The Boston Barrier Order 2017

Temporary closing of river in connection with worksE+W

17.—(1) Regardless of anything in any other enactment or in any rule of law, the Agency may temporarily close the river or any part of it within the limits of deviation, to navigation during or for the purposes of executing any works or doing anything authorised by or under this Order.

(2) In exercising the powers conferred by this article, the Agency must seek to minimise interference with navigation on the river so far as is reasonably practicable and consistent with the efficient and economical execution of the works.

(3) The Agency must not exercise the powers conferred by paragraph (1) so as—

(a)to preclude access from the river to the Wet Dock; or

(b)to close all or part of the river in connection with an activity referred to in paragraph (4) for a period longer than that specified in that paragraph,

without the consent of the Harbour Authority (such consent not to be unreasonably withheld or delayed) and must in any event, unless the Harbour Authority agrees otherwise, give the Harbour Authority not less than 7 days’ advance notice of any closure provided always that nothing in this paragraph affects the Agency’s exercise of its powers under article 44 (power to operate scheduled works).

(4) The periods specified for the purposes of paragraph (3) are—

(a)in connection with constructing works, a maximum period in respect of any one closure of 2 days;

(b)in connection with maintaining works, one period of up to 12 hours within any one month.

(5) Subject to paragraph 11 of Schedule 8 (protection of Port of Boston) neither the Agency nor the Harbour Authority is to be liable for any costs, damages or expenses whatsoever incurred by any person as a result, directly or indirectly, of any closure of the river under paragraph (1).

Commencement Information

I1Art. 17 in force at 2.1.2018, see art. 1