Location Plan,PDD-21497-2-OHL-1000,B,

Key Plan for Access, Rights of Way and Public Rights of Navigation Plans,PDD-21497-2-OHL-1141,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 1 of 18,PDD-21497-2-OHL-1142,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 2 of 18,PDD-21497-2-OHL-1143,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 3 of 18,PDD-21497-2-OHL-1144,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 4 of 18,PDD-21497-2-OHL-1145,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 5 of 18,PDD-21497-2-OHL-1146,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 6 of 18,PDD-21497-2-OHL-1147,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 7 of 18,PDD-21497-2-OHL-1148,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 8 of 18,PDD-21497-2-OHL-1149,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 9 of 18,PDD-21497-2-OHL-1150,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 10 of 18,PDD-21497-2-OHL-1151,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 11 of 18,PDD-21497-2-OHL-1152,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 12 of 18,PDD-21497-2-OHL-1153,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 13 of 18,PDD-21497-2-OHL-1154,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 14 of 18,PDD-21497-2-OHL-1155,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 15 of 18,PDD-21497-2-OHL-1156,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 16 of 18,PDD-21497-2-OHL-1157,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 17 of 18,PDD-21497-2-OHL-1158,B,
Access, Rights of Way and Public Rights of Navigation Plans – Sheet 18 of 18,PDD-21497-2-OHL-1159,B,
Access, Rights of Way and Public Rights of Navigation Plans – Plan A,PDD-21497-2-OHL-1160,B,
Access, Rights of Way and Public Rights of Navigation Plans – Plan B,PDD-21497-2-OHL-1110,B,

Drawing References for Design Drawings,PDD-21497-2-OHL-0058,D,
Maximum and Minimum Pylon Heights – Sheet 1 of 21,PDD-21497-2-OHL-0051,C,
Dimensions of Typical Poles and Pylons – Sheet 1A of 21,PDD-21497-2-OHL-0060,A,
Plan and Profile Drawing – Sheet 2 of 21,PDD-21497-2-OHL-0401,B,
Plan and Profile Drawing – Sheet 3 of 21,PDD-21497-2-OHL-0402,B,
Plan and Profile Drawing – Sheet 4L of 21,PDD-21497-2-OHL-0434,B,
Plan and Profile Drawing – Sheet 5 of 21,PDD-21497-2-OHL-0404,B,
Plan and Profile Drawing – Sheet 6 of 21,PDD-21497-2-OHL-0405,B,
Plan and Profile Drawing – Sheet 7 of 21,PDD-21497-2-OHL-0406,B,
Plan and Profile Drawing – Sheet 8 of 21,PDD-21497-2-OHL-0407,B,
Plan and Profile Drawing – Sheet 9 of 21,PDD-21497-2-OHL-0408,B,
Plan and Profile Drawing – Sheet 10 of 21,PDD-21497-2-OHL-0409,B,
Plan and Profile Drawing – Sheet 11 of 21,PDD-21497-2-OHL-0410,B,
Plan and Profile Drawing – Sheet 12 of 21,PDD-21497-2-OHL-0411,B,
Plan and Profile Drawing – Sheet 13 of 21,PDD-21497-2-OHL-0412,B,
Plan and Profile Drawing – Sheet 14 of 21,PDD-21497-2-OHL-0413,B,
Plan and Profile Drawing – Sheet 15 of 21,PDD-21497-2-OHL-0414,B,
Plan and Profile Drawing – Sheet 16 of 21,PDD-21497-2-OHL-0415,B,
Plan and Profile Drawing – Sheet 17 of 21,PDD-21497-2-OHL-0416,B,
Plan and Profile Drawing – Sheet 18 of 21,PDD-21497-2-OHL-0417,B,
Plan and Profile Drawing – Sheet 19 of 21,PDD-21497-2-OHL-0418,B,
Plan and Profile Drawing – Sheet 20 of 21,PDD-21497-2-OHL-0419,B,
Staking Table – Sheet 21 of 21,PDD-21497-2-OHL-0421,A,

Key Plan for Land Plans,PDD-21497-2-OHL-1021,B,
Drawing References for Land Plans,PDD-21497-2-OHL-0959,C,
Land Plans – Sheet 1 of 18,PDD-21497-2-OHL-0900,B,
Land Plans – Sheet 1A of 18,PDD-21497-2-OHL-0901,B,
Land Plans – Sheet 1B of 18,PDD-21497-2-OHL-0902,B,
Land Plans – Sheet 1C of 18,PDD-21497-2-OHL-0903,B,
Land Plans – Sheet 1D of 18,PDD-21497-2-OHL-0904,B,
Land Plans – Sheet 1E of 18,PDD-21497-2-OHL-0905,B,
Land Plans – Sheet 1F of 18,PDD-21497-2-OHL-0906,B,
Land Plans – Sheet 2 of 18,PDD-21497-2-OHL-0907,B,
Land Plans – Sheet 2A of 18,PDD-21497-2-OHL-0908,B,
Land Plans – Sheet 2B of 18,PDD-21497-2-OHL-0909,B,
Land Plans – Sheet 2C of 18,PDD-21497-2-OHL-0910,B,
Land Plans – Sheet 2D of 18,PDD-21497-2-OHL-0911,B,
Land Plans – Sheet 3 of 18,PDD-21497-2-OHL-0912,B,
Land Plans – Sheet 3A of 18,PDD-21497-2-OHL-0913,B,
Land Plans – Sheet 3B of 18,PDD-21497-2-OHL-0914,B,
Land Plans – Sheet 4 of 18,PDD-21497-2-OHL-0915,B,
Land Plans – Sheet 4A of 18,PDD-21497-2-OHL-0916,B,
Land Plans – Sheet 4B of 18,PDD-21497-2-OHL-0917,B,
Land Plans – Sheet 5 of 18,PDD-21497-2-OHL-0918,B,
Land Plans – Sheet 5A of 18,PDD-21497-2-OHL-0919,B,
Land Plans – Sheet 5B of 18,PDD-21497-2-OHL-0920,B,
Land Plans – Sheet 5C of 18,PDD-21497-2-OHL-0921,B,
Land Plans – Sheet 5D of 18,PDD-21497-2-OHL-0922,B,
Land Plans – Sheet 6 of 18,PDD-21497-2-OHL-0923,B,
Land Plans – Sheet 7 of 18,PDD-21497-2-OHL-0924,B,
Land Plans – Sheet 7A of 18,PDD-21497-2-OHL-0925,B,
Land Plans – Sheet 7B of 18,PDD-21497-2-OHL-0926,B,
Land Plans – Sheet 7C of 18,PDD-21497-2-OHL-0927,B,
Land Plans – Sheet 8 of 18,PDD-21497-2-OHL-0928,B,
Land Plans – Sheet 8A of 18,PDD-21497-2-OHL-0929,B,
Land Plans – Sheet 8B of 18,PDD-21497-2-OHL-0930,B,
Land Plans – Sheet 8C of 18,PDD-21497-2-OHL-0931,B,
Land Plans – Sheet 9 of 18,PDD-21497-2-OHL-0932,B,
Land Plans – Sheet 9A of 18,PDD-21497-2-OHL-0933,B,
Land Plans – Sheet 10 of 18,PDD-21497-2-OHL-0934,B,
Land Plans – Sheet 10A of 18,PDD-21497-2-OHL-0935,B,
Land Plans – Sheet 10B of 18,PDD-21497-2-OHL-0936,B,
Land Plans – Sheet 10C of 18,PDD-21497-2-OHL-0937,B,
Land Plans – Sheet 10D of 18,PDD-21497-2-OHL-0938,B,
Land Plans – Sheet 11 of 18,PDD-21497-2-OHL-0939,B,
Land Plans – Sheet 11A of 18,PDD-21497-2-OHL-0940,B,
Land Plans – Sheet 11B of 18,PDD-21497-2-OHL-0941,B,
Land Plans – Sheet 11C of 18,PDD-21497-2-OHL-0942,B,
Land Plans – Sheet 11D of 18,PDD-21497-2-OHL-0943,B,
Land Plans – Sheet 12 of 18,PDD-21497-2-OHL-0944,B,
Land Plans – Sheet 12A of 18,PDD-21497-2-OHL-0945,B,
Land Plans – Sheet 12B of 18,PDD-21497-2-OHL-0946,B,
Land Plans – Sheet 12C of 18,PDD-21497-2-OHL-0947,B,
Land Plans – Sheet 13 of 18,PDD-21497-2-OHL-0948,B,
Land Plans – Sheet 14 of 18,PDD-21497-2-OHL-0949,B,
Land Plans – Sheet 15 of 18,PDD-21497-2-OHL-0950,B,
Land Plans – Sheet 15A of 18,PDD-21497-2-OHL-0951,B,
Land Plans – Sheet 15B of 18,PDD-21497-2-OHL-0952,B,
Land Plans – Sheet 16 of 18,PDD-21497-2-OHL-0953,B,
Land Plans – Sheet 16A of 18,PDD-21497-2-OHL-0954,B,
Land Plans – Sheet 17 of 18,PDD-21497-2-OHL-0955,D,
Land Plans – Sheet 17A of 18,PDD-21497-2-OHL-0956,C,
Land Plans – Sheet 17B of 18,PDD-21497-2-OHL-0957,B,
Land Plans – Sheet 18 of 18,PDD-21497-2-OHL-0958,B,

