PART 2E+WPrincipal Powers

Limits of deviationE+W

4.  In the event that the undertaker carries out the overhead line modification as part of Work No.11B the undertaker may—

(a)deviate vertically from the levels of the existing 400kV overhead line from Walpole to Norwich Main to be modified as part of Work No.11B—

(i)to any extent not exceeding 4 metres upwards; or

(ii)to any extent downwards as may be found to be necessary or convenient.

(b)deviate laterally from the lines or situations of the existing 400kV overhead line from Walpole to Norwich Main to be modified as part of Work No.11B

(i)to any extent not exceeding 25 metres either side of the existing overhead line as shown by the limits of deviation relating to that work on the works plan.

Commencement Information

I1Art. 4 in force at 1.1.2022, see art. 1