PART 1PRELIMINARY
Interpretation2.
(1)
In this Order –
“address” includes any number or address used for the purposes of electronic transmission;
“the book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;
“building” includes any structure or erection or any part of a building, structure or erection;
“carriageway” has the same meaning as in the 1980 Act;
“electronic transmission” means a communication transmitted-
(a)
by means of an electronic communications network; or
(b)
by other means but while in electronic form,
“footway” has the same meaning as in the 1980 Act;
“highway” and “highway authority” have the same meaning as in the 1980 Act;
“the land plan” means the plan certified by the Secretary of State as the land plan for the purposes of this Order;
“maintain” includes inspect, repair, adjust, alter, remove, reconstruct and replace, and “maintenance” is to be construed accordingly;
“Network Rail” means Network Rail Infrastructure Limited (Company registration number 02904587) whose registered office is at 1 Eversholt Street, London NW1 2DN;
“the Order limits” means the limits of land to be acquired or used which are shown on the land plan and described in the book of reference;
“the planning permission” means the planning permission granted under the 1990 Act reference PA/18/01842/AS dated 2 April 2020 by Ashford Borough Council for a light maintenance depot facility and any variation or replacement of that planning permission;
“street” has the meaning given in section 48 (streets, street works and undertakers) of the 1991 Act and “street” includes part of a street;
“street authority” in relation to a street, has the same meaning as in Part 3 of the 1991 Act;
“stopping up plan” means the plan certified by the Secretary of State as the stopping up plan for the purposes of this Order;
“the tribunal” means the Lands Chamber of the Upper Tribunal; and
“the undertaking” means the railway undertaking of Network Rail as from time to time existing.
(2)
References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the air-space above its surface.
(3)
All measurements stated in any description of land in the book of reference are approximate.
(4)
References in this Order to numbered plots are references to plot numbers shown on the land plan.
(5)
References in this Order to hatched land are references to land shown hatched on the stopping up plan.