Key Plan for Special Category Land Plans &amp; Crown Land Plans,PDD-21497-2-OHL-1061,C,
Special Category Land Plans &amp; Crown Land Plans – Sheet 1 of 18,PDD-21497-2-OHL-1062,C,
Special Category Land Plans &amp; Crown Land Plans – Sheet 2 of 18,PDD-21497-2-OHL-1063,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 3 of 18,PDD-21497-2-OHL-1064,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 4 of 18,PDD-21497-2-OHL-1065,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 5 of 18,PDD-21497-2-OHL-1066,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 6 of 18,PDD-21497-2-OHL-1067,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 7 of 18,PDD-21497-2-OHL-1068,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 8 of 18,PDD-21497-2-OHL-1069,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 9 of 18,PDD-21497-2-OHL-1070,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 10 of 18,PDD-21497-2-OHL-1071,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 11 of 18,PDD-21497-2-OHL-1072,C,
Special Category Land Plans &amp; Crown Land Plans – Sheet 12 of 18,PDD-21497-2-OHL-1073,C,
Special Category Land Plans &amp; Crown Land Plans – Sheet 13 of 18,PDD-21497-2-OHL-1074,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 14 of 18,PDD-21497-2-OHL-1075,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 15 of 18,PDD-21497-2-OHL-1076,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 16 of 18,PDD-21497-2-OHL-1077,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 17 of 18,PDD-21497-2-OHL-1078,B,
Special Category Land Plans &amp; Crown Land Plans – Sheet 18 of 18,PDD-21497-2-OHL-1079,B,

Key Plan for Extinguishment of Easements, Servitudes and Other Rights Plans,PDD-21497-2-OHL-1081,B,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 1 of 18,PDD-21497-2-OHL-1082,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 2 of 18,PDD-21497-2-OHL-1083,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 3 of 18,PDD-21497-2-OHL-1084,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 4 of 18,PDD-21497-2-OHL-1085,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 5 of 18,PDD-21497-2-OHL-1086,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 6 of 18,PDD-21497-2-OHL-1087,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 7 of 18,PDD-21497-2-OHL-1088,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 8 of 18,PDD-21497-2-OHL-1089,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 9 of 18,PDD-21497-2-OHL-1090,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 10 of 18,PDD-21497-2-OHL-1091,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 11 of 18,PDD-21497-2-OHL-1092,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 12 of 18,PDD-21497-2-OHL-1093,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 13 of 18,PDD-21497-2-OHL-1094,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 14 of 18,PDD-21497-2-OHL-1095,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 15 of 18,PDD-21497-2-OHL-1096,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 16 of 18,PDD-21497-2-OHL-1097,A,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 17 of 18,PDD-21497-2-OHL-1098,B,
Extinguishment of Easements, Servitudes and Other Rights Plans – Sheet 18 of 18,PDD-21497-2-OHL-1099,A,

Key Plan for Traffic Regulation Order Plans,PDD-21497-2-OHL-1250,A,
Traffic Regulation Order Plans – Sheet 1 of 18,PDD-21497-2-OHL-1251,A,
Traffic Regulation Order Plans – Sheet 2 of 18,PDD-21497-2-OHL-1252,A,
Traffic Regulation Order Plans – Sheet 3 of 18,PDD-21497-2-OHL-1253,A,
Traffic Regulation Order Plans – Sheet 4 of 18,PDD-21497-2-OHL-1254,A,
Traffic Regulation Order Plans – Sheet 5 of 18,PDD-21497-2-OHL-1255,A,
Traffic Regulation Order Plans – Sheet 6 of 18,PDD-21497-2-OHL-1256,A,
Traffic Regulation Order Plans – Sheet 7 of 18,PDD-21497-2-OHL-1257,A,
Traffic Regulation Order Plans – Sheet 8 of 18,PDD-21497-2-OHL-1258,A,
Traffic Regulation Order Plans – Sheet 9 of 18,PDD-21497-2-OHL-1259,A,
Traffic Regulation Order Plans – Sheet 10 of 18,PDD-21497-2-OHL-1260,A,
Traffic Regulation Order Plans – Sheet 11 of 18,PDD-21497-2-OHL-1261,A,
Traffic Regulation Order Plans – Sheet 12 of 18,PDD-21497-2-OHL-1262,A,
Traffic Regulation Order Plans – Sheet 13 of 18,PDD-21497-2-OHL-1263,A,
Traffic Regulation Order Plans – Sheet 14 of 18,PDD-21497-2-OHL-1264,A,
Traffic Regulation Order Plans – Sheet 15 of 18,PDD-21497-2-OHL-1265,A,
Traffic Regulation Order Plans – Sheet 16 of 18,PDD-21497-2-OHL-1266,A,
Traffic Regulation Order Plans – Sheet 17 of 18,PDD-21497-2-OHL-1267,A,
Traffic Regulation Order Plans – Sheet 18 of 18,PDD-21497-2-OHL-1268,A,

Key Plan for Trees and Hedgerows to be Removed or Managed Plans,PDD-21497-2-OHL-1161,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 1 of 18,PDD-21497-2-OHL-1162,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 2 of 18,PDD-21497-2-OHL-1163,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 3 of 18,PDD-21497-2-OHL-1164,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 4 of 18,PDD-21497-2-OHL-1165,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 5 of 18,PDD-21497-2-OHL-1166,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 6 of 18,PDD-21497-2-OHL-1167,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 7 of 18,PDD-21497-2-OHL-1168,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 8 of 18,PDD-21497-2-OHL-1169,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 9 of 18,PDD-21497-2-OHL-1170,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 10 of 18,PDD-21497-2-OHL-1171,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 11 of 18,PDD-21497-2-OHL-1172,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 12 of 18,PDD-21497-2-OHL-1173,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 13 of 18,PDD-21497-2-OHL-1174,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 14 of 18,PDD-21497-2-OHL-1175,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 15 of 18,PDD-21497-2-OHL-1176,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 16 of 18,PDD-21497-2-OHL-1177,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 17 of 18,PDD-21497-2-OHL-1178,B,
Trees and Hedgerows to be Removed or Managed Plans – Sheet 18 of 18,PDD-21497-2-OHL-1179,B,

Key Plan for Works Plans,PDD-21497-2-OHL-1121,B,
Works Plans – Sheet 1 of 18,PDD-21497-2-OHL-1122,B,
Works Plans – Sheet 2 of 18,PDD-21497-2-OHL-1123,B,
Works Plans – Sheet 3 of 18,PDD-21497-2-OHL-1124,B,
Works Plans – Sheet 4 of 18,PDD-21497-2-OHL-1125,B,
Works Plans – Sheet 5 of 18,PDD-21497-2-OHL-1126,B,
Works Plans – Sheet 6 of 18,PDD-21497-2-OHL-1127,B,
Works Plans – Sheet 7 of 18,PDD-21497-2-OHL-1128,B,
Works Plans – Sheet 8 of 18,PDD-21497-2-OHL-1129,B,
Works Plans – Sheet 9 of 18,PDD-21497-2-OHL-1130,B,
Works Plans – Sheet 10 of 18,PDD-21497-2-OHL-1131,B,
Works Plans – Sheet 11 of 18,PDD-21497-2-OHL-1132,B,
Works Plans – Sheet 12 of 18,PDD-21497-2-OHL-1133,B,
Works Plans – Sheet 13 of 18,PDD-21497-2-OHL-1134,B,
Works Plans – Sheet 14 of 18,PDD-21497-2-OHL-1135,B,
Works Plans – Sheet 15 of 18,PDD-21497-2-OHL-1136,B,
Works Plans – Sheet 16 of 18,PDD-21497-2-OHL-1137,B,
Works Plans – Sheet 17 of 18,PDD-21497-2-OHL-1138,B,
Works Plans – Sheet 18 of 18,PDD-21497-2-OHL-1139,B,


