44.—(1) National Grid must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
(a)the access and rights of way plans;
(b)the Book of Reference;
(c)the CEMP;
(d)the design drawings;
(e)the Land Plans;
(f)the Landscape Drawings;
(g)the Public Rights of Navigation Plan;
(h)the Traffic Regulation Plans;
(i)the trees and hedges to be removed or affected plans; F1...
(j)the Works Plans;F2...
(k)the other plans and drawings in Part 10 of Schedule 2[F3; and]
[F4(l) Special Category Land and Crown Land Plans,]
for certification that they are true copies of the documents referred to in this Order.
(2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
Textual Amendments
F1Word in art. 44(1)(i) omitted (21.7.2017) by virtue of The National Grid (Hinkley Point C Connection Project) (Correction) Order 2017 (S.I. 2017/786), art. 1, Sch.
F2Word in art. 44(1)(j) omitted (21.7.2017) by virtue of The National Grid (Hinkley Point C Connection Project) (Correction) Order 2017 (S.I. 2017/786), art. 1, Sch.
F3Word in art. 44(1)(k) substituted (21.7.2017) by The National Grid (Hinkley Point C Connection Project) (Correction) Order 2017 (S.I. 2017/786), art. 1, Sch.
F4Art. 44(1)(l) inserted (21.7.2017) by The National Grid (Hinkley Point C Connection Project) (Correction) Order 2017 (S.I. 2017/786), art. 1, Sch.