The A57 Link Roads Development Consent Order 2022

Article 31

SCHEDULE 7E+W+SLAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Commencement Information

I1Sch. 7 in force at 7.12.2022, see art. 1

(1)

Plot Reference Number shown on Land Plans

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

Land Plans – Sheet 1
1/1hRequired for works to improve the M67 Junction 4 roundabout, the construction of a drainage ditch, and the creation of a new public right of wayWork Nos. 3, 7, 40
1/6aRequired for works to improve the M67 Junction 4 roundabout, the construction of a drainage ditch, and the creation of a new public right of wayWork Nos. 3, 7, 40
1/9cRequired for access to and creation of new culverts for structural inspections and maintenance and the construction of new drainage ditches to the north of the A57 link between M67 and Roe Cross RoadWork Nos. 36, 40
Land Plans – Sheet 2
2/1cRequired for works to culverted watercourses and to create new watercourseWork Nos. 36, 41
2/1dRequired for the creation of access and egress points serving land situated south of Edge Lane and for works to culverted watercourses and to create new watercourseWork Nos.. 9, 36, 41
2/1eRequired for the creation of new public rights of way, north and south of the proposed new dual carriagewayWork No. 7
2/1hRequired for the creation of new public rights of way, north and south of the proposed new dual carriageway and for the diversion of Hurstclough BrookWork Nos. 7, 43
2/1jRequired for the construction of new drainage ditches.Work No. 40
2/2aRequired for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass and for the creation of drainage ditchesWork Nos. 32, 40
2/2dRequired for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram UnderpassWork No. 32
2/2fRequired for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram UnderpassWork No. 32
Land Plans – Sheet 3
3/2xRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/2aaRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/2bbRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/2ccRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/3eRequired for the construction of a new section of the eastbound A57 dual carriageway, new watercourses and utility diversionsWork Nos. 5, 44, 58
3/3fRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/3hRequired for the construction of a new section of the eastbound A57 dual carriageway, new watercourse and the diversion of buried power cablesWork Nos. 5, 44, 61
3/14Required for the realignment of Old Hall Lane and the creation of a means of access and egress to the south of land currently known as the ShowgroundWork Nos. 10, 11
3/15bRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/16bRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/17aRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/18Required for the realignment of Old Hall LaneWork No. 10
3/20aRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/22bRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork Nos. 11, 66
3/22cRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/22dRequired for the construction of new watercourses to manage local drainageWork No. 44
3/22eRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork Nos. 11, 66
3/24Required for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/25Required for the construction of new watercourses to manage local drainageWork No. 44
3/27bRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/27cRequired for the construction of a new section of the eastbound A57 dual carriageway, the diversion of a water sewerage pipe, the construction of new watercourses to manage local drainage and diversion of water sewage pipesWork Nos. 5, 44, 58
3/27dRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/28aRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/28bRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
3/29Required for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
Land Plans – Sheet 4
4/3aRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
4/8bRequired for the construction of an earthworks screening bundWork No. 48
4/9Required for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
4/10aRequired for the creation of means of access and egress to the south of the land currently known as the ShowgroundWork No. 11
4/10cRequired for the diversion of buried power cablesWork No. 61
4/12cRequired for the creation of means of access and egress to the south of the land currently known as the Showground and the development of a short cul de sac to the west of the proposed Mottram Moor JunctionWork Nos. 11, 17, 66
4/12dRequired for the diversion of buried power cablesWork No. 61
4/13aRequired for the creation of a footpath between the Mottram Moor Junction and the existing footpath, the creation of a culvert to carry an unnamed watercourse and a diversion of Tara Brook southWork Nos. 21, 36, 45
4/13cRequired for the creation of a footpath between the Mottram Moor Junction and the existing footpath the creation of a culvert to carry Tara Brook, a diversion of Tara Brook and the construction of an earthworks screening bundWork Nos. 21, 36, 45, 48
4/13fRequired for the creation of a private access track for the maintenance of a pondWork No. 20
4/13hRequired for the creation of a culvert to carry Tara Brook, a diversion of Tara Brook and the construction of various drainage ditchesWork Nos. 36, 45, 46
4/13iRequired for the construction of a drainage retention pond, the diversion of Tara Brook and the diversion of existing water mainWork Nos. 38, 45, 59