Canterbury City Council,Broad Oak Road,
Canterbury City Council,Vauxhall Road,
Canterbury City Council,Shalloak Road,
Canterbury City Council,Viridor Business Park,
Canterbury City Council,Mayton Lane,
Canterbury City Council,Barnets Lane,
Canterbury City Council,A291 (Herne Bay Road),
Canterbury City Council,Hoath Road,
Canterbury City Council,Bredlands Lane,
Canterbury City Council,Vauxhall Road, Broad Oak Road and Shalloak Road,
Canterbury City Council,Herne Bay Road,
Canterbury City Council,Hoath Road and Bredlands Road,
Canterbury City Council,Nethergong Hill and Sandpit Hill,
Canterbury City Council,Old Road, Sarre,
Canterbury City Council/ Thanet District Council,A28 (Island Road),
Thanet District Council,A253 (Ramsgate Road/Mile Road),
Thanet District Council,Gore Street,
Dover District Council,A256 (Ramsgate Road),


Broad Oak Road,At BM01, BM02 and BM05 (as shown on Sheet 1) the creation of three temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Vauxhall Road,At BM03 and BM04 (as shown on Sheet 1) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Shalloak Road,At BM06, BM08, BM09, BM10, BM11 and BM12 (as shown on Sheet 2) the creation of six temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Broad Oak Road,At BM07 (as shown on Sheet 2) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Mayton Lane,At BM13 (as shown on Sheet 3) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Barnets Lane,At BM14 and BM15 (as shown on Sheet 3) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
A291 Herne Bay Road,At BM16, BM17, BM18, BM19, BM20 and BM21 (as shown on Sheet 2 and Sheet 3) the creation of six temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Hoath Road,At BM22 (as shown on Sheet 4) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Bredlands Lane,At BM23 and BM24 (as shown on Sheet 4) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Chislet Park Access (A28),At BM25 and BM26 (as shown on Sheet 7) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
A28 Island Road,At BM27, BM30, BM32 (as shown on Sheet 7 and Sheet 10) the creation of three temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Sandpit Hill,At BM28 and BM29 (as shown on Sheet 8) the creation of two temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Old Road,At BM31 (as shown on Sheet 10) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
Westbere Compound,At BM39 (as shown on Sheet 4) entrance of existing bellmouth will be widened to allow HGV access and egress. Comprising the installation of a new road surface, white lining, kerbing and suitable drainage system where required.,


A253 Ramsgate Road/Mile Road,At BM33 (as shown on Sheet 11) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,
A253 via Gore Street,At BM34, BM35, BM36 and BM37 (as shown on Sheet 11) the creation of four temporary bellmouths to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,


A256,At BM38 (as shown on Sheet 17) the creation of one temporary bellmouth to enable access/egress with sufficient size to accommodate a HGV vehicle. Comprising the installation of a new road surface, white lining, kerbing and a suitable drainage system, where required.,


