Control room workshop,30.0,40.0,5.0,,
Substation,20.0,25.0,4.0,,
Instrument room (DCS),6.0,8.0,4.0,,
Compressor house (2 off),20.0,28.0,10.0,,
First gas fill compressor and cooler package,6.0,28.0,7.0,,
Motor coolers (10 off),6.0,8.0,4.0,,
Gas coolers,18.0,22.0,5.0,,
Drying towers (4 off),4.0,4.0,10.0,,
Air cooled condensers (2 off),6.0,8.0,4.0,,
Regeneration heaters (6 off),12.0,6.0,5.0,,
Water heater buildings (2 off),10.0,25.0,8.0,,
Transformers  /VSD’s (5 off) ,6.0,15.0,5.0,,
Glycol storage (2 off),15.0,21.0,4.0,,
Gas Preheater Boiler Vents (4 off),0.8 (external diameter)  0.69 (internal diameter) ,–,10.0,10.0,
Glycol Regeneration Boiler Vents (6 off),0.8 (external diameter)  0.22 (internal diameter) ,–,10.0,10.0,
Emergency cold vent,0.60(Diameter),–,25.0,25.0,

Pumphouse for both weak brine and water booster pumps,12.5,65.0,4.0,,
Pump switchrooms (2 off),10.0,20.0,3.5,,
Control and amenities building,10.0,14.0,3.5,,
Distributed control system building,6.0,8.0,3.5,,
Electrical compound/switchroom (Work No 23),20.0,25.0,3.5,,
Liquid nitrogen storage vaporisation package,8.0,16.0,3.0,,
Liquid nitrogen storage compound,10.0,20.0,4.0,,
Brine de-gassing tanks (2 off),15.0,20.0,4.0,,
Within concrete bund,20.0,25.0,3.5,,
Nitrogen vent,0.08 (Diameter),,9.0,5.0,

Compound with security fence and building listed below:,50.0,50.0,3.0,2.4,
Control kiosk,3.0,4.0,2.4,,
Security lighting/camera,1.0 (diameter),,5.5,3.0,

Compound with security fence for all equipment listed below:,50.0,80.0,3.0,2.4,
Transformers (2 off),5.0,12.0,7.0,,
Isolators (5 off),2.5,6.0,6.5,,
Power correction equipment,2.5,3.0,4.0,,
Control room,12.0,8.0,3.6,,
Switchroom,12.0,20.0,3.6,,
New 132kV pylon (1 off)  (Adjacent to existing pylon) ,5.0 at base  Arms =14.0 ,5.0 at base,28.0,,

Compound for equipment listed below:,60.0,80.0,2.4,2.0,
Drilling rig (vehicle mounted),3.0,15.0,36.0,,
Cement silos (2 off),2.0,2.0,6.0,,

Compound and security fence for equipment listed below:,50.0,50.0,24.0,2.0,
Solution mining wellhead,1.0,1.0,2.0,,
Meter house,2.5,3.0,2.5,,

Compound with security fence for equipment listed below:,50.0,50.0,3.0,2.0,
Gas wellhead,1.0,1.0,4.0,,
Control panel,3.0,4.0,3.0,,
Glycol injection package,3.0,4.0,4.0,,
Security lighting/camera,1.0 (Diameter),,5.5,3.0,

Pumping tank,6.0 (Diameter),,6.0,,
Surge vessel (in bund),2.5,7.0,3.0,,

Existing pumphouse (to be refurbished),10.0,12.0,4.0,,
Surge vessel,1.5(Diameter),3.5,2.5,,
Transformer,3.0,4.0,2.5,,

Pipebridge with walkway,5.0,50.0,15.5,18.0,
Brine discharge pipeline,0.5(Diameter),600.0,,,
Diffuser pipe,0.4(Diameter),15.0,,,

Compound with security fence for equipment listed below:,50.0,60.0,3.0,2.4,
Pig trap area,8.0,17.0,2.4,,
Control equipment kiosk,3.0,4.0,2.4,,
Meter cabinet,0.6,1.5,1.5,,
Security lighting/camera,1.0(Diameter),,6.0,3.0,

3 – Drakelow Farm,32,34,34,
4 – Halfway House,32,33,33,
7 – Brownhayes Farm,30,37,37,
8 – Drakelow Hall Farm,31,32,32,
10 – Drakelow Gorse Farm,30,33,33,
14 – Newholme Farm,31,33,33,

151.525,2.95,-199,115.8,-83.2,
325.3,6.6,-201,122.4,-78.6,
408.05,3.9,-203,124.4,-78.6,
611,6,-202,127.9,-74.1,
1413.5,27,-205,135.2,-69.8,
1665,10,-207,136.6,-70.4,
2695,10,-207,140.8,-66.2,
4995,10,-207,146.2,-60.8,

