SCHEDULE 1AUTHORISED DEVELOPMENT

1.  The construction and operation of a nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act in the London Borough of Enfield comprising—

(1) Works No. 1a —an electricity and heat generating station located at the Edmonton EcoPark, fuelled by up to 700,000 tonnes of waste per annum and with an electrical output of up to 70 megawatts of electricity (MWe) (gross), comprising the following buildings, structures and plant, located within the limits of deviation identified on drawing C_0002 Rev 01 of the works plans—

(a)a main building housing—

(i)a tipping hall;

(ii)waste bunker and waste handling equipment;

(iii)two process lines (with each line having a capacity of up to 350,000 tonnes of waste per annum), consisting of a moving grate, furnace, boiler and a flue gas treatment plant;

(iv)facilities for the recovery of incinerator bottom ash and air pollution control residue;

(v)steam turbines for electricity generation including equipment for heat off-take; and

(vi)a control room containing the operational and environmental control and monitoring systems and offices;

(b)entry and exit ramps to the electricity and heat generating station;

(c)a stack containing flues for flue gas exhaust;

(d)cooling equipment; and

(e)an observation platform enclosure.