J.1 Development is not permitted by Class J if—
(a)it consists of the drilling of boreholes for petroleum exploration;
(b)any operation would be carried out within 50 metres of any part of an occupied residential building or a building occupied as a hospital or school;
[F1(c)any operation would be carried out within a National Park, an area of outstanding national beauty, a site of archaeological interest, a site of special scientific interest or the Broads;]
(d)any explosive charge of more than 1 kilogram would be used;
(e)any excavation referred to in Class J(c) would exceed 10 metres in depth or 12 square metres in surface area;
(f)in the case described in Class J(c) more than 10 excavations would, as a result, be made within any area of 1 hectare within the land during any period of 24 months; or
(g)any structure assembled or provided would exceed [F215] metres in height, or, where the structure would be within 3 kilometres of the perimeter of an aerodrome, 3 metres in height.
Textual Amendments
F1Sch. 2 Pt. 17 Class J para. J.1(c) substituted (6.4.2016) by The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2016 (S.I. 2016/332), arts. 1, 14(a)(i) (with art. 15(1))
F2Word in Sch. 2 Pt. 17 Class J para. J.1(g) substituted (6.4.2016) by The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2016 (S.I. 2016/332), arts. 1, 14(a)(ii)