Canterbury City Council,CC16,Between points RW1 and RW2 as shown on Sheet 1.,Between points RWD1 and RWD2 via RWD3, RWD4 and RWD5 as shown on Sheet 1 &amp; Plan A.,
Canterbury City Council,CB47A,Between points RW3 and RW4 as shown on Sheet 1.,Between points RWD6 and RWD12 via RWD7, RWD8, RWD9, RWD10 and RWD11 as shown on Sheet 1.,
Canterbury City Council,Farleigh Road,Between points ST1.1 and ST1.2 as shown on Sheet 1.,Diversion Route from Point DV1.1 to DV1.6 via DV1.2, DV1.3, DV1.4 and DV1.5 as shown on Sheet 1 and Plan A.,
Canterbury City Council,Vauxhall Road,Between points ST2.1 and ST2.2 as shown on Sheet 1.,Diversion Route from Point DV2.1 to DV2.4 via DV2.2 and DV2.3 as shown on Sheet 1 and Plan A.,
Canterbury City Council,CB51,Between points RW5 and RW6 as shown on Sheets 1 and 2.,Between points RWD13 and RWD17 via RWD14, RWD15 and RWD16 as shown on Sheets 1 and 2.,
Canterbury City Council,Shalloak Road,Between points ST3.1, ST3.2, ST3.3, and ST3.4 as shown on Sheets 1, 2 and 3.,Diversion Route from Point DV3.1 to DV3.4 via DV3.2 and DV3.3 as shown on Sheets 1, 2 and 3.,
Canterbury City Council,CB48,Between points RW6 and RW7 as shown on Sheet 2.,Between points RWD17 and RWD16 via RWD18, RWD19, RWD13, RWD14 and RWD15 as shown on Sheets 1 and 2.,
Canterbury City Council,CB64,Between points RW8 and RW9 as shown on Sheets 1 and 2.,Between points RWD13 and RWD14 via RWD19, RWD18, RWD17, RWD16, RWD15 and RWD14 as shown on Sheets 1 and 2.,
Canterbury City Council,CB60,Between points RW10 and RW11 as shown on Sheet 2.,Between points RWD20 and RWD15 via RWD21 as shown on Sheet 2.,
Canterbury City Council,CB44/CB46,Between points RW12 and RW13 as shown on Sheet 2 and Plan A.,Between points RWD22 and RWD26 via RWD23, RWD24 and RWD25 as shown on Sheets 2, 3 and Plan A.,
Canterbury City Council,Herne Bay Road,Between points ST4.1, ST4.1A, ST4.2 and ST4.3 as shown on Sheets 2, 3 and Plan A.,Diversion Route from Point DV4.1 to DV4.3 via DV4.2, Rheims Way, St Peters Place, A290 and A293 as shown on Sheet 2.,
Canterbury Council and Thanet District Council,A28 Island Road,Between points ST5.1, ST5.1A, ST5.1B, ST5.1C, ST5.1D, ST5.1E, ST5.1F and ST5.2 as shown on Sheets 2, 4, 5, 7 – 10 and Plan A and Plan B.,Diversion Route from Point DV5.1 to DV5.3 via DV5.2, A293 and A28 as shown on Sheets 2, 3, 10, 11 and Plan A and Plan B.,
Canterbury City Council,CB71,Between points RW14 and RW15 as shown on Sheet 3.,Between points RWD27 and RWD30 via RWD28 and RWD29 as shown on Sheet 3.,
Canterbury City Council,CB80,Between points RW16 and RW17 as shown on sheet 3 of the access and rights of way plans.,Between points RWD31 and RWD35 via RWD32, RWD33 and RWD34 as shown on sheet 3 of the access and rights of way plans.,
Canterbury City Council,CB73,Between points RW18 and RW19 as shown on Sheets 2 and 3.,Between points RWD36 and RWD37 as shown on Sheets 2 and 3.,
Canterbury City Council,CB59,Between points RW20 and RW21 as shown on Sheet 2,Between points RWD38 and RWD40 via RWD39 as shown on Sheet 2.,
Canterbury City Council,CB58,Between points RW22, RW22A and RW23 as shown on Sheets 3 and 4.,Between points RWD41 and RWD43 via RWD38, RWD39, RWD40 and RWD42 as shown on Sheets 2, 3 and 4.,
Canterbury City Council,Bredlands Lane,Between points ST7.1, and ST7.2 as shown on Sheet 4.,Diversion Route from Point DV7.1 to DV7.2 via DV7.3 as shown on Sheet 4 and Plan A.,
Canterbury City Council,Hoath Road,Between points ST6.1, ST6.2 and ST6.3 as shown on Sheet 4 and Plan A.,Diversion Route from Point DV6.1 to DV6.9 via DV6.2, DV6.2A, DV6.2B, DV6.2C, DV6.3, DV6.4, DV6.5, DV6.6, DV6.7, Mill Road and DV6.8, DV6.8A as shown on Sheets 4, 5, 6, 7, 8 and Plan A and Plan B.,
Canterbury City Council,Hoath Road,Between points ST6.1, and ST6.2 shown on Sheets 4, 6 and Plan A and Plan B.,Diversion Route from Point DV6.1 to DV6.2 via DV6.3 as shown on Sheet 4 and Plan A.,
Canterbury City Council,CB100,Between points RW24 and RW25 as shown on Sheet 7.,Between points RWD44 and RWD48 via RWD45, RWD46 and RWD47 as shown on Sheets 7 and 8.,
Canterbury City Council,CB100A,Between points RW25 and RW26 as shown on Sheet 6.,Between points RWD48 and RWD53 via RWD49, RWD50, RWD51 and RWD52 as shown on Sheet 6 and Plan A and Plan B.,
Canterbury City Council,CB119,Between points RW25 and RW27 as shown on Sheets 7 and 8.,Between points RWD48 and RWD47 via RWD44, RWD45 and RWD46 as shown on Sheets 7 and 8.,
Canterbury City Council,Sandpit Hill,Between points ST8.1, ST8.2, and ST8.3 as shown on Sheet 8 and Plan A and Plan B of the access and rights of way plans.,Diversion Route from Point DV8.1 to DV8.7 via DV8.1A, DV8.1B, DV8.2, DV8.3, DV8.3A, DV8.4, DV8.4A, DV8.5, Max Mill Lane and DV8.6 as shown on Sheets 4, 6 – 8 and Plan A and Plan B.,
Canterbury City Council,CB101,Between points RW28 and RW29 as shown on Sheet 6.,Between points RWD49 and RWD51 via RWD48, RWD53, RWD52 and RWD51 as shown on Sheet 6.,
Canterbury City Council,CB118,Between points RW27 and RW30 as shown on Sheet 8.,Between points RWD47 and RWD46 via RWD48, RWD44, and RWD45 as shown on Sheets 7 and 8.,
Canterbury City Council,CB117,Between points RW30 and RW31 as shown on Sheet 7.,Between points RWD46 and RWD45 via RWD54 as shown on Sheet 7.,
Canterbury City Council,CB118 (2nd Diversion),Between points RW30 and RW32 as shown on Sheets 7 and 8 and Plan A and Plan B.,Between points RWD46 and RWD54 via RWD45 as shown on Sheet 7.,
Canterbury City Council,CB123,Between points RW33 and RW34 as shown on Sheet 8.,Between points RWD 58 and RWD59 via RWD57 and RWD 56 as shown on Sheet 8 and Plan A and Plan B.,
Canterbury City Council,CB124,Between points RW35 and RW36 as shown on Sheet 8.,Between points RWD60 and RWD62 via RWD55 and RWD61 as shown on Sheet 8 and Plan A and Plan B.,
Canterbury City Council,CB128,Between points RW36 and RW37 as shown on Sheets 8 and 9 and Plan A and Plan B.,Between points RWD62 and RWD61 via RWD60 and RWD58 as shown on Sheets 8 and 9 and Plan A and Plan B.,
Canterbury City Council,CB125,Between points RW38 and RW39 as shown on Sheet 9.,Between points RWD63 and RWD64 via RWD61 and RWD62 as shown on Sheets 8 and 9 and Plan A and Plan B.,
Thanet District Council,TE24,Between points RW41 and RW42 as shown on Sheets 11 and 12.,Between points RWD65 and RWD67 via RWD65A, RWD66 and RWD66A as shown on Sheets 11, 12 and 13 and Plan A and Plan B.,
Canterbury City Council, Thanet District Council &amp; Dover District Council,Gore Street,Between points ST9.1, ST9.2, and ST9.3 as shown on Sheet 11 and Plan A and Plan B.,Diversion Route from Point DV9.1 to DV9.5 via Stourmouth Road, Grove Road, Grove Ferry Road, DV9.2, DV9.3, DV9.3A and DV9.4 as shown on Sheets 9, 10 and 11 and Plan A and Plan B.,
Thanet District Council,TE23,Between points RW42, RW42A and RW43 as shown on Sheets 12 and 13 and Plan B.,Between points RWD66 and RWD67 via RWD65 as shown on Sheets 11 and 12 and Plan A and Plan B.,
Thanet District Council,TE32,Between points RW44, RW44A and RW45 as shown on Sheets 13 and 14.,Between points RWD68 and RWD73 via RWD69, RWD70, RWD71, RWD72 and RWD73A as shown on Sheets 13, 14 and 15 and Plan B.,
Thanet District Council,TE26,Between points RW44 and RW46 as shown on Sheets 13 and 15.,Between points RWD69 and RWD68 via RWD70, RWD71, RWD72 and RWD73 as shown on Sheets 13, 14 and 15 and Plan B.,
Dover District,EE42,Between points RW47, RW47A, RW47B and RW48 as shown on Sheets 15 to 18 and Plan B.,Between points RWD74 and RWD82 via RWD75, RWD76, RWD77, RWD78, RWD79, RWD80 and RWD81 as shown on Sheets 13 and 15 and Plan B.,


Canterbury City Council,CB114,Between points RW39 and RW40 as shown on Sheet 9.,
Canterbury City Council,Mayton Lane,Between points ST10.1, ST10.2, and ST10.3 as shown on Sheet 3.,
Canterbury City Council,Barnets Lane,Between points ST11.1 and ST11.2 as shown on Sheet 3.,


Canterbury City Council,1,2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 139, 140, 142, 146, 147, 148, 149, 150, 151, 284b, 285, 292, 294, 298, 300, 305a, 468, 474, 475, 476, 479, 480, 481, 482, 483, 484, 489, 491, 492, 493, 494, 496, 497, 498, 499, 500, 503, 506, 508, 509, 510, 514, 515, 517, 519, 521, 523, 526, 527, 528, 529, 530, 533, 536, 547, 548, 553, 598, 602, 603, 609, 622, 625, 626, 631, 641, 652, 665, 686, 688, 689, 690, 692, 694, 698, 701, 703, 706, 734, 756, 757, 766, 770, 783, 784, 786, 792, 795, 796, 811, 840, 851, 862, 867, 885, 896, 903, 905, 906, 909, 924, 926, 927, 928, 934, 935, 948, 951, 952, 961, 962, 964, 965, 971, 972, 973, 974, 975, 980, 982, 983, 984, 985, 987, 989, 990, 991, 995, 996, 1000, 1006, 1011, 1023, 1025, 1430, 1434, 1040, 1045, 1046 &amp; 1049,
Canterbury City Council and Thanet District Council,1046,
Thanet District Council,1053, 1060, 1069, 1088, 1102, 1118, 1121, 1123, 1124, 1127, 1133, 1146, 1147, 1148, 1151, 1153, 1159, 1161, 1162, 1167, 1169, 1173, 1176, 1177, 1178, 1179, 1181, 1182, 1183, 1186, 1187, 1188, 1189, 1190, 1194, 1195, 1199, 1201, 1204, 1205, 1214, 1225, 1226, 1230, 1239, 1272, 1276, 1277, 1279, 1300, 1306, 1310, 1317, 1329, 1332, 1341, 1343, 1344, 1346, 1355, 1356, 1357, 1364, 1391, 1395, 1401, 1407, 1408, 1415, 1422, 1425, 1429 &amp; 1649,
Thanet District Council and Dover District Council,1392, 1439, 1635, 1636 &amp; 1654,
Dover District Council,1448, 1471, 1487, 1488, 1489, 1495, 1496, 1505, 1508, 1511, 1531, 1539, 1540, 1544, 1549, 1555, 1558, 1561, 1563, 1566, 1573, 1575, 1588, 1589A, 1589B, 1589C, 1589D, 1656, 1658, 1661, 1663 &amp; 1668,


