated Viewpoint 3,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A9.10.D1.V1 (Chapter 29),REP1-096 (APP-077),Applicants’ Responses to WQ1 Appendix 9.10 EA2 Annotated Viewpoint 4,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A9.11.D1.V1 (Chapter 29),REP1-097 (APP-077),Applicants’ Responses to WQ1 Appendix 9.11 EA2 Annotated Viewpoint 5,1,Deadline 1 2nd November 2020,
ExA.WQ-1.A9.12.D1.V1 (Chapter 29),REP1-098 (APP-077),Applicants’ Responses to WQ1 Appendix 9.12 EA2 Annotated Viewpoint 8,1,Deadline 1 2nd November 2020,
ExA.AS-7.D2.V1 (Chapter 29),REP2-010 (APP-077),Sizewell C Cumulative Impact Assessment Note (Landscape and Visual),1,Deadline 2 17th November 2020,
ExA.AS-3.D4.V1 (Chapter 29),REP4-031 (APP-077),Landscape and Visual Impact Assessment Addendum,1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_001 (Chapter 29),REP4-032 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 1 Viewpoint 1 – Public Right of Way (PRoW) near Friston House (Figure 29.13 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_002 (Chapter 29),REP4-033 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 2 Viewpoint 2 – Friston, Church Road (Figure 29.14 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_003 (Chapter 29),REP4-034 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 3 Viewpoint 3 – Grove Road, near Pear Tree Farm (Figure 29.15 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_004 (Chapter 29),REP4-035 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 4 Viewpoint 4 – Grove Road, near Church Road (Friston) (Figure 29.16 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_005 (Chapter 29),REP4-036 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 5 Viewpoint 5 – PRoW near Moor Farm (Figure 29.17 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_006 (Chapter 29),REP4-037 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 6 Viewpoint 6 – Friston, Village Green (Figure 29.18 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_007 (Chapter 29),REP4-038 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 7 Viewpoint 8 – Saxmundham Road (North of Friston) (Figure 29.20 Update),1,Deadline 4 13th January 2021,
ExA.AS-3.D4.V1_008 (Chapter 29),REP4-039 (APP-077),Landscape and Visual Impact Assessment Addendum Appendix 8 Viewpoint 9 – B1121 Aldeburgh Road, south of Friston (Figure 29.21 Update),1,Deadline 4 13th January 2021,
ExA.AS-6.D7.V1 (Chapter 29),REP7-062 (APP-077),Updated Figure 29.37- Viewpoint 5 Public Rights of Way, near Moor Farm (with National Grid GIS Substation),1,Deadline 7 4th March 2021,
ExA.AS-28.D8.V1_01 (Chapter 29),REP8-055 (APP-077),National Grid GIS Substation Photomontages: Figure 29.13 Update Viewpoint 1 Public Rights of Way near Friston House,1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_02 (Chapter 29),REP8-056 (APP-077),National Grid GIS Substation Photomontages: Figure 29.14 Update Viewpoint 2 Friston, Church Road,1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_03 (Chapter 29),REP8-057 (APP-077),National Grid GIS Substation Photomontages: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm,1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_04 (Chapter 29),REP8-058 (APP-077),National Grid GIS Substation Photomontages: Figure 29.20 Update Viewpoint 8 Saxmundham Road (North of Friston),1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_05 (Chapter 29),REP8-059 (APP-077),National Grid GIS Substation Photomontages: Figure 29.21 Update Viewpoint 9: B1121 Aldeburgh Road (south of Friston),1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_06 (Chapter 29),REP8-060 (APP-077),National Grid GIS Substation Photomontages: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update),1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_07 (Chapter 29),REP8-061 (APP-077),National Grid GIS Substation Photomontages: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update),1,Deadline 8 25th March 2021,
