The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017 Confirmation Instrument 2018

THE SCHEDULE TO THE SCHEME

PLANS AND SPECIFICATIONS OF THE CENTRE PARK LINK BRIDGE – WCPL

The location and general design of the bridge are shown on the plans numbered CPL-RAM-ZZ-01-DR-S-1001 Rev. D1.1 and CPL-RAM-ZZ-01-DR-S-1010 Rev. C1A and marked “The Warrington Borough Council (Construction of Warrington Waterfront – Centre Park Link Bridge) Scheme 2017”.

POINTS OF COMMENCEMENT AND TERMINATION

From a point on the North Bank of the River Mersey whose coordinates are 360248.01E, 386609.64N to a point on the South Bank whose coordinates are 360286.83E, 386580.55N. Ordnance survey Map reference SJ68.

SPAN

A single clear span of 45 metres.

WIDTH

16.95m width.

The bridge carries vehicular traffic, pedestrians and cyclists.

HEADWAY

The deck spans over the main channel, which is approximately 24 metres wide. There is a minimum headway/air draft of 2.35 metres, based on the proposed soffit level of 8.65m A.O.D and water level at mean high water springs (MHWS) of 6.30 metres. The River Mersey at this location is only tidal during spring tides. For the remainder of the year the River Mersey is fluvial, resulting in a headway/air draft of 4.65 metres based upon the proposed soffit level of 8.65 metres A.O.D and mean water level of 3.70 metres.

WATERWAY – THE RIVER MERSEY

The navigable channel at the bridge is 24m wide.