Canterbury City Council,1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 139, 140, 142, 146, 147, 148, 149, 150, 151, 284b, 285, 286, 287, 288, 291, 292, 294, 298, 300, 305a, 468, 474, 475, 476, 479, 480, 481, 482, 483, 484, 489, 491, 492, 493, 494, 496, 497, 498, 499, 500, 503, 506, 508, 509, 510, 514, 515, 517, 519, 521, 523, 526, 527, 528, 529, 530, 533, 536, 547, 548, 553, 598, 602, 603, 609, 622, 625, 626, 631, 641, 652, 665, 686, 687, 688, 689, 690, 692, 694, 698, 701, 703, 706, 734, 756, 757, 766, 770, 783, 784, 786, 792, 795, 796, 811, 840, 851, 858, 862, 867, 875, 885, 896, 903, 905, 906, 909, 919, 924, 925, 926, 927, 928, 934, 935, 936, 937, 946, 947, 948, 949, 951, 952, 955, 961, 962, 963, 964, 965, 969, 970, 971, 972, 973, 974, 975, 980, 982, 983, 984, 985, 987, 988, 989, 990, 991, 995, 996, 1000, 1006, 1011, 1023, 1025, 1027, 1040, 1044, 1045, 1049, 1431 &amp; 1434,
Canterbury City Council and Thanet District Council,1046,
Thanet District Council,1053, 1060, 1069, 1086, 1088, 1102, 1118, 1121, 1123, 1124, 1127, 1133, 1146, 1147, 1148, 1151, 1153, 1159, 1161, 1162, 1166B, 1167, 1169, 1170, 1172, 1173, 1175, 1177, 1178, 1179, 1180, 1181, 1182, 1183, 1188, 1189, 1190, 1191, 1192, 1194, 1195, 1200, 1201, 1205, 1210, 1213, 1214, 1215, 1224, 1225, 1230, 1272, 1276, 1277, 1279, 1300, 1305, 1306, 1310, 1317, 1329, 1332, 1341, 1343, 1344, 1346, 1355, 1356, 1357, 1358, 1364, 1391, 1392, 1395, 1401, 1407, 1408, 1415, 1417, 1421, 1422, 1425, 1429 &amp; 1649,
Thanet District Council and Dover District Council,1439, 1635, 1636 &amp; 1654,
Dover District Council,1430, 1448, 1453, 1471, 1487, 1488, 1489, 1495, 1496, 1505, 1508, 1511, 1519, 1523, 1531, 1539, 1540, 1544, 1547, 1549, 1555, 1558, 1559, 1561, 1563, 1564, 1566, 1573, 1575, 1588, 1589A, 1589B, 1589C, 1589D, 1656, 1658, 1661, 1663, 1664 &amp; 1668,


1,Dismantling of redundant infrastructure,6A,Pylon PX1,
2, 3, 4, 5, 6, 8, 9, 10, 12, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96 ,97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 115, 116, 117, 118, 119, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 139, 140 &amp; 142,Dismantling of redundant infrastructure,6A,,
7, 38, 114 &amp; 137,Dismantling of redundant infrastructure,6A,Removal of pylon foundations only to a depth of 1.5 metres,
11, 13, 14, 15, 16, 138, 141, 143, 237, 238, 239, 240, 241, 244, 245, 246, 247, 249, 250, 252 &amp; 253,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6A,,
144 &amp; 243,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 6A and 6B,,
145, 461, 555, 556, 561, 562, 565, 568, 569, 570, 572, 573, 575, 578, 579, 588, 589, 590, 596, 600, 620, 623, 713, 715, 716, 717, 719 &amp; 879,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6B,,
146, 147 &amp; 734,Dismantling of redundant infrastructure,1 and 6B,Removal of pylon foundations only to a depth of 1.5 metres,
148, 484, 489, 491, 492, 493, 494, 496, 497, 499, 500, 506, 508, 509, 510, 514, 515, 517, 519, 521, 523, 529, 530, 533, 547, 548, 598, 602, 603, 622, 686, 688, 689, 690, 692, 694, 698, 701, 703, 756, 757, 783, 784, 786, 795, 796, 896 &amp; 903,Dismantling of redundant infrastructure,6B,,
149 &amp; 298,Construction of authorised development and mitigation works,1, 4A and 6B,Removal of pylon foundations only to a depth of 1.5 metres,
150, 151, 284B, 285, 292, 294, 301, 303, 305A &amp; 488A,Construction of authorised development and mitigation works,1, 4A and 6B,,
152, 153, 154, 191, 192, 200, 206, 207, 212, 216, 217, 218, 228, 229, 230, 254, 265, 266, 267, 281, 282, 295, 296, 322, 324, 327, 353, 354, 355, 379, 380, 381, 382, 383, 385, 394, 396, 397, 398, 399, 400, 401, 405, 406, 419 421, 423, 424, 425, 426, 427, 428, 429,430, 431, 463, 464, 465, 466, 615, 629, 638, 709, 720, 739, 741, 742, 743, 744, 771, 772, 773, 778, 779, 780, 781, 814, 818, 825, 829, 830, 831, 833, 834, 841, 881, 886, 887, 1008, 1013, 1024, 1026 &amp; 1058,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1,,
157, 158, 160, 163, 164, 169, 170, 174, 178, 179, 184, 185, 188, 190, 196, 197, 198, 201, 205, 213, 214, 215, 222, 223, 224, 225, 231, 233, 234, 235, 236, 248, 256, 257, 258, 259, 262, 263, 264, 270, 271, 274, 275, 284A, 290, 299, 305B, 307, 308, 309, 321, 325, 326, 332, 333, 334, 335, 336, 337, 338, 339, 340, 341, 345, 346, 348, 349, 350, 351, 357, 358, 361, 362, 363, 364, 365, 366, 367, 368, 370, 371, 372, 373, 374, 375, 377, 378, 387, 388, 389, 390, 395, 407, 408, 409, 412, 414, 415, 417, 418, 420, 422, 434, 436, 437, 438, 440, 442, 443, 444, 445, 447, 448, 453, 454, 455, 456, 458, 459, 552, 577, 591, 592, 607, 608, 610, 639, 642, 644, 645, 646, 647, 651, 654, 656, 658, 659, 660, 661, 668, 673, 710, 714, 721, 722, 723, 725, 726, 730, 731, 732, 733, 735, 736, 737, 745, 750, 751, 759, 760, 761, 762, 775, 785, 787, 788, 800, 801, 803, 806, 808, 809, 810a, 812, 815, 816, 817, 832, 835, 836, 837, 839, 854, 855, 861, 884, 889, 890, 891, 893, 894, 895, 899, 900, 901, 904, 914, 916, 918, 920, 922, 923, 930, 932, 933, 939, 940, 941, 942, 943, 944, 945, 957, 958, 994, 1007 &amp; 1055,Construction of authorised development and mitigation works,1,,
300, 551 &amp; 612,Construction of authorised development and mitigation works,1 and 6B,,
467 &amp; 478,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 4A and 6B,,
468, 474, 475, 476, 480, 481, 482 &amp; 483,Dismantling of redundant infrastructure,4A and 6B,,
469, 470, 471, 472, 473 &amp; 488B,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,4A and 6B,,
477, 485, 486, 487, 490, 495, 501, 502, 504, 505, 507, 511, 512, 513, 516, 518, 520, 522, 524, 525, 531, 532, 534, 535, 537, 546, 549, 550, 554, 593, 595, 599, 601, 604, 605, 606, 611, 635, 637, 643, 649, 653, 657, 662, 667, 669. 675, 676, 684, 693, 695, 699, 702, 704, 707, 711, 712, 718, 724, 738, 749, 752, 753, 758, 764, 767, 769, 782, 789, 794, 797, 798, 799, 807, 820, 838, 844, 849, 853, 857, 863, 864, 866, 868, 869, 871, 873, 876 &amp; 880,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6B,,
479,Dismantling of redundant infrastructure,1, 4A and 6B,,
498, 503, 526, 527, 528, 536, 553, 609, 620, 626, 631, 641, 652, 665, 706, 766, 770, 792, 811, 840, 851, 862, 867 &amp; 885,Dismantling of redundant infrastructure,6B,Removal of pylon foundations only to a depth of 1.5 metres,
538, 540 &amp; 545,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,2,,
539, 541, 542, 543 &amp; 544,Construction of authorised development and mitigation works,2,,
905 &amp; 906,Dismantling of redundant infrastructure,4B and 6C,,
909 &amp; 961,Construction of authorised development and mitigation works,1, 4B, 6C and 6B,Removal of pylon foundations only to a depth of 1.5 metres,
924, 926, 927, 928, 934, 935, 948, 951, 952, 965, 971 &amp; 973,Construction of authorised development and mitigation works,1, 4B and 6C,,
962, 964, 972, 987, 1011, 1023 &amp; 1025,Dismantling of redundant infrastructure,1 and 6D,,
974, 975, 982, 985, 990, 991, 995, 996, 1000, 1006, 1045 &amp; 1049,Dismantling of redundant infrastructure,6D,,
980, 983, 984 &amp; 989,Construction of authorised development and mitigation works,1 and 6D,,
986, 1009, 1015, 1019, 1021 &amp; 1052,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6D,,
998, 999, 1001, 1003, 1005, 1017 &amp; 1018,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6D,,
1040,Dismantling of redundant infrastructure,6D,Removal of pylon foundations only to a depth of 1.5 metres,


