EXPLANATORY NOTE
(This note is not part of the Order)
This Order confers powers on Network Rail to stop up or downgrade the level crossings specified in Schedule 1 and for the temporary use of land in connection with the construction and maintenance of public rights of way where these are provided to replace the crossings.
The Order authorises the construction of works in connection with the closure of the level crossings, the extinguishment of existing public and private rights of way and the creation of alternative rights of way.
A copy of the deposited plans and the book of reference referred to in the Order may be inspected, on request, at the offices of Network Rail Infrastructure Limited at Network Rail National Records Centre, Unit 5, Audax Road, Clifton Moor, York YO30 4US.