ExA.AS-28.D8.V1_08 (Chapter 29),REP8-062 (APP-077),National Grid GIS Substation Photomontages: CHVP5 – PRoW at Woodside Farm (Appendix 24.7, Figure 10-Update),1,Deadline 8 25th March 2021,
ExA.AS-30.D8.V1_01 (Chapter 29),REP8-066 (APP-077),Different colour schemes for Substations Design Principles Statement : Viewpoint 1 Public Rights of Way near Friston House,1,Deadline 8 25th March 2021,
ExA.AS-30.D8.V1_02 (Chapter 29),REP8-067 (APP-077),Different colour schemes for Substations Design Principles Statement: Viewpoint 2 Friston, Church Road,1,Deadline 8 25th March 2021,
ExA.AS-30.D8.V1_03 (Chapter 29),REP8-068 (APP-077),Different colour schemes for Substations Design Principles Statement: Viewpoint 9 – B1121 Aldeburgh Road, south of Friston,1,Deadline 8 25th March 2021,
ExA.AS-31.D8.V1_01 (Chapter 29),REP8-071 (APP-077),Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.14 Update Viewpoint 2 Friston, Church Road,1,Deadline 8 25th March 2021,
ExA.AS-31.D8.V1_02 (Chapter 29),REP8-072 (APP-077),Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.17 Update Viewpoint 5 Public Rights of Way, near Moor Farm,1,Deadline 8 25th March 2021,
ExA.AS-31.D8.V1_03 (Chapter 29),REP8-073 (APP-077),Viewpoint Photomontages with Potential National Grid Extension Bays: Figure 29.20 Update Viewpoint 8 Saxmundham Road (North of Friston),1,Deadline 8 25th March 2021,
ExA.AS-31.D8.V1_04 (Chapter 29),REP8-069 (APP-077),Viewpoint Photomontages with Potential National Grid Extension Bays: CHVP3 – PRoW between Moor Farm and Little Moor Farm (Appendix 24.7, Figure 8-Update),1,Deadline 8 25th March 2021,
ExA.AS-31.D8.V1_05 (Chapter 29),REP8-070 (APP-077),Viewpoint Photomontages with Potential National Grid Extension Bays: CHVP4 – PRoW to east of Little Moor Farm (Appendix 24.7, Figure 9-Update),1,Deadline 8 25th March 2021,
ExA.AS-32.D8.V1 (Chapter 29),REP8-074 (APP-077),Extension of National Grid Substation Appraisal,1,Deadline 8 25th March 2021,
ExA.AS-4.D11.V1 (Chapter 29),REP11-028,Landscape and Visual Impact Assessment GIS Addendum,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_01 (Chapter 29),REP11-029,LVIA GIS Addendum Appendix 1 Viewpoint 1 Figure 29.13 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_02 (Chapter 29),REP11-030,LVIA GIS Addendum Appendix 2 Viewpoint 2 Figure 29.14 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_03 (Chapter 29),REP11-031,LVIA GIS Addendum Appendix 3 Viewpoint 3 Figure 29.15 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_04 (Chapter 29),REP11-032,LVIA GIS Addendum Appendix 4 Viewpoint 4 Figure 29.16 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_05 (Chapter 29),REP11-033,LVIA GIS Addendum Appendix 5 Viewpoint 5 Figure 29.17 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_06 (Chapter 29),REP11-034,LVIA GIS Addendum Appendix 6 Viewpoint 6 Figure 29.18 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_07 (Chapter 29),REP11-035,LVIA GIS Addendum Appendix 7 Viewpoint 8 Figure 29.20 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_08 (Chapter 29),REP11-036,LVIA GIS Addendum Appendix 8 Viewpoint 9 Figure 29.21 GIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_09 (Chapter 