1020,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6D,,
1046,Dismantling of redundant infrastructure,6D,,
1059,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1,,


1022, 1028, 1033, 1057, 1062, 1063, 1068, 1074, 1085, 1089, 1091, 1092, 1098, 1104, 1112, 1113, 1114, 1115, 1116, 1117, 1119, 1120, 1125, 1135, 1150, 1156 &amp; 1157,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6D,,
1053, 1069, 1102, 1127 &amp; 1153,Dismantling of redundant infrastructure,6D,Removal of pylon foundations only to a depth of 1.5 metres,
1060, 1088, 1118, 1121, 1123, 1124, 1133, 1146, 1147, 1148, 1151, 1159, 1161 &amp; 1162,Dismantling of redundant infrastructure,6D,,
1065, 1067, 1072, 1105, 1108, 1109, 1110, 1145, 1155, 1235, 1299, 1312, 1328, 1333, 1336, 1337, 1349, 1352, 1362, 1399, 1405, 1410, 1428, 1433, 1442 &amp; 1450,Construction of authorised development and mitigation works,1,,
1073, 1077, 1078, 1079, 1082, 1095, 1096, 1097, 1122, 1126, 1128, 1131 &amp; 1137,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1,,
1107 &amp; 1111,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6D,,
1129, 1130, 1132, 1134, 1138, 1143 &amp; 1164,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 4C and 6E,,
1167, 1173, 1179, 1181, 1182, 1194 &amp; 1195,Construction of authorised development and mitigation works,1, 4C and 6E,,
1169, 1188, 1190, 1198, 1199 &amp; 1241,Construction of authorised development and mitigation works,1 and 5C,,
1176,Construction of authorised development and mitigation works,1, 5C 5D, 6D and 6E,Removal of pylon foundations only to a depth of 1.5 metres,
1177, 1204, 1216 &amp; 1218,Construction of authorised development and mitigation works,1, 5C and 5D,,
1178, 1183 &amp; 1189,Dismantling of redundant infrastructure,5C,,
1186 &amp; 1187,Construction of authorised development and mitigation works,1, 5C and 5D,Removal of pylon foundations only to a depth of 1.5 metres,
1201, 1205, 1242, 1252, 1253 &amp; 1254,Construction of authorised development and mitigation works,1 and 5D,,
1214,Construction of authorised development and mitigation works,1, 4C and 6E,Removal of pylon foundations only to a depth of 1.5 metres,
1230,Construction of authorised development and mitigation works,1, 4C, 6E and 6F,Removal of pylon foundations only to a depth of 1.5 metres,
1219,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 5C,,
1225 &amp; 1226,Construction of authorised development and mitigation works,1, 5A and 5C,,
1239,Construction of authorised development and mitigation works,1, 5A, 5B, 5C and 5D,Removal of pylon foundations only to a depth of 1.5 metres,
1240,Construction of authorised development and mitigation works,1, 4C and 5C,,
1269, 1270, 1271, 1310, 1315, 1326, 1354, 1355, 1360, 1382, 1391, 1395, 1402, 1407, 1408, 1409, 1427, 1455, 1456, 1598, 1608, 1637 &amp; 1639,Construction of authorised development and mitigation works,1 and 6F,,
1272, 1276, 1277, 1300, 1306, 1332, 1341, 1343, 1344, 1356, 1357, 1401, 1422 &amp; 1425,Dismantling of redundant infrastructure,6F,,
1278, 1301, 1302, 1307, 1316, 1318, 1325, 1334, 1347, 1353 &amp; 1366,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6F,,
1279, 1317, 1329, 1346, 1364, 1415, 1649,,Dismantling of redundant infrastructure,6F,Removal of pylon foundations only to a depth of 1.5 metres,
1294, 1308, 1311, 1363, 1378, 1383, 1384, 1387, 1393, 1404, 1412 &amp; 1413,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6F,,
1601, 1602, 1611 &amp; 1613,Construction of authorised development and mitigation works,1 and 3,,
1614 &amp; 1625,Construction of authorised development and mitigation works,1, 3 and 6F,,


1385, 1389, 1411, 1439, 1458, 1467, 1487, 1488, 1489, 1495, 1496, 1555, 1563, 1566, 1575, 1596, 1597, 1604, 1633, 1643, 1663, 1666 &amp; 1669,Construction of authorised development and mitigation works,1 and 6F,,
1394, 1419, 1443, 1464, 1472, 1647, 1648, 1650, 1651, 1652, 1655, 1657, 1659, 1660, 1665 &amp; 1672,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6F,,
1429, 1430, 1434, 1505, 1508, 1531, 1539, 1540, 1558, 1588, 1589A, 1589B, 1589C, 1589D &amp; 1658,Dismantling of redundant infrastructure,6F,,
1448,Dismantling of redundant infrastructure,1 and 6F,,
1457, 1522, 1527, 1541, 1548, 1562, 1570, 1580, 1581, 1582, 1653, 1662, 1667 &amp; 1670,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6F,,
1463, 1466, 1468, 1473, 1474, 1475, 1479, 1480, 1481, 1482, 1484, 1485, 1486, 1490, 1491, 1493, 1494, 1497, 1498, 1509, 1514, 1521, 1553, 1554, 1556, 1565, 1576, 1579, 1587 &amp; 1605,Construction of authorised development and mitigation works,1,,
1471 &amp; 1668,Dismantling of redundant infrastructure,1 and 6F,Removal of pylon foundations only to a depth of 1.5 metres,
1511, 1544, 1549, 1561, 1573 &amp; 1661,Dismantling of redundant infrastructure,6F,Removal of pylon foundations only to a depth of 1.5 metres,


1392, 1593, 1635 &amp; 1636,Construction of authorised development and mitigation works,1 and 6F,,
1654 &amp; 1656,Dismantling of redundant infrastructure,6F,,