County of Cheshire,  District of Cheshire West and Chester ,Yatehouse Lane  For the purposes of Works Nos 5A, 5B, 5C, 5D, 6, 19B and 22.  (drawing nos. 13-03-01/HOL/24/324, 325, 326)  Where crossed by the authorised development within the Order limits. ,
County of Cheshire  District of Cheshire West and Chester ,Drakelow Lane  For the purposes of Work Nos: 5A, 5B, 5C, 5D, 6, 22, 28B, 29A and 29B.  (drawing nos.13-03-01/HOL/24/322, 323)  Where crossed by the authorised development within the Order limits. ,
County of Cheshire  District of Cheshire West and Chester ,Rudheath RB7  For the purposes of Work Nos: 5A, 5B, 5C, 5D, 6, 22, 26, 28B, 29A and 29B.  (drawing nos. 13-03-01/HOL/24/322 and 327)  Where crossed by the authorised development within the Order limits. ,

County of Cheshire, District of Cheshire West and Chester,Yatehouse Lane,Formation of permanent gated highway access with visibility splay including, removal of hedgerow, altering of carriageway alignment and verge for the purpose of Work No.6 and optional change to bellmouth of existing access point (drawing No.13-03-01/HOL/24/407).,
County of Cheshire, District of Cheshire West and Chester,Drakelow Lane,Formation of two new gated highway accesses with visibility splay including removal of hedgerow, altering of carriageway alignment and verge for the purpose of Work No.6 (drawing No.13-03-01/HOL/24/408).,

County of Cheshire, District of Cheshire West and Cheshire,Yatehouse Lane,For the purposes of Works Nos: 5A, 5B, 5C, 5D, 6, 19B.,
For a distance of 168m measured between points 5 and 6 on the street works and access plan (see drawing No.13-03-01/HOL/24/413).,
For a distance of 126m measured between points 7 and 8 on the street works and access plan (See drawing No.13-03-01/HOL/24/413.,
For a distance of 120m measured between points 9 and 10 on the street works and access plan (see drawing No.13-03-01/HOL/24/413).,
Drakelow Lane,For the purposes of Work Nos: 5A, 5B, 5C, 5D, 6, 22, 28B, 29A and 29B,
For a distance of 54m measured between points 1 and 2 on the street works and access plan (see drawing No.13-03-01/HOL/24/413).,
For a distance of 152m measured between points 3 and 4 on the street works and access plan (see drawing No.13-03-01/HOL/24/413).,
Restricted Byway (RB7),For the purposes of Work Nos:5A, 5B, 5C, 5D, 6, 22, 26, 28B, 29A and 29B-  Rudheath RB7 – temporary stopping up of 195m, as shown on drawing No.13-03-01/HOL/24/327. ,

County of Cheshire, District of Cheshire West and Chester,Holford, site private road access/egress and crossing of Yatehouse Lane formed within Work No.6.  Access to site access road from Yatehouse Lane and crossing of Yatehouse Lane and egress from the site private access road to Yatehouse Lane as shown on the streets and access plan between points 5 and 6 (see drawing No.13-03-01/HOL/24/413). ,
,Holford, site private road access/egress and crossing of Drakelow Lane formed within Work No.6.  Access to private access from Drakelow Lane and crossing of Drakelow Lane and egress from the site private access road to Drakelow Lane as shown on the streets and access plan between points 3 and 4. (see drawing No.13-03-01/HOL/24/413). ,
(1)  Area ,(2)  Land affected ,(3)  Purpose of temporary closure ,
The Borough of Halton, County of Cheshire,The area of the Weaver Navigation Canal as shown hatched in black on drawing No.13-03-01/HOL/24/236,For the purposes of Work No.10 as set out in Schedule 1.,

District of Cheshire West and Chester County of Cheshire,1.04 to 1.19,Construction and carrying out of the authorised development, including; provision of wellhead compounds for storage of equipment; provision of pipeline, cable and site access road networks; worksite; landscaping; and access for these same purposes.,Work Nos: 2U, 2T, 2S, 5A, 5B, 5C, 5D, 6, 22 and 35,
District of Cheshire West and Chester County of Cheshire,2.04 to 2.16,Construction and carrying out of the authorised development, including; provision of wellhead compounds for storage of equipment; provision of pipeline cable and site access road networks; worksite; landscaping; and access for these same purposes.,Work Nos: 2P, 2Q, 2R, 5A, 5B, 5C, 5D, 6, 22, 31, 34 and 35,
District of Cheshire West and Chester County of Cheshire,3.03 to 3.11,Construction and carrying out of the authorised development, including; provision of wellhead compounds for storage of equipment; provision of pipeline cable and site access road networks; worksite; landscaping; and access for these same purposes.,Work Nos: 2M, 2N, 5A, 5B, 5C, 5D, 6, 22 and 35,
District of Cheshire West and Chester County of Cheshire,4.02 to 4.06,Construction and carrying out of the authorised development, including; provision of wellhead compounds for storage of equipment; provision of pipeline cable and site access road networks; worksite; landscaping; and access for these same purposes.,Work Nos: 2K, 5A, 5B, 5C, 5D, 6, 22 and 35,
District of Cheshire West and Chester County of Cheshire,5.01,Construction and carrying out of the authorised development, including; provision and fit-out of gas marshalling compound; provision of pipeline, cable and site access road networks; diversion of overhead power lines; worksite; and access for these same purposes.,Work Nos: 5A, 5B, 5C, 5D, 6, 19B and 22,