29),REP11-037,LVIA GIS Addendum Appendix 9 Viewpoint 1 Figure 29.13 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_10 (Chapter 29),REP11-038,LVIA GIS Addendum Appendix 10 Viewpoint 2 Figure 29.14 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_11 (Chapter 29),REP11-039,LVIA GIS Addendum Appendix 11 Viewpoint 3 Figure 29.15 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_12 (Chapter 29),REP11-040,LVIA GIS Addendum Appendix 12 Viewpoint 4 Figure 29.16 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_13 (Chapter 29),REP11-041,LVIA GIS Addendum Appendix 13 Viewpoint 5 Figure 29.17 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_14 (Chapter 29),REP11-042,LVIA GIS Addendum Appendix 14 Viewpoint 6 Figure 29.18 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_15 (Chapter 29),REP11-043,LVIA GIS Addendum Appendix 15 Viewpoint 8 Figure 29.20 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-4.D11.V1_16 (Chapter 29),REP11-044,LVIA GIS Addendum Appendix 16 Viewpoint 9 Figure 29.21 AIS Update,1,Deadline 11 7th June 2021,
ExA.AS-17.D1.V1 (Chapter 30),REP1-036 (APP-078),Socio-Economics and Tourism Clarification Note (SZC CIA),1,Deadline 1 2nd November 2020,
ExA.WQ-1.A13.D1.V1 (Chapter 30),REP1-102 (APP-078),Applicants’ Responses to WQ1 Appendix 13 Tourism Impact Review,1,Deadline 1 2nd November 2020,
5.3,APP-043,Habitat Regulations Assessment - Information to Support the Appropriate Assessment Report,1,25th October 2019,
5.3.1,APP-044,Habitat Regulations Assessment - Appendix 1 - Information to Support AA Report - HRA Screening Report,1,25th October 2019,
5.3.2,REP3-016,Habitat Regulations Assessment Appendix 2 – Information to Support AA Report – Screening Matrices,3,Deadline 3 15th December 2020,
5.3.3,APP-046,Habitat Regulations Assessment - Appendix 3 - Information to Support AA Report - Integrity Matrices,1,25th October 2019,
ExA.AS-19.D1.V1 (Chapter 11),REP1-038 (APP-059),Information to Support AA – Addendum for Marine Mammals,1,Deadline 1 2nd November 2020,
 ExA.AS-7.D1.V1 (Information to Support Appropriate Assessment Report),REP1-047 (APP-043 to APP-047),Deadline 1 Offshore Ornithology Cumulative and In Combination Collision Risk Update,1,Deadline 1 2 November 2020,
ExA.AS-7.D4.V1 (Information to Support Appropriate Assessment Report),REP4-042 (APP-043 to APP-047),Deadline 4 Offshore Ornithology Cumulative and In Combination Collision Risk Update,1,Deadline 4 13th January 2021,
ExA.AS-11.D8.V1 (Information to Support Appropriate Assessment Report),REP8-035 (APP-043 to APP-047),Deadline 8 Offshore Ornithology Cumulative and In Combination Collision Risk Update,1,Deadline 8 25th March 2021,
ExA.AS-3.D11.V1 (Information to Support Appropriate Assessment Report),REP11-027 (APP-043 to APP-047),Deadline 11 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update,1,Deadline 11 7th June 2021,
 ExA.AS-8.D12.V1 (Information to Support Appropriate Assessment Report),REP12-066 (APP-043 to APP-047),Deadline 12 Offshore Ornithology Cumulative and In Combination Collision Risk and Displacement Update,1,Deadline 13 15 July 2021,
ExA.AS-12.D13.V1 (Information to Support Appropriate Assessment Report),REP13-019 (APP-043 to APP-047),Deadline 13 Offshore Ornithology Cumulative and In-Combination Collision Risk and Displacement Update,1,Deadline 13 5th July 2021,
 ExA.AS-3.SoSQ.V1 (Information to Support Appropriate Assessment Report),(APP-043 to APP-047),Updated Offshore Ornithology Cumulative and In-Combination Collision Risk and Displacement Assessment”,1,Column (5) “30 November 2021”,