1,Dismantling of redundant infrastructure,6A,Pylon PX1,
2, 3, 4, 5, 6, 8, 9, 10, 12, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 139 &amp; 140,Dismantling of redundant infrastructure,6A,,
7, 38, 114, 137 &amp; 142,Dismantling of redundant infrastructure,6A,Removal of pylon foundations only to a depth of 1.5 metres,
11, 13, 14, 15, 16, 138, 141, 143, 237, 238, 239, 240, 241, 244, 245, 246, 247, 249, 250, 252 &amp; 253,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6A,,
144 &amp; 243,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 6A and 6B,,
145, 460, 461, 551, 555, 556, 558, 561, 562, 563, 564, 565, 567, 568, 569, 570, 572, 573, 574, 575, 578, 579, 580, 581, 587, 588, 589, 590, 596, 597, 600, 612, 614, 616, 617, 620, 623, 624, 681, 713, 715, 716, 717, 719, 856, 870, 872, 874, 878 &amp; 879,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6B,,
146, 147 &amp; 734,Dismantling of redundant infrastructure,1 and 6B,Removal of pylon foundations only to a depth of 1.5 metres,
148, 484, 489, 491, 492, 493, 494, 496, 497, 499, 500, 506, 508, 509, 510, 514, 515, 517, 519, 521, 523, 529, 530, 533, 547, 548, 598602, 603, 622, 686, 688, 689, 690, 692, 694, 698, 701, 703, 756, 757, 783, 784, 786, 795, 796, 896 &amp; 903,Dismantling of redundant infrastructure,6B,,
149 &amp; 298,Construction of the authorised development and mitigation works,1, 4A and 6B,Removal of pylon foundations only to a depth of 1.5 metres,
150,151, 284a, 284b, 285, 286, 287, 288, 291, 292, 294, 305a &amp; 488A,Construction of the authorised development and mitigation works,1, 4A and 6B,,
300,Construction of the authorised development and mitigation works,1 and 6B,,
301, 303, 304, 467 &amp; 478,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 4A and 6B,,
305b,Construction of the authorised development and mitigation works,1,,
468, 474, 475, 476, 480, 481, 482, &amp; 483,Dismantling of redundant infrastructure,4A and 6B,,
469, 470, 471, 472, 473 &amp; 488B,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,4A and 6B,,
477, 485, 486, 487, 490, 495, 501, 502, 504, 505, 507, 511, 512, 513, 516, 518, 520, 522, 524, 525, 531, 532, 534, 535, 537, 546, 549, 550, 554, 593, 595, 599, 601, 604, 605, 606, 611, 635, 637, 643, 649, 653, 657, 662, 667, 669, 675, 676, 684, 693, 695, 699, 702, 704, 707, 711, 712, 718, 724, 738, 749, 752, 753, 758, 764, 767, 769, 782, 789, 794, 797, 798, 799, 807, 820, 838, 844, 849, 853, 857, 863, 864, 866, 868, 869, 871, 873, 876 &amp; 880,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6B,,
479,Dismantling of redundant infrastructure,1, 4A and 6B,,
498, 503, 526, 527, 528, 536, 553, 609, 626, 631, 641, 652, 665, 706, 766, 770, 792, 811, 840, 851, 862, 867 &amp; 885,Dismantling of redundant infrastructure,6B,Removal of pylon foundations only to a depth of 1.5 metres,
905 &amp; 906,Dismantling of redundant infrastructure,4B and 6C,,
909,Dismantling of redundant infrastructure,1, 4B, 6B and 6C,Removal of pylon foundations only to a depth of 1.5 metres,
919, 924, 925, 926, 927, 928, 934, 935, 936, 937, 946, 947, 948, 949, 951 &amp; 952,Dismantling of redundant infrastructure,1, 4B and 6C,,
955 &amp; 961,Construction of the authorised development and mitigation works,1, 4B, 6C and 6D,Removal of pylon foundations only to a depth of 1.5 metres,
960, 993 &amp; 1002,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6C,,
962, 964, 972, 980, 983, 984, 987, 989, 1011, 1023, 1025 &amp; 1044,Dismantling of redundant infrastructure,1 and 6D,,
963, 969 &amp; 988,Dismantling of redundant infrastructure,1 and 6C,,
965, 971 &amp; 973,Construction of the authorised development and mitigation works,1, 4B and 6C,,
970,Construction of the authorised development and mitigation works,1 and 6D,,
974, 975, 982, 985, 990, 991, 995, 996, 1000, 1006 &amp; 1045,Dismantling of redundant infrastructure,6D,,
986, 1009, 1015, 1019 &amp; 1021,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6D,,
997, 998, 999, 1001, 1003, 1004, 1005, 1012, 1014, 1016, 1017, 1018, 1029, 1032, 1034, 1035, 1036 &amp; 1038,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6D,,
1027,Dismantling of redundant infrastructure,1 and 6D,Removal of pylon foundations only to a depth of 1.5 metres,
1040 &amp; 1049,Dismantling of redundant infrastructure,6D,Removal of pylon foundations only to a depth of 1.5 metres,


1020,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6D,,
1046,Dismantling of redundant infrastructure,6D,,


1022, 1028, 1033, 1052, 1057, 1062, 1063, 1068, 1074, 1085, 1089, 1091, 1092, 1098, 1104, 1112, 1113, 1114, 1115, 1116, 1117, 1119, 1120, 1125, 1135, 1150, 1156 &amp; 1157,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6D,,
1053, 1069, 1102, 1127 &amp; 1153,Dismantling of redundant infrastructure,6D,Removal of pylon foundations only to a depth of 1.5 metres,
1060, 1088, 1118, 1121, 1123, 1124, 1133, 1146, 1147, 1148, 1151, 1159, 1161 &amp; 1162,Dismantling of redundant infrastructure,6D,,
1086,Dismantling of redundant infrastructure,1 and 6D,,
1090, 1107 &amp; 1111,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6D,,
1129, 1130, 1132, 1134, 1136, 1138, 1143, 1149, 1152, 1164, 1165, 1261, 1263 &amp; 1264,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 4C and 6E,,
1166b,Construction of the authorised development and mitigation works,1, 4C, 5C, 6D and 6E,,
1167, 1170, 1172, 1173, 1175, 1179, 1180, 1182, 1191, 1192, 1194, 1195 &amp; 1200,Construction of the authorised development and mitigation works,1, 4C and 6E,,
1169, 1177, 1188, 1190, 1198, 1215, 1231, 1237, 1244 &amp; 1248,Construction of the authorised development and mitigation works,1 and 5C,,
1178, 1183 &amp; 1189,Dismantling of redundant infrastructure,5C,,
1201, 1205, 1210, 1213, 1242, 1252, 1253 &amp; 1254,Construction of the authorised development and mitigation works,1 and 5D,,
1214,Construction of the authorised development and mitigation works,1, 4C and 6E,Removal of pylon foundations only to a depth of 1.5 metres,
1219 &amp; 1236,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 5C,,
1224,Dismantling of redundant infrastructure,1, 5C and 5D,,
1225,Construction of the authorised development and mitigation works,1, 5A and 5C,,
1230,Construction of the authorised development and mitigation works,1, 4C, 6E and 6F,,
1232 &amp; 1238,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 4C and 5C,,
1240,Construction of the authorised development and mitigation works,1, 4C and 5C,,
1269, 1270, 1271, 1360, 1382, 1391, 1395, 1396, 1417, 1427, 1445, 1446, 1455, 1456, 1462, 1598, 1608, 1637 &amp; 1639,Construction of the authorised development and mitigation works,1 and 6F,,
1272, 1276, 1277, 1300, 1306, 1332, 1341, 1343, 1344, 1356, 1357, 1401, 1422 &amp; 1425,Dismantling of redundant infrastructure,6F,,
1275, 1281, 1282, 1285, 1287, 1293, 1294, 1297, 1303, 1308, 1309, 1311, 1313, 1315, 1319, 1320, 1324, 1326, 1327, 1331, 1339, 1342, 1350, 1351, 1354, 1359, 1363, 1365, 1367, 1375, 1376, 1377, 1378, 1381, 1383, 1384, 1386, 1387, 1390, 1393, 1402, 1403, 1404, 1409, 1412, 1413, 1414, 1416, 1420 1426, 1432, 1435, 1447 &amp; 1460,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6F,,
1278, 1301, 1302, 1307, 1316, 1318, 1325, 1334, 1347, 1353 &amp; 1366,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6F,,
1279, 1317, 1329, 1346, 1364, 1415 &amp; 1649,Dismantling of redundant infrastructure,6F,Removal of pylon foundations only to a depth of 1.5 metres,
1305, 1310, 1355, 1358, 1407, 1408 &amp; 1421,Dismantling of redundant infrastructure,1 and 6F,,
1614, 1603A &amp; 1603B,Construction of the authorised development and mitigation works,1, 3 and 6F,,
1612 &amp; 1625,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1, 3 and 6F,,


1385, 1389, 1411, 1418, 1439, 1449, 1458, 1465, 1592 1594, 1596, 1597, 1599, 1600, 1604, 1616, 1618, 1619, 1626, 1627A, 1627B, 1633, 1638, 1643, 1663, 1666 &amp; 1669,Construction of the authorised development and mitigation works,1 and 6F,,
1394, 1419, 1440, 1443, 1452, 1459, 1461, 1464, 1467, 1472, 1478, 1501, 1502, 1510, 1515, 1516, 1520, 1524, 1525, 1526, 1529, 1532, 1533, 1552, 1571, 1572, 1577, 1595, 1606, 1620A, 1620B, 1620C, 1620D, 1623, 1628A, 1628B, 1632, 1634, 1640, 1641, 1644, 1645, 1646, 1647, 1648, 1650, 1651, 1652, 1655, 1657, 1659, 1660, 1665, 1671 &amp; 1672,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1 and 6F,,
1429, 1430, 1434, 1505, 1508, 1531, 1539, 1540, 1558, 1588, 1589A, 1589B, 1589C, 1589D &amp; 1658,Dismantling of redundant infrastructure,6F,,
1431, 1448, 1453, 1487, 1488, 1489, 1495, 1496, 1519, 1523, 1547, 1555, 1559, 1563, 1564, 1566, 1575 &amp; 1664,Dismantling of redundant infrastructure,1 and 6F,,
1457, 1522, 1527, 1541, 1548, 1562, 1570, 1580, 1581, 1582, 1653, 1662, 1667 &amp; 1670,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,6F,,
1466 &amp; 1470A,Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access,1,,
1471 &amp; 1668,Dismantling of redundant infrastructure,1 and 6F,Removal of pylon foundations only to a depth of 1.5 metres,
1511, 1544, 1549, 1561, 1573 &amp; 1661,Dismantling of redundant infrastructure,6F,Removal of pylon foundations only to a depth of 1.5 metres,
1610 &amp; 1617,Construction of the authorised development and mitigation works,1, 3 and 6F,,


