PART 6MISCELLANEOUS AND GENERAL
Certification of plans etc.39.
(1)
The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
(a)
the access and rights of way plans (Document 2.3A-F);
(b)
the book of reference (Document 4.3C);
(c)
the construction management framework plan (Document 6.10);
(d)
the construction management strategy for safeguarding the Derwent Valley Aqueduct (Document 6.14);
(e)
the design and access statement (Document 6.9);
(f)
drawing of Quarry Exit at J24 (NTH/209/SK137 P2) (Document 6.26);
(g)
the environmental statement (Document 5.2);
(h)
the highway classifications plans (Document 2.5A and B);
(i)
the highways works components plans (Document 2.13a-c);
(j)
the illustrative rail interchange drawings (Document 2.12A-B);
(k)
the land plans (Document 2.1A-F);
(l)
the management strategy for the safeguarding of East Midlands Airport (Document 6.12);
(m)
the parameters plans (Document 2.10);
(n)
the regulation 6(2) plans (Document 2.4A-N);
(o)
the schedule of archaeological works (Document 6.24);
(p)
site waste management framework plan (Document 6.11);
(q)
the speed limit plans (Document 2.7A and B);
(r)
site wide travel plan (Document 6.25);
(s)
the traffic regulation plans (Document 2.6A-D); and
(t)
the works plans (Document 2.2A-F),
for certification that they are true copies of the documents referred to in this Order.
(2)
A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.