2.2,REP11-003,Land Plans (onshore),6,Deadline 11 7th June 2021,
2.2.1,AS-002,Land Plans (offshore) (Rev 2) ,1,20th December 2019,
2.3.1,APP-010,Works Plans (offshore) (Rev 4) ,1,25th October 2019,
2.3.2,REP11-004,Works Plans (onshore),7,Deadline 11 7th June 2021,
2.4,REP12-004,Access to Works Plan (Rev 2),2,Deadline 12 28th June 2021,
2.5,REP12-005,Temporary Stopping up of Public Rights of Way Plan (Rev 4),4,Deadline 12 28th June 2021,
2.6,REP12-006,Permanent Stopping up of Public Rights of Way Plan (Rev 4),3,Deadline 12 28th June 2021,
2.10,REP12-012,Important Hedgerows and Tree Preservation Order Plan (Rev 4),4,Deadline 12 28th June 2021,
2.12,APP-022,Order limits boundary coordinates plan (offshore),1,25th October 2019,
4.3,REP12-019,Book of Reference (Version 10),10,Deadline 12 28th June 2021,
8.1,. . .,Outline Code of Construction Practice ( Version 10 ), 10 , 31 January 2022,
8.4,AS-116,Outline Public Rights of Way Strategy,3,22nd April 2021,
8.5,REP6-005,Outline Written Scheme of Investigation (Onshore Archaeology),3,Deadline 6 24th February 2021,
8.6,REP3-028,Outline Written Scheme of Investigation (Offshore),2,Deadline 3 15th December 2020,
8.7,. . .,Outline Landscape and Ecological Management Strategy ( Version 08 ), 8 ,Deadline 13  31 January 2022,
8.9,REP11-017,Outline Construction Traffic Management Plan,6,Deadline 11 7th June 2021,
8.10,REP12-023,Outline Access Management Plan (Version 07),7,Deadline 12 28th June 2021,
8.11,REP11-022,Outline Travel Plan,6,Deadline 11 7th June 2021,
8.12,REP7-027,Outline Offshore Operations and Maintenance Plan,3,Deadline 7 4th March 2021,
8.13,REP8-027,Offshore In Principle Monitoring Plan,4,Deadline 8 25th March 2021,
8.14,REP8-029,Draft Marine Mammal Mitigation Protocol,4,Deadline 8 25th March 2021,
8.17,REP8-031,In Principle East Anglia TWO Project Southern North Sea SAC Site Integrity Plan,4,Deadline 8 25th March 2021,
8.18,APP-595,Outline Navigation Monitoring Strategy,1,25th October 2019,
8.20,REP1-019,Outline pre-commencement archaeology execution plan (onshore) ,2,Deadline 1 2nd November 2020,
ExA.AS-1.D12.V4,REP12-025,Outline Landfall Construction Method Statement (Version 04),4,Deadline 12 28th June 2021,
ExA.AS-2.D12.V3,REP12-027,Outline SPA Crossing Method Statement (Version 03),3,Deadline 12 28th June 2021,
ExA.AS-6.D8.V2,REP8-086,Outline Sizewell Gap Construction Method Statement,2,Deadline 8 25th March 2021,
ExA.AS-5.D3.V2,REP3-050,Outline Fisheries Liaison and Coexistence Plan,2,Deadline 3 15th December 2020,
ExA.AS-4.D6.V3,REP6-039,Outline Sabellaria Reef Management Plan,3,Deadline 6 24th February 2021,
 ExA.AS-13.D13.V7 ,REP13-020,Outline Operational Drainage Management Plan (Version 07), 7 ,Deadline 13 5th July 2021,
ExA.AS- 5.D12.V5,REP12-062,Outline Port Construction Traffic Management and Travel Plan,5,Deadline 12 28th June 2021,
ExA.AS- 29.D11.V4,REP11-074,Outline Watercourse Crossing Method Statement,4,Deadline 11 7th June 2021,
ExA.AS-12.D8.V3,REP8-036,Best Practice Protocol for Minimising Disturbance to Red-Throated Diver,3,Deadline 8 25th March 2021,
ExA.AS-6.D11.V4,AS-133,Substations Design Principles Statement (Rev 04), 4 ,... 21st June 2021,
 ExA.AS-6.SoSQ2.V5 ,. . .,Offshore Ornithology Without Prejudice Compensation Measures, 5 , 31 January 2022 ,
ExA.AS-35.D8.V2,REP8-077,Activity Exclusion Zones Plan,2,Deadline 8 25th March 2021,
ExA.AS-15.D7.V1,REP7-037,Sizewell C Order Limits Interaction – Offshore Plan,1,Deadline 7 4th March 2021,
ExA.AS-34. D9.V2,REP9-031,Layout Principles Statement,2,Deadline 9 15th April 2021,