4/13kRequired for the construction of various drainage ditches and the construction of an earthworks screening bundWork Nos. 46, 48
4/14bRequired for the diversion of buried power cablesWork No. 61
4/20Required for the creation of a private access track for the maintenance of a pondWork No. 20
4/22bRequired for the diversion of existing water main and the diversion of Tara BrookWork Nos. 59, 45
Land Plans – Sheet 5
5/1aRequired for the construction of various drainage ditches and the construction of an earthworks screening bundWork Nos. 46, 48
5/1cRequired for the realignment of Carrhouse Lane and the construction of various drainage ditchesWork Nos. 23, 46
5/1eRequired for the creation of a new bridleway, the construction of the A57 Link Road and the realignment of Carrhouse LaneWork Nos. 14, 22, 23
5/1gRequired for the construction of the A57 Link Road and the realignment of Carrhouse LaneWork Nos. 22, 23
5/1hRequired for the realignment of Carrhouse LaneWork No. 23
5/1kRequired for the realignment of Carrhouse Lane and the construction of various drainage ditchesWork Nos. 23, 46
5/2Required for the construction of the A57 Link Road and the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse LaneWork Nos. 22, 24
5/3Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainageWork No. 23
5/6aRequired for the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse LaneWork No. 24
5/6dRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainageWork No. 23
5/7bRequired for the construction of various drainage ditchesWork No. 46
5/7cRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainageWork No. 23
5/7eRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
5/7gRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
5/7hRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
5/8Required for the construction of various drainage ditchesWork No. 46
5/9aRequired for the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane and the construction of various drainage ditchesWork Nos. 24, 46, 66
5/9cRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
5/9eRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
5/9fRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
5/9gRequired for the creation of a new access track to Carrhouse Lane FarmWork No. 56
Land Plans – Sheet 6
6/1aRequired for the diversion of a footpath facilitating a private access track to Pond 3 and access to an existing maintenance track, the creation of a culvert to carry a drainage ditch and the construction of various drainage ditchesWork Nos. 25, 36, 46
6/1cRequired for the construction of various drainage ditchesWork Nos. 46, 66
6/2cRequired for the diversion of a footpath facilitating a private access track to Pond 3 and access to an existing maintenance track, plus the construction of various drainage ditchesWork Nos. 25, 46, 66
6/2eRequired for the diversion of a footpath and the creation of new access tracks, the construction of the proposed River Etherow bridge, the creation of a culvert to carry drainage ditch and the construction of various drainage ditchesWork Nos. 25, 35, 36, 46
6/2fRequired for the construction of the proposed River Etherow bridge, the construction of various drainage ditches and the establishment of environmental mitigation and enhancementWork Nos. 35, 46, 50
6/2hRequired for the construction of various drainage ditchesWork No. 46
6/2kRequired for the construction of the proposed River Etherow bridge and the construction of various drainage ditchesWork Nos. 35, 46
6/2mRequired for the construction of various drainage ditchesWork No. 46
6/2pRequired for the construction of an at grade signalised T-JunctionWork No. 27
6/2qRequired for the creation of a bridleway along the south side of A57 Link Road and road widening and resurfacingWork Nos. 26, 28
6/2rThe creation of a bridleway along the south side of A57 Link Road, the construction of an at grade signalised T-Junction and the construction of a new private accessWork Nos. 26, 27, 30
6/3aRequired for the construction of various drainage ditchesWork Nos. 46, 66
6/3dRequired for the diversion of a footpath and creation of an access trackWork No. 25
6/5Required for the construction of an at grade signalised T-Junction and the creation of controlled pedestrian/cycle crossingWork Nos. 27, 29
6/6Required for the construction of an at grade signalised T-Junction and the creation of controlled pedestrian/cycle crossingWork Nos. 27, 29
Land Plans – Sheet 7
7/1aRequired for the establishment of a construction compound and the undertaking of associated construction activitiesAll works
7/1cRequired for the establishment of a construction compound and the undertaking of associated construction activitiesAll works
Land Plans – Sheet 8
8/7aRequired for the creation of an earthwork screening bundWork No. 48
8/8aRequired for the creation of a footpath between the new Mottram Moor Junction and existing footpath, creation of a culvert to carry Tara Brook, the diversion of Tara Brook and the location of bat boxes installed on existing treesWork Nos. 21, 36, 45, 50
8/8dRequired for the creation of a footpath between the new Mottram Moor Junction and existing footpath and the diversion of Tara BrookWork Nos. 21, 45
Land Plans – Sheet 9
9/7aRequired for the realignment of Carrhouse Lane and the construction of various drainage ditchesWork Nos. 23, 46
9/7eRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainageWork No. 23
9/9aRequired for the realignment of Carrhouse Lane and the construction of various drainage ditches.Work Nos. 23, 46
9/16Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainageWork No. 23