
Print Options
PrintThe Whole
Instrument
PrintThe Whole
Schedule
PrintThe Whole
Part
PrintThis
Cross Heading
only
Status:
This is the original version (as it was originally made).
Class N – development by the Crown on operational Crown land connected to shipping etc
Permitted development
N. Development by or on behalf of the Crown or its lessees on operational Crown land where the development is required—
(a)for the purposes of shipping; or
(b)at a dock, pier, pontoon or harbour in connection with the embarking, disembarking, loading, discharging or transport of military or civilian personnel, military equipment, munitions, or other items.
Development not permitted
N.1 Development is not permitted by Class N if it consists of or includes the construction or erection of a bridge or other building not required in connection with the handling of traffic.
Interpretation of Class N
N.2 For the purposes of Class N, references to the construction or erection of any building or structure include references to the reconstruction or alteration of a building or structure where its design or external appearance would be materially affected.
Back to top