Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Articles 2(1), 3 and 4

SCHEDULE 1E+WAUTHORISED DEVELOPMENT

Commencement Information

I1Sch. 1 in force at 10.8.2016, see art. 1

Within the Borough of Redcar and Cleveland, and the Borough of Stockton-on-Tees

Nationally Significant Infrastructure ProjectE+W

Works No. 1 - within the area described on the works plans as Works No. 1—

(1) dredging of approach channel and berth pocket; and

(2) the demolition of the existing jetty and associated infrastructure

Works No. 2 - within the area described on the works plans as Works No. 2—

(1) a quay (constructed within the quay limits and in 2 phases) being either—

(a)a quay of solid construction comprising a quay wall and reclamation behind it on the south side of the River Tees; or

(b)a quay of open construction comprising—

(i)a suspended deck supported by piles and a revetment on a re-graded slope on the south side of the River Tees; and

(ii)the erection of three approach bridge structures;

(2) erection of ship loaders and associated infrastructure including ship loader rails;

(3) erection of surge bins and transfer towers; and

(4) extension, modification or replacement of pipe and provision of an additional pipe for flow control between Works No. 3 and Works No. 1.

Associated DevelopmentE+W

Works No. 3 - within the area described on the works plans as Works No. 3—

(1) the lagoon habitat enhancement works; and

(2) extension, modification or replacement of pipe and provision of an additional pipe for flow control entering Works No. 2 from the lagoon.

Works No. 4 - within the area described on the works plans as Works No. 4—

(1) 2 parallel conveyors in a single housing (on supports and including transfer stations connected to the housing which are comprised in Works No. 5) to transfer polyhalite from the materials handling facility to the ship loaders and surge bins comprised in Works No. 2 running between the points A-B-C shown on the works plans.

Works No. 5 - within the area described in the works plans as Works No. 5 in connection with Works Nos. 1 to 4 and 6 to 11—

(1) vehicular and pedestrian access;

(2) construction space;

(3) access for construction and maintenance;

(4) conveyer footings and supports connecting with Works No. 4;

(5) transfer towers connecting with Works No. 4;

(6) surface and foul water disposal arrangements;

(7) signage;

(8) lighting;

(9) security fencing and gating including the arrangements for maintaining access for owners of structures along the northern boundary of the Order limits shown on Document 3.16;

(10) temporary acoustic fencing and visual screening;

(11) CCTV;

(12) services: and

(13) security control (to the north-east of Works No. 10).

Works No. 6A - within the area described on the works plans as Works No. 6A—

(1) temporary material storage and preparation and plant area;

(2) temporary parking;

(3) temporary offices;

(4) temporary stores:

(5) temporary lighting; and

(6) temporary security fencing and gating.

Works No. 6B - within the area described in the works plans as Works No. 6B—

(1) substation; and

(2) car parking and screen fencing.

Works No. 7 - within the area described on the works plans as Works No. 7—

(1) temporary material storage and preparation and plant area;

(2) temporary parking;

(3) temporary offices;

(4) temporary stores;

(5) temporary lighting; and

(6) temporary security fencing and gating.

Works No. 8 - within the area described on the works plans as Works No. 8—

(1) temporary material storage and preparation and plant area;

(2) temporary parking;

(3) temporary offices;

(4) temporary stores:

(5) temporary lighting; and

(6) temporary security fencing and gating.

Works No. 9 - within the area described in the works plans as Works No. 9—

(1) general services building;

(2) parking;

(3) substation;

(4) below ground waste water storage tank; and

(5) ancillary infrastructure including screen fencing.

Works No. 10 - within the area described on the works plans as Works No. 10—

(1) temporary material storage and preparation and plant area;

(2) temporary parking;

(3) temporary offices;

(4) temporary stores;

(5) temporary lighting; and

(6) temporary security fencing and gating.

Works No. 11 - within the area described on the works plans as Works No. 11—

(1) temporary material storage and preparation and plant area;

(2) temporary parking;

(3) temporary offices;

(4) temporary stores;

(5) temporary lighting; and

(6) temporary security fencing and gating.

Works No. 12 - within the area described on the works plans as Works No.12—

(1) works to improve the western most arm of the A1085 roundabout the general arrangement of which is shown on the highway works plan including—

(a)widening the carriageway;

(b)construction of a new splitter island; and

(c)reconstruction and resurfacing works.

Works Nos. 1 to 12 to be carried out in accordance with the parameters set out in the parameters table.

In connection with Works Nos. 1 to 12 such development within the Order limits but excluding the lagoon as may be necessary or expedient for the purposes of or in connection with the construction or use of the nationally significant infrastructure project and associated development described in Works Nos. 1 to 12, provided that such works do not give rise to any materially new or materially worse environmental effects in comparison with those assessed in the environmental statement or any updated environmental information supplied under the 2009 EIA Regulations.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources