(This note is not part of the Order)
This Order authorises EP Waste Management Limited (referred to in this Order as the undertaker) to construct, operate and maintain an energy from waste electricity generating station located on land at the South Humber Bank Power Station Site, South Marsh Road, near Stallingborough, Lincolnshire, fuelled by refuse derived fuels, with a capacity to process 753,500 tonnes of refuse derived fuel per annum, with a gross generation capacity of up to 95 megawatts at ISO conditions.
A copy of the Order plans and the book of reference mentioned in this Order and certified in accordance with article 25 of this Order (certification of plans, etc.) may be inspected free of charge during working hours at New Oxford House, George Street, Grimsby, North East Lincolnshire DN31 1HB.