1392, 1593, 1635 &amp; 1636,Construction of authorised development and mitigation works,1 and 6F,,
1654 &amp; 1656,Dismantling of redundant infrastructure,6F,,


Headcorn Drive and Sandhurst Drive,Between points TR03.1 and TR03.4 (Headcorn Drive) and between TR03.2 and TR03.3 (Sandhurst Drive) as shown on Sheet 1.,Prohibition of vehicular access at any time.,
Vauxhall Road, Broad Oak Road and Shalloak Road,Between points TR05.1 and TR05.4 (Broad Oak Road and Shalloak Road) and between TR05.2 and TR05.3 (Vauxhall Road) as shown on Sheets 1 and 2.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.    Speed limit to be reduced to 30mph for the duration of the construction of the authorised development.  ,
Herne Bay Road,Between points TR08.1, and TR08.2 as shown on Sheets 2 and 3.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.    Speed limit to be reduced to 30mph for the duration of the construction of the authorised development.  ,
Hoath Road and Bredlands Road,Between points TR09.1 and TR9.4 (Hoath Road) and between TR09.2 and TR09.3 (Bredlands Road) as shown on Sheets 4 and 5.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.    Speed limit to be reduced to 30mph for the duration of the construction of the authorised development.  ,
Nethergong Hill and Sandpit Hill,Between points TR10.1, and TR10.2 as shown on Sheet 8.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.    Speed limit to be reduced to 30 mph for the duration of the construction of the authorised development.  ,


A28 (Island Road),Between points TR11.1, and TR11.2 as shown on Sheets 9 and 10.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.    Speed limit to be reduced to 30mph for the duration of the construction of the authorised development.  ,


Gore Street,Between points TR13.1, and TR13.2 as shown on Sheet 11.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.    Speed limit to be reduced to 30mph for the duration of the construction of the authorised development.  ,


Farleigh Road,Between points TR01.1, and TR01.2 as shown on Sheet 1.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.  ,
Ulcombe Gardens,Between points TR02.1 and TR02.2 and TR02.3 as shown on Sheet 1.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.  ,
Headcorn Drive, Westerham Close and Bicknor Close,Between points TR04.1 and TR04.7 via TR04.2 (Headcorn Drive) and between TR04.3 and TR04.4 (Bicknor Close) and between TR04.5 and TR04.6 (Westerham Close) as shown on Sheet 1.,  Prohibition of vehicular access at any time.    No waiting restriction between 07:00am to 07:00pm Monday to Sunday.  ,


A253 (Ramsgate Road),Between points TR12.1, and TR12.2 as shown on Sheet 11.,  Prohibition of vehicular access at any time.    Speed limit to be reduced to 30mph for the duration of the construction of the authorised development.  ,


Mayton Lane and Heel Lane,Between points TR06.1 and TR06.4 (Mayton Lane) and between TR06.2 and TR06.3 (Heel Road) as shown on Sheet 3.,Prohibition of vehicular access at any time.,
Barnett’s Lane,Between points TR07.1, and TR07.2 as shown on Sheet 3,Prohibition of vehicular access at any time.,


Hawthorn,Trees along boundary to rear of 18 Bicknor Close (tree group outside TPO area) as shown on Sheet 1,Removal of 31m 2 of group for pylon working area. (Trees assumed to form part of TPO).,Abbotsbury Housing Estate, Headcorn Drive TPO No 10, 1975/A1,
Mixed broadleaved species including ash, oak, hawthorn, cherry and hornbeam,Trees in woodland to rear of 26 and 28 Shalloak Road (tree group partly outside TPO area) as shown on Sheet 2,Removal of 335m 2 to create working area for removal of existing pylon. Area for removal represents maximum clearance required; pruning may be sufficient. (Trees assumed to form part of TPO).,Priest’s Meadow TPO No 6, 1989/W1,
Mixed broadleaved species including oak, ash, silver birch and hawthorn,Trees on eastern edge of Shelford Wood near to Shalloak Road (tree group partly outside TPO area) as shown on Sheet 2,Removal of 3,941m 2 , of which a small segment at northern end is certainly not part of the TPO. In addition, 377m 2 of trees to be managed by pruning where scaffolding is required for installation of 400kV line over adjacent road.,Shelford Wood, Broad Oak TPO No 17, 1990/W1,
Mixed broadleaved species including sweet chestnut, hazel, oak, silver birch, elder, hornbeam and white poplar,Northern part of Kemberland Wood as shown on Sheet 3,6,402m 2 of woodland to be managed by coppicing beneath 400kV line.,Kemberland Wood TPO No 2, 1990/W1,
Ash,Trees along eastern boundary of Kemberland Wood at northern end of boundary (tree group partly outside TPO area) as shown on Sheet 3,Removal of 610m 2 (single row of mature ash trees) due to oversail of 400kV line. (Trees assumed to form part of TPO).,Kemberland Wood TPO No 2, 1990/W1,
Mixed broadleaved species including oak, elm, sycamore and hawthorn,Tree belt to the east of Sunbeams, Wildwood and Bluebells, off Staines Hill (tree group adjacent to TPO area) as shown on Sheet 4,Removal of overhanging branches and trees on eastern edge of group as part of reptile mitigation (total of 424m 2 affected, split between TPO No 1, 2003 and TPO No 1, 2006). (Trees assumed to form part of TPO).,Sunbeams Cottage, Staines, Hill, Sturry TPO No 1, 2003/W1,
Mixed broadleaved species including oak, elm, sycamore and hawthorn,Tree belt to the east of Brambles, Fallows End, Touchwood House and Stonerock Hall, off Staines Hill (tree group adjacent to TPO area) as shown on Sheet 4,Removal of overhanging branches and trees on eastern edge of group (total of 424m 2 affected, split between TPO No 1, 2003 and TPO No 1, 2006). (Trees assumed to form part of TPO).,Land between Staines Hill and Babs Oak Hill, Sturry TPO No 1, 2006/W1,
Ash,Trees overhanging track to rear of 23 to 37 Seamark Close as shown on Sheet 12,Trees adjacent to existing track, minor pruning of overhanging branches may be required for vehicle access.,20–36 (inclusive) Seamark Close, Monkton TH/TPO/29(1981),

1825,c. clxvi,Canterbury Navigation and Sandwich Harbour Act,CXIII (Obstructions of the navigation to be removed),
1825,c. clxvi,Canterbury Navigation and Sandwich Harbour Act,CXVII (Persons destroying the works to be deemed guilty of felony),
1825,c. clxvi,Canterbury Navigation and Sandwich Harbour Act,CXX (Punishment of persons damaging fences),
1836,c. lxxv,South-eastern Railway,LXII (No Shaft to be sunk under the Railway),
1845,c. cxcvii,South Eastern Railway Act,XX XI (1 &amp; 2 Vict. c. 98, 3 &amp; 4 Vict. c. 97, 5 &amp; 6 Vict. c .55 and 7 &amp; 8 Vict. c. 85 incorporated),
1924,c. lxvi,Southern Railway Act,3 (incorporation of Railway Clauses Consolidation Act 1845 and Part I and V Railways Clauses Act 1863),


River Stour (Kent) IDB Land Drainage Byelaws 1990,  14. Vehicles not to be Driven on Banks    17. Fences, Excavations, Pipes etc    20. Damage to Property of the Board  ,