In the District of North Lincolnshire,Rosper Road,Works to repair and resurface the access and to maintain visibility splays in the areas cross hatched in red and blue at the point marked C on sheet 1 of the access and rights of way plans,
In the District of North Lincolnshire,Rosper Road,Works to repair and resurface the access and to maintain visibility splays in the area cross hatched in red at the point marked A on sheet 1 of the access and rights of way plans,
In the District of North Lincolnshire,Rosper Road,Works for the installation and maintenance of Work No. 6 in the area cross hatched in blue at the point marked B on sheet 1 of the access and rights of way plans,

In the District of North Lincolnshire,Rosper Road,That part of the access in the area cross hatched in blue at the point marked C on sheet 1 of the access and rights of way plans,

In the District of North Lincolnshire,Rosper Road,That part of the access cross hatched in red at the point marked A on sheet 1 of the access and rights of way plans,
In the District of North Lincolnshire,Rosper Road,That part of the access cross hatched in red at the point marked C on sheet 1 of the access and rights of way plans,

In the District of North Lincolnshire,Rosper Road,Temporary closure of the part of the street cross hatched in blue at the point marked B on sheet 1 of the access and rights of way plans,

(a),To pass and repass on foot, with or without vehicles, plant and machinery,
(b),To construct, maintain, improve and protect access routes,
(c),To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve an underground and overground gas pipeline up to 600 millimetres (nominal internal diameter), control systems and cables and any other ancillary apparatus and any other works as necessary,
(d),To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve an overground electrical connection of up to 400 kilovolt, control systems and any other ancillary apparatus and any other works as necessary,
(e),To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve water pipes, connections, structures and ancillary equipment; telecommunications cables and equipment; compressed air connections and ancillary equipment; electrical cables, connections and ancillary equipment; control systems and cables; closed circuit television and security system connections; and any other ancillary apparatus and any other works as necessary,
(f),To retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve an underground gas pipeline, control systems and cables and any other ancillary apparatus and any other works as necessary,
(g),To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve water pipes, connections, structures and ancillary equipment and any other ancillary apparatus and any other works as necessary,
(h),To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve security fencing, gates, boundary treatment and any other ancillary apparatus and any other works as necessary,
(i),To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve gatehouses and weighbridges and any other ancillary apparatus and any other works as necessary,
(j),Restrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions which may obstruct, interrupt or interfere with the exercise of rights,

2,(a), (b), (h), (i) and (j),
6,(a) and (g),
7,(a) and (g),
8,(a), (b), (h), (i) and (j),
9,(a), (b), (h), (i) and (j),
10,(a), (b), (h), (i) and (j),
12,(a), (e) and (j),
14,(a), (e), (b), (h), (i) and (j),
15,(a), (b), (h), (i) and (j),
16,(a), (c) and (j),
17,(a), (d), (e), (c) and (j),
17a,(a), (d), (e), (c) and (j),
18,(a), (e) and (j),
20,(a), (b), (c), (h), (i) and (j),
21,(a), (b), (h), (i) and (j),
22,(a), (b), (e), (h), (i) and (j),
23,(a), (b), (c), (d), (e), (h), (i) and (j),
23a,(a), (b), (c), (d), (e), (h), (i) and (j),
24,(a), (d) and (j),
24a,(a), (d) and (j),
25,(a), (b), (h), (i) and (j),
26,(a), (b), (h), (i) and (j),
27,(a), (e) and (j),
28,(a), (b), (c), (e), (h), (i) and (j),
29,(a), (b), (c), (e), (h), (i) and (j),
30,(a), (b), (d), (h), (i) and (j),
30a,(a), (b), (d), (h), (i) and (j),
31,(a), (b), (h), (i) and (j),
32,(a), (e), (b), (h), (i) and (j),
34,(a), (b), (h), (i) and (j),
35,(a), (b), (c) (h), (i) and (j),
33, 37-111,(a) and (f),

01,Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6,
03,Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6,
04,Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6,
11,Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6,
13,Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6,
19,Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6,

access and rights of way plans,4.4,4 (sheets 1, 2 and 3) 5 (key plan and sheet 4),1 November 2019,
book of reference,3.5,4,1 November 2019,
supplemental book of reference,3.1a,1,26 February 2025,
commitments registers,6.4.32,1,April 2019,
environmental statement,Volume 1, 6.2 Volume 2, 6.3 Volume 3, 6.4,1 1 1,April 2019,
flood risk assessment,6.4.26,1,April 2019,
Framework biodiversity enhancement and management plan,6.4.17,1,April 2019,
Framework construction environmental management plan,6.4.3,1,April 2019,
framework construction traffic management plan,6.4.7,1,April 2019,
framework construction worker travel plan,6.4.6,1,April 2019,
framework written scheme of investigation,6.4.31,2,October 2019,
indicative lighting strategy,5.6,1,April 2019,
land plans,4.2,1 (sheets 1, 2 and 3) 2 (key plan and sheet 4) 3 (sheets 1, 2, 3 and 4, and inset sheet 1a),1 November 2019 (key plan and sheet 4) 27 March 2019 (sheets 1 and 3) 28 March 2019 (sheet 2) 3 March 2025 (sheet 2) 4 March 2025 (sheets 1, 3 and 4, and inset sheet 1a),
works plans,4.3,1 (sheets 1, 2 and 3) 4 (sheets 4, 5 and 6),April 2019 March 2025,
statement to inform appropriate assessment,7.17,2,October 2019,

Single gas turbine and generator,31,20,20,-,
Gas turbine building,50,35,29,-,
Exhaust stack,-,-,56,12,
Air intakes,24,16,40,-,
Fin-fan cooler,30,15,17,-,
Control room, workshops, stores,35,20,16,-,
Demineralised tank, firewater tank,-,-,32,24,